CFR /  Title 30  /  Part 250  /  Sec. 250.619 Tubing and wellhead equipment.

The lessee shall comply with the following requirements during well-workover operations with the tree removed:

(a) No tubing string shall be placed in service or continue to be used unless such tubing string has the necessary strength and pressure integrity and is otherwise suitable for its intended use.

(b) In the event of prolonged operations such as milling, fishing, jarring, or washing over that could damage the casing, the casing shall be pressure tested, calipered, or otherwise evaluated every 30 days and the results submitted to the District Manager.

(c) When reinstalling the tree, you must:

(1) Equip wells to monitor for casing pressure according to the following chart: ------------------------------------------------------------------------

(i) fixed platform the wellhead, all annuli (A, B, C, D,

wells, etc., annuli).(ii) subsea wells, the tubing head, the production casing

annulus (A annulus).

(iii) hybrid* wells, the surface wellhead, all annuli at the surface

(A and B riser annuli).

If the production casing

below the mudline and

the production casing

riser above the mudline

are pressure isolated

from each other,

provisions must be made

to monitor the

production casing below

the mudline for casing

pressure.------------------------------------------------------------------------* Characterized as a well drilled with a subsea wellhead and completed

with a surface casing head, a surface tubing head, a surface tubing

hanger, and a surface christmas tree.

(2) Follow the casing pressure management requirements in subpart E of this part.

(d) Wellhead, tree, and related equipment shall have a pressure rating greater than the shut-in tubing pressure and shall be designed, installed, used, maintained, and tested so as to achieve and maintain pressure control. The tree shall be equipped with a minimum of one master valve and one surface safety valve in the vertical run of the tree when it is reinstalled.

(e) Subsurface safety equipment shall be installed, maintained, and tested in compliance with Sec. 250.801 of this part. [76 FR 64462, Oct. 18, 2011. Redesignated at 77 FR 50895, Aug. 22, 2012]