CFR /  Title 30  /  Part 585  /  Sec. 585.610 What must I include in my SAP?

Your SAP must include the following information, as applicable.

(a) For all activities you propose to conduct under your SAP, you must provide the following information: ------------------------------------------------------------------------

(1) Contact information................ The name, address, e-mail

address, and phone number of

an authorized representative.(2) The site assessment or technology A discussion of the objectives;

testing concept. description of the proposed

activities, including the

technology you will use; and

proposed schedule from start

to completion.(3) Designation of operator, if As provided in Sec. 585.405.

applicable.(4) Commercial lease stipulations and A description of the measures

compliance. you took, or will take, to

satisfy the conditions of any

lease stipulations related to

your proposed activities.(5) A location plat.................... The surface location and water

depth for all proposed and

existing structures,

facilities, and appurtenances

located both offshore and

onshore.(6) General structural and project Information for each type of

design, fabrication, and installation. facility associated with your

project.(7) Deployment activities.............. A description of the safety,

prevention, and environmental

protection features or

measures that you will use.(8) Your proposed measures for A description of the measures

avoiding, minimizing, reducing, you will use to avoid or

eliminating, and monitoring minimize adverse effects and

environmental impacts. any potential incidental take,

before you conduct activities

on your lease, and how you

will mitigate environmental

impacts from your proposed

activities, including a

description of the measures

you will use as required by

subpart H of this part.(9) CVA nomination, if required........ CVA nominations for reports in

subpart G of this part, as

required by Sec. 585.706, or

a request to waive the CVA

requirement, as required by

Sec. 585.705(c).(10) Reference information............. A list of any document or

published source that you cite

as part of your plan. You may

reference information and data

discussed in other plans you

previously submitted or that

are otherwise readily

available to BOEM.(11) Decommissioning and site clearance A discussion of methodologies.

procedures.(12) Air quality information........... Information as described in

Sec. 585.659 of this

section.

(13) A listing of all Federal, State, A statement indicating whether

and local authorizations or approvals such authorization or approval

required to conduct site assessment has been applied for or

activities on your lease. obtained.(14) A list of agencies and persons Contact information and issues

with whom you have communicated, or discussed.

with whom you will communicate,

regarding potential impacts associated

with your proposed activities.(15) Financial assurance information... Statements attesting that the

activities and facilities

proposed in your SAP are or

will be covered by an

appropriate bond or other

approved security, as required

in Sec. Sec. 585.515 and

585.516.(16) Other information................. Additional information as

requested by BOEM.------------------------------------------------------------------------

(b) You must provide the results of geophysical and geological surveys, hazards surveys, archaeological surveys (if required), and baseline collection studies (e.g., biological) with the supporting data in your SAP: ------------------------------------------------------------------------

(1) Geotechnical............ The results from the A description of all

geotechnical survey relevant seabed and

with supporting engineering data

data. and information to

allow for the

design of the

foundation for that

facility. You must

provide data and

information to

depths below which

the underlying

conditions will not

influence the

integrity or

performance of the

structure. This

could include a

series of sampling

locations (borings

and in situ tests)

as well as

laboratory testing

of soil samples,

but may consist of

a minimum of one

deep boring with

samples.(2) Shallow hazards......... The results from the A description of

shallow hazards information

survey with sufficient to

supporting data. determine the

presence of the

following features

and their likely

effects on your

proposed facility,

including:

(i) Shallow

faults;

(ii) Gas seeps or

shallow gas;

(iii) Slump

blocks or slump

sediments;

(iv) Hydrates;

and

(v) Ice scour of

seabed

sediments.(3) Archaeological resources The results from the (i) A description

archaeological of the results

survey with and data from

supporting data, if the

required. archaeological

survey;

(ii) A

description of

the historic and

prehistoric

archaeological

resources, as

required by the

National

Historic

Preservation Act

(NHPA) of 1966,

as amended.(4) Geological survey....... The results from the A report that

geological survey describes the

with supporting results of a

data. geological survey

that includes

descriptions of:

(i) Seismic

activity at your

proposed site;

(ii) Fault zones;

(iii) The

possibility and

effects of

seabed

subsidence; and

(iv) The extent

and geometry of

faulting

attenuation

effects of

geologic

conditions near

your site.(5) Biological survey....... The results from the A description of the

biological survey results of a

with supporting biological survey,

data. including

descriptions of the

presence of live

bottoms; hard

bottoms;

topographic

features; and

surveys of other

marine resources

such as fish

populations

(including

migratory

populations),

marine mammals, sea

turtles, and sea

birds.------------------------------------------------------------------------

(c) If you submit your COP or FERC license application with your SAP then:

(1) You must provide sufficient data and information with your COP or FERC license application for BOEM and/or FERC to complete the needed reviews and NEPA analysis.

(2) You may need to revise your COP or FERC license application and BOEM and/or FERC may need to conduct additional reviews, including NEPA analysis, if new information becomes available after you complete your site assessment activities.