Code of Federal Regulations (alpha)

CFR /  Title 30  /  Part 780: Surface Mining Permit Applications_Minimum Requirement For Reclamation And Operation Plan

Section No. Description
Section 780.1 Objectives
Section 780.2 Responsibilities
Section 780.4 Information collection
Section 780.10 Operation plan: General requirements
Section 780.11 Operation plan: Existing structures
Section 780.12 Operation plan: Blasting
Section 780.13 Operation plan: Maps and plans
Section 780.14 Air pollution control plan
Section 780.15 Fish and wildlife information
Section 780.16 Reclamation plan: General requirements
Section 780.18 Hydrologic information
Section 780.21 Geologic information
Section 780.22 Reclamation plan: Land use information
Section 780.23 Reclamation plan: Siltation structures, impoundments, banks, dams, and embankments
Section 780.25 Reclamation plan: Surface mining near underground mining
Section 780.27 Diversions
Section 780.29 Protection of publicly owned parks and historic places
Section 780.31 Relocation or use of public roads
Section 780.33 Disposal of excess spoil
Section 780.35 Road systems
Section 780.37 Support facilities
Section 780.38 Scope