Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 51: Requirements For Preparation, Adoption, And Submittal Of Implementation Plans

Section No. Description
Section 51.1 What tools are available to help prepare and report emissions data?
Section 51.5 What data does my state need to report to EPA?
Section 51.15 What are the emission thresholds that separate point and nonpoint sources?
Section 51.20 What geographic area must my state's inventory cover?
Section 51.25 When does my state report which emissions data to EPA?
Section 51.30 How can my state equalize the emission inventory effort from year to year?
Section 51.35 In what form and format should my state report the data to EPA?
Section 51.40 Where should my state report the data?
Section 51.45 What definitions apply to this subpart?
Section 51.50 Definitions
Section 51.100 Stipulations
Section 51.101 Public hearings
Section 51.102 Submission of plans, preliminary review of plans
Section 51.103 Revisions
Section 51.104 Approval of plans
Section 51.105 Attainment and maintenance of national standards
Section 51.110 Description of control measures
Section 51.111 Demonstration of adequacy
Section 51.112 Emissions data and projections
Section 51.114 Air quality data and projections
Section 51.115 Data availability
Section 51.116 Additional provisions for lead
Section 51.117 Stack height provisions
Section 51.118 Intermittent control systems
Section 51.119 Requirements for State Implementation Plan revisions relating to new motor vehicles
Section 51.120 Findings and requirements for submission of State implementation plan revisions relating to emissions of oxides of
Section 51.121 Emissions reporting requirements for SIP revisions relating to budgets for NOX emissions
Section 51.122 Findings and requirements for submission of State implementation plan revisions relating to emissions of oxides of nitrogen
Section 51.123 Findings and requirements for submission of State implementation plan revisions relating to emissions of sulfur dioxide
Section 51.124 Determination of widespread use of ORVR and waiver of CAA section 182(b)(3) Stage II gasoline vapor recovery requirements
Section 51.126 Classification of regions for episode plans
Section 51.150 Significant harm levels
Section 51.151 Contingency plans
Section 51.152 Reevaluation of episode plans
Section 51.153 Legally enforceable procedures
Section 51.160 Public availability of information
Section 51.161 Identification of responsible agency
Section 51.162 Administrative procedures
Section 51.163 Stack height procedures
Section 51.164 Permit requirements
Section 51.165 Prevention of significant deterioration of air quality
Section 51.166 Ambient air quality monitoring requirements
Section 51.190 General
Section 51.210 Emission reports and recordkeeping
Section 51.211 Testing, inspection, enforcement, and complaints
Section 51.212 Transportation control measures
Section 51.213 Continuous emission monitoring
Section 51.214 Requirements for all plans
Section 51.230 Identification of legal authority
Section 51.231 Assignment of legal authority to local agencies
Section 51.232 General plan requirements
Section 51.240 Nonattainment areas for carbon monoxide and ozone
Section 51.241 Legally enforceable compliance schedules
Section 51.260 Final compliance schedules
Section 51.261 Extension beyond one year
Section 51.262 Resources
Section 51.280 Copies of rules and regulations
Section 51.281 Public notification
Section 51.285 Electronic reporting
Section 51.286 Purpose and applicability
Section 51.300 Definitions
Section 51.301 Implementation control strategies for reasonably attributable visibility impairment
Section 51.302 Exemptions from control
Section 51.303 Identification of integral vistas
Section 51.304 Monitoring for reasonably attributable visibility impairment
Section 51.305 Long-term strategy requirements for reasonably attributable visibility impairment
Section 51.306 New source review
Section 51.307 Regional haze program requirements
Section 51.308 Requirements related to the Grand Canyon Visibility Transport Commission
Section 51.309 Annual air quality data report
Section 51.320 Annual source emissions and State action report
Section 51.321 Sources subject to emissions reporting
Section 51.322 Reportable emissions data and information
Section 51.323 Progress in plan enforcement
Section 51.324 Reportable revisions
Section 51.326 Enforcement orders and other State actions
Section 51.327 Request for 18-month extension
Section 51.341 Applicability
Section 51.350 Enhanced I/M performance standard
Section 51.351 Basic I/M performance standard
Section 51.352 Network type and program evaluation
Section 51.353 Adequate tools and resources
Section 51.354 Test frequency and convenience
Section 51.355 Vehicle coverage
Section 51.356 Test procedures and standards
Section 51.357 Test equipment
Section 51.358 Quality control
Section 51.359 Waivers and compliance via diagnostic inspection
Section 51.360 Motorist compliance enforcement
Section 51.361 Motorist compliance enforcement program oversight
Section 51.362 Quality assurance
Section 51.363 Enforcement against contractors, stations and inspectors
Section 51.364 Data collection
Section 51.365 Data analysis and reporting
Section 51.366 Inspector training and licensing or certification
Section 51.367 Public information and consumer protection
Section 51.368 Improving repair effectiveness
Section 51.369 Compliance with recall notices
Section 51.370 On-road testing
Section 51.371 State Implementation Plan submissions
Section 51.372 Implementation deadlines
Section 51.373 Implementation plan revision
Section 51.390 Applicability
Section 51.490 Definitions
Section 51.491 State program election and submittal
Section 51.492 State program requirements
Section 51.493 Use of program revenues
Section 51.494 State implementation plan (SIP) or Tribal implementation plan (TIP) revision
Section 51.851 Definitions
Section 51.900 Applicability of part 51
Section 51.901 Which classification and nonattainment area planning provisions of the CAA shall apply to areas designated nonattainment for
Section 51.902 How do the classification and attainment date provisions in section 181 of subpart 2 of the CAA apply to areas subject to
Section 51.903 How do the classification and attainment date provisions in section 172(a) of subpart 1 of the CAA apply to areas subject to
Section 51.904 How do areas transition from the 1-hour NAAQS to the 1997 8-hour NAAQS and what are the anti-backsliding provisions?
Section 51.905 Redesignation to nonattainment following initial designations for the 8-hour NAAQS
Section 51.906 For an area that fails to attain the 8-hour NAAQS by its attainment date, how does EPA interpret sections 172(a)(2)(C)(ii) and
Section 51.907 What modeling and attainment demonstration requirements apply for purposes of the 8-hour ozone NAAQS?
Section 51.908 What requirements for reasonable further progress (RFP) under sections 172(c)(2) and 182 apply for areas designated nonattainment
Section 51.910 What requirements apply for reasonably available control technology (RACT) and reasonably available control measures (RACM)
Section 51.912 How do the section 182(f) NOX exemption provisions apply for the 8-hour NAAQS?
Section 51.913 What new source review requirements apply for 8-hour ozone nonattainment areas?
Section 51.914 What emissions inventory requirements apply under the 8-hour NAAQS?
Section 51.915 What are the requirements for an Ozone Transport Region under the 8-hour NAAQS?
Section 51.916 What is the effective date of designation for the Las Vegas, NV, 8-hour ozone nonattainment area?
Section 51.917 Can any SIP planning requirements be suspended in 8-hour ozone nonattainment areas that have air quality data that meets
Section 51.918 Applicability
Section 51.919 Mitigation of Exceptional Events
Section 51.930 Definitions
Section 51.1000 Applicability of part 51
Section 51.1001 Submittal of State implementation plan
Section 51.1002 Attainment dates
Section 51.1004 One-year extensions of the attainment date
Section 51.1005 Redesignation to nonattainment following initial designations for the PM2
Section 51.1006 Attainment demonstration and modeling requirements
Section 51.1007 Emission inventory requirements for the PM2
Section 51.1008 Reasonable further progress (RFP) requirements
Section 51.1009 Requirements for reasonably available control technology (RACT) and reasonably available control measures
Section 51.1010 Requirements for mid-course review
Section 51.1011 Requirement for contingency measures
Section 51.1012 Definitions
Section 51.1100 Applicability of part 51
Section 51.1101 Classification and nonattainment area planning provisions
Section 51.1102 Application of classification and attainment date provisions in CAA section 181 to areas subject to Sec
Section 51.1103 Transition from the 1997 ozone NAAQS to the 2008 ozone NAAQS and anti-backsliding
Section 51.1105 Redesignation to nonattainment following initial designations
Section 51.1106 Determining eligibility for 1-year attainment date extensions for the 2008 ozone NAAQS under CAA section 181(a)(5)
Section 51.1107 Modeling and attainment demonstration requirements
Section 51.1108 Requirements for reasonable further progress (RFP)
Section 51.1110 Requirements for reasonably available control technology (RACT) and reasonably available control measures (RACM)
Section 51.1112 Section 182(f) NOX exemption provisions
Section 51.1113 New source review requirements
Section 51.1114 Emissions inventory requirements
Section 51.1115 Requirements for an Ozone Transport Region
Section 51.1116 Fee programs for Severe and Extreme nonattainment areas that fail to attain
Section 51.1117 Suspension of SIP planning requirements in nonattainment areas that have air quality data that meet an ozone NAAQS
Section 51.1118 Applicability
Section 51.1119 Definitions