Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 270: Epa Administered Permit Programs: The Hazardous Waste Permit Program

Section No. Description
Section 270.1 Definitions
Section 270.2 Considerations under Federal law
Section 270.3 Effect of a permit
Section 270.4 Noncompliance and program reporting by the Director
Section 270.5 References
Section 270.6 General application requirements
Section 270.10 Signatories to permit applications and reports
Section 270.11 Confidentiality of information
Section 270.12 Contents of part A of the permit application
Section 270.13 Contents of part B: General requirements
Section 270.14 Specific part B information requirements for containers
Section 270.15 Specific part B information requirements for tank systems
Section 270.16 Specific part B information requirements for surface impoundments
Section 270.17 Specific part B information requirements for waste piles
Section 270.18 Specific part B information requirements for incinerators
Section 270.19 Specific part B information requirements for land treatment facilities
Section 270.20 Specific part B information requirements for landfills
Section 270.21 Specific part B information requirements for boilers and industrial furnaces burning hazardous waste
Section 270.22 Specific part B information requirements for miscellaneous units
Section 270.23 Specific part B information requirements for process vents
Section 270.24 Specific part B information requirements for equipment
Section 270.25 Special part B information requirements for drip pads
Section 270.26 Specific Part B information requirements for air emission controls for tanks, surface impoundments, and containers
Section 270.27 Part B information requirements for post-closure permits
Section 270.28 Permit denial
Section 270.29 Conditions applicable to all permits
Section 270.30 Requirements for recording and reporting of monitoring results
Section 270.31 Establishing permit conditions
Section 270.32 Schedules of compliance
Section 270.33 Transfer of permits
Section 270.40 Modification or revocation and reissuance of permits
Section 270.41 Permit modification at the request of the permittee
Section 270.42 Termination of permits
Section 270.43 Duration of permits
Section 270.50 Continuation of expiring permits
Section 270.51 Permits by rule
Section 270.60 Emergency permits
Section 270.61 Hazardous waste incinerator permits
Section 270.62 Permits for land treatment demonstrations using field test or laboratory analyses
Section 270.63 Interim permits for UIC wells
Section 270.64 Research, development, and demonstration permits
Section 270.65 Permits for boilers and industrial furnaces burning hazardous waste
Section 270.66 RCRA standardized permits for storage and treatment units
Section 270.67 Remedial Action Plans (RAPs)
Section 270.68 Qualifying for interim status
Section 270.70 Operation during interim status
Section 270.71 Changes during interim status
Section 270.72 Termination of interim status
Section 270.73 Why is this subpart written in a special format?
Section 270.79 What is a RAP?
Section 270.80 When do I need a RAP?
Section 270.85 Does my RAP grant me any rights or relieve me of any obligations?
Section 270.90 How do I apply for a RAP?
Section 270.95 Who must obtain a RAP?
Section 270.100 Who must sign the application and any required reports for a RAP?
Section 270.105 What must I include in my application for a RAP?
Section 270.110 What if I want to keep this information confidential?
Section 270.115 To whom must I submit my RAP application?
Section 270.120 If I submit my RAP application as part of another document, what must I do?
Section 270.125 What is the process for approving or denying my application for a RAP?
Section 270.130 What must the Director include in a draft RAP?
Section 270.135 What else must the Director prepare in addition to the draft RAP or notice of intent to deny?
Section 270.140 What are the procedures for public comment on the draft RAP or notice of intent to deny?
Section 270.145 How will the Director make a final decision on my RAP application?
Section 270.150 May the decision to approve or deny my RAP application be administratively appealed?
Section 270.155 When does my RAP become effective?
Section 270.160 When may I begin physical construction of new units permitted under the RAP?
Section 270.165 After my RAP is issued, how may it be modified, revoked and reissued, or terminated?
Section 270.170 For what reasons may the Director choose to modify my final RAP?
Section 270.175 For what reasons may the Director choose to revoke and reissue my final RAP?
Section 270.180 For what reasons may the Director choose to terminate my final RAP, or deny my renewal application?
Section 270.185 May the decision to approve or deny a modification, revocation and reissuance, or termination of my RAP be
Section 270.190 When will my RAP expire?
Section 270.195 How may I renew my RAP if it is expiring?
Section 270.200 What happens if I have applied correctly for a RAP renewal but have not received approval by the time my old RAP
Section 270.205 What records must I maintain concerning my RAP?
Section 270.210 How are time periods in the requirements in this subpart and my RAP computed?
Section 270.215 How may I transfer my RAP to a new owner or operator?
Section 270.220 What must the State or EPA Region report about noncompliance with RAPs?
Section 270.225 May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation
Section 270.230 Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid fuel boilers and
Section 270.235 What is a RCRA standardized permit?
Section 270.250 Who is eligible for a standardized permit?
Section 270.255 What requirements of part 270 apply to a standardized permit?
Section 270.260 How do I apply for a standardized permit?
Section 270.270 What information must I submit to the permitting agency to support my standardized permit application?
Section 270.275 What are the certification requirements?
Section 270.280 What general types of information must I keep at my facility?
Section 270.290 What container information must I keep at my facility?
Section 270.300 What tank information must I keep at my facility?
Section 270.305 What equipment information must I keep at my facility?
Section 270.310 What air emissions control information must I keep at my facility?
Section 270.315 How do I modify my RCRA standardized permit?
Section 270.320 Purpose and scope