CFR /  Title 30  /  Part 250  /  Sec. 250.451 What must I do in certain situations involving BOP equipment or systems?

The table in this section describes actions that lessees must take when certain situations occur with BOP systems during drilling activities. ------------------------------------------------------------------------

(a) BOP equipment does not hold the Correct the problem and

required pressure during a test, retest the affected

equipment.(b) Need to repair or replace a surface or First place the well in a

subsea BOP system, safe, controlled condition

(e.g., before drilling out

a casing shoe or after

setting a cement plug,

bridge plug, or a packer).(c) Need to postpone a BOP test due to Record the reason for

well-control problems such as lost postponing the test in the

circulation, formation fluid influx, or driller's report and

stuck drill pipe, conduct the required BOP

test on the first trip out

of the hole.(d) BOP control station or pod that does Suspend further drilling

not function properly, operations until that

station or pod is operable.(e) Want to drill with a tapered drill- Install two or more sets of

string, conventional or variable-

bore pipe rams in the BOP

stack to provide for the

following: two sets of rams

must be capable of sealing

around the larger-size

drill string and one set of

pipe rams must be capable

of sealing around the

smaller-size drill string.(f) Install casing rams in a BOP stack, Test the ram bonnets before

running casing.(g) Want to use an annular BOP with a Demonstrate that your well

rated working pressure less than the control procedures or the

anticipated surface pressure, anticipated well conditions

will not place demands

above its rated working

pressure and obtain

approval from the District

Manager.(h) Use a subsea BOP system in an ice- Install the BOP stack in a

scour area, well cellar. The well

cellar must be deep enough

to ensure that the top of

the stack is below the

deepest probable ice-scour

(i) You activate blind-shear rams or Retrieve, physically

casing shear rams during a well control inspect, and conduct a full

situation, in which pipe or casing is pressure test of the BOP

sheared, stack after the situation

is fully controlled.(j) Need to remove the BOP stack Have a minimum of two

barriers in place prior to

BOP removal. The BSEE

District Manager may

require additional

barriers.------------------------------------------------------------------------ [76 FR 64462, Oct. 18, 2011, as amended at 77 FR 50894, Aug. 22, 2012]