Section 162.017-1
|
Type |
Section 162.017-2
|
Materials, construction, and workmanship |
Section 162.017-3
|
Inspections and testing |
Section 162.017-4
|
Marking |
Section 162.017-5
|
Procedure for approval |
Section 162.017-6
|
Applicable specifications, and referenced material |
Section 162.018-1
|
Scope |
Section 162.018-2
|
Materials |
Section 162.018-3
|
Construction and workmanship |
Section 162.018-4
|
Blow-down adjustment and popping tolerance |
Section 162.018-5
|
Marking |
Section 162.018-6
|
Flow rating tests |
Section 162.018-7
|
Procedure for approval |
Section 162.018-8
|
Incorporation by reference |
Section 162.027-1
|
Design, construction, testing and marking requirements |
Section 162.027-2
|
Approval procedures |
Section 162.027-3
|
Applicable specifications |
Section 162.028-1
|
Classification |
Section 162.028-2
|
Requirements |
Section 162.028-3
|
Marine type label |
Section 162.028-4
|
Independent laboratories: Listing |
Section 162.028-5
|
Examinations, tests, and inspections |
Section 162.028-6
|
Procedure for listing and labeling |
Section 162.028-7
|
Termination of listing or labeling |
Section 162.028-8
|
Applicable specifications |
Section 162.039-1
|
Classification |
Section 162.039-2
|
Requirements |
Section 162.039-3
|
Marine type label |
Section 162.039-4
|
Recognized laboratory |
Section 162.039-5
|
Examinations, tests, and inspections |
Section 162.039-6
|
Procedure for listing and labeling |
Section 162.039-7
|
Termination of listing or labeling |
Section 162.039-8
|
Scope |
Section 162.050-1
|
Definitions |
Section 162.050-3
|
Incorporation by reference: Where can I get a copy of the publications mentioned in this part? |
Section 162.050-4
|
Contents of application |
Section 162.050-5
|
Approval procedures |
Section 162.050-7
|
Test report |
Section 162.050-9
|
Marking |
Section 162.050-11
|
Factory production and inspection |
Section 162.050-13
|
Designation of facilities |
Section 162.050-15
|
Oil content meter and bilge alarm test rig |
Section 162.050-19
|
Separator and bilge alarm test fluids |
Section 162.050-20
|
Separator: Design specification |
Section 162.050-21
|
Separator: Approval tests |
Section 162.050-23
|
Cargo monitor: Design specification |
Section 162.050-25
|
Oil content meter: Approval tests |
Section 162.050-27
|
Bilge alarm: Design specification |
Section 162.050-33
|
Bilge alarm: Approval tests |
Section 162.050-35
|
Vibration test |
Section 162.050-37
|
Measurement of oil content |
Section 162.050-39
|
Purpose and scope |
Section 162.060-1
|
Definitions |
Section 162.060-3
|
Incorporation by reference |
Section 162.060-5
|
Approval procedures |
Section 162.060-10
|
Use and acceptance of existing test data |
Section 162.060-12
|
Information requirements for the ballast water management system (BWMS) application |
Section 162.060-14
|
Changes to an approved ballast water management system (BWMS) |
Section 162.060-16
|
Suspension, withdrawal, or termination of approval |
Section 162.060-18
|
Design and construction requirements |
Section 162.060-20
|
Marking requirements |
Section 162.060-22
|
Test Plan requirements |
Section 162.060-24
|
Land-based testing requirements |
Section 162.060-26
|
Shipboard testing requirements |
Section 162.060-28
|
Testing requirements for ballast water management system (BWMS) components |
Section 162.060-30
|
Testing and evaluation requirements for active substances, preparations, and relevant chemicals |
Section 162.060-32
|
Test Report requirements |
Section 162.060-34
|
Quality Assurance Project Plan (QAPP) requirements |
Section 162.060-36
|
Operation, Maintenance, and Safety Manual (OMSM) |
Section 162.060-38
|
Requirements for Independent Laboratories (ILs) |
Section 162.060-40
|
Responsibilities for Independent Laboratories (ILs) |
Section 162.060-42
|
Scope |
Section 162.161-1
|
Incorporation by reference |
Section 162.161-2
|
Materials |
Section 162.161-3
|
Construction |
Section 162.161-4
|
Instruction manual for design, installation, operation, and maintenance |
Section 162.161-5
|
Tests for approval |
Section 162.161-6
|
Inspections at production |
Section 162.161-7
|
Marking |
Section 162.161-8
|
Procedure for approval |
Section 162.161-9
|
Scope |