CFR /  Title 33  /  Part 208  /  Sec. 208.11 Regulations for use of storage allocated for flood subject to prescription of rules and regulations by the Secretary of the Army in the interest of flood control and navigation.

(a) Purpose. This regulation prescribes the responsibilities and general procedures for regulating reservoir projects capable of regulation for flood control or navigation and the use of storage allocated for such purposes and provided on the basis of flood control and navigation, except projects owned and operated by the Corps of Engineers; the International Boundary and Water Commission, United States and Mexico; and those under the jurisdiction of the International Joint Commission, United States, and Canada, and the Columbia River Treaty. The intent of this regulation is to establish an understanding between project owners, operating agencies, and the Corps of Engineers.

(b) Responsibilities. The basic responsibilities of the Corps of Engineers regarding project operation are set out in the cited authority and described in the following paragraphs:

(1) Section 7 of the Flood Control Act of 1944 (58 Stat. 890, 33 U.S.C. 709) directs the Secretary of the Army to prescribe regulations for flood control and navigation in the following manner:

Hereafter, it shall be the duty of the Secretary of War to prescribe regulations for the use of storage allocated for flood control or navigation at all reservoirs constructed wholly or in part with Federal funds provided on the basis of such purposes, and the operation of any such project shall be in accordance with such regulations: Provided, That this section shall not apply to the Tennessee Valley Authority, except that in case of danger from floods on the lower Ohio and Mississippi Rivers the Tennessee Valley Authority is directed to regulate the release of water from the Tennessee River into the Ohio River in accordance with such instructions as may be issued by the War Department.

(2) Section 9 of Public Law 436-83d Congress (68 Stat. 303) provides for the development of the Coosa River, Alabama and Georgia, and directs the Secretary of the Army to prescribe rules and regulations for project operation in the interest of flood control and navigation as follows:

The operation and maintenance of the dams shall be subject to reasonable rules and regulations of the Secretary of the Army in the interest of flood control and navigation.

Note: This Regulation will also be applicable to dam and reservoir projects operated under provisions of future legislative acts wherein the Secretary of the Army is directed to prescribe rules and regulations in the interest of flood control and navigation. The Chief of Engineers, U.S. Army Corps of Engineers, is designated the duly authorized representative of the Secretary of the Army to exercise the authority set out in the Congressional Acts. This Regulation will normally be implemented by letters of understanding between the Corps of Engineers and project owner and will incorporate the provisions of such letters of understanding prior to the time construction renders the project capable of significant impoundment of water. A water control agreement signed by both parties will follow when deliberate impoundment first begins or at such time as the responsibilities of any Corps-owned projects may be transferred to another entity. Promulgation of this Regulation for a given project will occur at such time as the name of the project appears in the Federal Register in accordance with the requirements of paragraph 6k. When agreement on a water control plan cannot be reached between the Corps and the project owner after coordination with all interested parties, the project name will be entered in the Federal Register and the Corps of Engineers plan will be the official water control plan until such time as differences can be resolved.

(3) Federal Energy Regulatory Commission (FERC), formerly Federal Power Commission (FPC), Licenses.

(i) Responsibilities of the Secretary of the Army and/or the Chief of Engineers in FERC licensing actions are set forth in reference 3c above and pertinent sections are cited herein. The Commission may further stipulate as a licensing condition, that a licensee enter into an agreement with the Department of the Army providing for operation of the project during flood times, in accordance with rules and regulations prescribed by the Secretary of the Army.

(A) Section 4(e) of the Federal Power Act requires approval by the Chief of Engineers and the Secretary of the Army of plans of dams or other structures affecting the navigable capacity of any navigable waters of the United States, prior to issuance of a license by the Commission as follows:

The Commission is hereby authorized and empowered to issue licenses to citizens * * * for the purpose of constructing, operating and maintaining dams, water conduits, reservoirs, powerhouses, transmission lines, or other project works necessary or convenient for the development and improvement of navigation and for the development, transmission, and utilization of power across, along, from or in any of the streams or other bodies of water over which Congress has jurisdiction * * * Provided further, That no license affecting the navigable capacity of any navigable waters of the United States shall be issued until the plans of the dam or other structures affecting navigation have been approved by the Chief of Engineers and the Secretary of the Army.

(B) Sections 10(a) and 10(c) of the Federal Power Act specify conditions of project licenses including the following:

(1) Section 10(a). ``That the project adopted * * * shall be such as in the judgment of the Commission will be best adapted to a comprehensive plan for improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, for the improvement and utilization of waterpower development, and for other beneficial public uses * * *.''

(2) Section 10(c). ``That the licensee shall * * * so maintain and operate said works as not to impair navigation, and shall conform to such rules and regulations as the Commission may from time to time prescribe for the protection of life, health, and property * * *.''

(C) Section 18 of the Federal Power Act directs the operation of any navigation facilities built under the provision of that Act, be controlled by rules and regulations prescribed by the Secretary of the Army as follows:

The operation of any navigation facilities which may be constructed as part of or in connection with any dam or diversion structure built under the provisions of this Act, whether at the expense of a licensee hereunder or of the United States, shall at all times be controlled by such reasonable rules and regulations in the interest of navigation; including the control of the pool caused by such dam or diversion structure as may be made from time to time by the Secretary of the Army, * * *.

(ii) Federal Power Commission Order No. 540 issued October 31, 1975, and published November 7, 1975 (40 FR 51998), amending Sec. 2.9 of the Commission's General Policy and Interpretations prescribed Standardized Conditions (Forms) for Inclusion in Preliminary Permits and Licenses Issued Under part I of the Federal Power Act. As an example, Article 12 of Standard Form L-3, titled: ``Terms and Conditions of License for Constructed Major Projects Affecting Navigable Waters of the United States,'' sets forth the Commission's interpretation of appropriate sections of the Act, which deal with navigation aspects, and attendant responsibilities of the Secretary of the Army in licensing actions as follows:

The United States specifically retains and safeguards the right to use water in such amount, to be determined by the Secretary of the Army, as may be necessary for the purposes of navigation on the navigable waterway affected; and the operations of the Licensee, so far as they affect the use, storage and discharge from storage of waters affected by the license, shall at all times be controlled by such reasonable rules and regulations as the Secretary of the Army may prescribe in the interest of navigation, and as the Commission may prescribe for the protection of life, health, and property, * * * and the Licensee shall release water from the project reservoir at such rate * * * as the Secretary of the Army may prescribe in the interest of navigation, or as the Commission may prescribe for the other purposes hereinbefore mentioned.

(c) Scope and terminology. This regulation applies to Federal authorized flood control and/or navigation storage projects, and to non-Federal projects which require the Secretary of the Army to prescribe regulations as a condition of the license, permit or legislation, during the planning, design and construction phases, and throughout the life of the project. In compliance with the authority cited above, this regulation defines certain activities and responsibilities concerning water control management throughout the Nation in the interest of flood control and navigation. In carrying out the conditions of this regulation, the owner and/or operating agency will comply with applicable provisions of Pub. L. 85-624, the Fish and Wildlife Coordination Act of 1958, and Pub. L. 92-500, the Federal Water Pollution Control Act Amendments of 1972. This regulation does not apply to local flood protection works governed by Sec. 208.10, or to navigation facilities and associated structures which are otherwise covered by part 207 (Navigation Regulations) of title 33 of the code. Small reservoirs, containing less than 12,500 acre-feet of flood control or navigation storage, may be excluded from this regulation and covered under Sec. 208.10, unless specifically required by law or conditions of the license or permit.

(1) The terms reservoir and project as used herein include all water resource impoundment projects constructed or modified, including natural lakes, that are subject to this regulation.

(2) The term project owner refers to the entity responsible for maintenance, physical operation, and safety of the project, and for carrying out the water control plan in the interest of flood control and/or navigation as prescribed by the Corps of Engineers. Special arrangements may be made by the project owner for ``operating agencies'' to perform these tasks.

(3) The term letter of understanding as used herein includes statements which consummate this regulation for any given project and define the general provisions or conditions of the local sponsor, or owner, cooperation agreed to in the authorizing legislative document, and the requirements for compliance with section 7 of the 1944 Flood Control Act, the Federal Power Act or other special congressional act. This information will be specified in the water control plan and manual. The letter of understanding will be signed by a duly authorized representative of the Chief of Engineers and the project owner. A ``field working agreement'' may be substituted for a letter of understanding, provided that the specified minimum requirements of the latter, as stated above, are met.

(4) The term water control agreement refers to a compliation of water control criteria, guidelines, diagrams, release schedules, rule curves and specifications that basically govern the use of reservoir storage space allocated for flood control or navigation and/or release functions of a water control project for these purposes. In general, they indicate controlling or limiting rates of discharge and storage space required for flood control and/or navigation, based on the runoff potential during various seasons of the year.

(5) For the purpose of this regulation, the term water control plan is limited to the plan of regulation for a water resources project in the interest of flood control and/or navigation. The water control plan must conform with proposed allocations of storage capacity and downstream conditions or other requirements to meet all functional objectives of the particular project, acting separately or in combination with other projects in a system.

(6) The term real-time denotes the processing of current information or data in a sufficiently timely manner to influence a physicial response in the system being monitored and controlled. As used herein the term connotes * * * the analyses for and execution of water control decisions for both minor and major flood events and for navigation, based on prevailing hydrometeorological and other conditions and constraints, to achieve efficient management of water resource systems.

(d) Procedures--(1) Conditions during project formulation. During the planning and design phases, the project owner should consult with the Corps of Engineers regarding the quantity and value of space to reserve in the reservoir for flood control and/or navigation purposes, and for utilization of the space, and other requirements of the license, permit or conditions of the law. Relevant matters that bear upon flood control and navigation accomplishment include: Runoff potential, reservoir discharge capability, downstream channel characteristics, hydrometeorological data collection, flood hazard, flood damage characteristics, real estate acquisition for flowage requirements (fee and easement), and resources required to carry out the water control plan. Advice may also be sought on determination of and regulation for the probable maximum or other design flood under consideration by the project owner to establish the quantity of surcharge storage space, and freeboard elevation of top of dam or embankment for safety of the project.

(1) Conditions during project formulation. During the planning and design phases, the project owner should consult with the Corps of Engineers regarding the quantity and value of space to reserve in the reservoir for flood control and/or navigation purposes, and for utilization of the space, and other requirements of the license, permit or conditions of the law. Relevant matters that bear upon flood control and navigation accomplishment include: Runoff potential, reservoir discharge capability, downstream channel characteristics, hydrometeorological data collection, flood hazard, flood damage characteristics, real estate acquisition for flowage requirements (fee and easement), and resources required to carry out the water control plan. Advice may also be sought on determination of and regulation for the probable maximum or other design flood under consideration by the project owner to establish the quantity of surcharge storage space, and freeboard elevation of top of dam or embankment for safety of the project.

(2) Corps of Engineers involvement. If the project owner is responsible for real-time implemenetation of the water control plan, consultation and assistance will be provided by the Corps of Engineers when appropriate and to the extent possible. During any emergency that affects flood control and/or navigation, the Corps of Engineers may temporarily prescribe regulation of flood control or navigation storage space on a day-to-day (real-time) basis without request of the project owner. Appropriate consideration will be given for other authorized project functions. Upon refusal of the project owner to comply with regulations prescribed by the Corps of Engineers, a letter will be sent to the project owner by the Chief of Engineers or his duly authorized representative describing the reason for the regulations prescribed, events that have transpired, and notification that the project owner is in violation of the Code of Federal Regulations. Should an impasse arise, in that the project owner or the designated operating entity persists in noncompliance with regulations prescribed by the Corps of Engineers, measures may be taken to assure compliance.

(3) Corps of Engineers implementation of real-time water control decisions. The Corps of Engineers may prescribe the continuing regulation of flood control storage space for any project subject to this regulation on a day-to-day (real-time) basis. When this is the case, consultation and assistance from the project owner to the extent possible will be expected. Special requests by the project owner, or appropriate operating entity, are preferred before the Corps of Engineers offers advice on real-time regulation during surcharge storage utilization.

(4) Water control plan and manual. Prior to project completion, water control managers from the Corps of Engineers will visit the project and the area served by the project to become familiar with the water control facilities, and to insure sound formulation of the water control plan. The formal plan of regulation for flood control and/or navigation, referred to herein as the water control plan, will be developed and documented in a water control manual prepared by the Corps of Engineers. Development of the manual will be coordinated with the project owner to obtain the necessary pertinent information, and to insure compatibility with other project purposes and with surcharge regulation. Major topics in the manual will include: Authorization and description of the project, hydrometeorology, data collection and communication networks, hydrologic forecasting, the water control plan, and water resource management functions, including responsibilities and coordination for water control decisionmaking. Special instructions to the dam tender or reservoir manager on data collection, reporting to higher Federal authority, and on procedures to be followed in the event of a communication outage under emergency conditions, will be prepared as an exhibit in the manual. Other exhibits will include copies of this regulation, letters of understanding consummating this regulation, and the water control agreements. After approval by the Chief of Engineers or his duly authorized representative, the manual will be furnished the project owner.

(5) Water control agreement. (i) A water control diagram (graphical) will be prepared by the Corps of Engineers for each project having variable space reservation for flood control and/or navigation during the year; e.g., variable seasonal storage, joint-use space, or other rule curve designation. Reservoir inflow parameters will be included on the diagrams when appropriate. Concise notes will be included on the diagrams prescribing the use of storage space in terms of release schedules, runoff, nondamaging or other controlling flow rates downstream of the damsite, and other major factors as appropriate. A water control release schedule will be prepared in tabular form for projects that do not have variable space reservation for flood control and/or navigation. The water control diagram or release schedule will be signed by a duly authorized representative of the Chief of Engineers, the project owner, and the designated operating agency, and will be used as the basis for carrying out this regulation. Each diagram or schedule will contain a reference to this regulation.

(i) A water control diagram (graphical) will be prepared by the Corps of Engineers for each project having variable space reservation for flood control and/or navigation during the year; e.g., variable seasonal storage, joint-use space, or other rule curve designation. Reservoir inflow parameters will be included on the diagrams when appropriate. Concise notes will be included on the diagrams prescribing the use of storage space in terms of release schedules, runoff, nondamaging or other controlling flow rates downstream of the damsite, and other major factors as appropriate. A water control release schedule will be prepared in tabular form for projects that do not have variable space reservation for flood control and/or navigation. The water control diagram or release schedule will be signed by a duly authorized representative of the Chief of Engineers, the project owner, and the designated operating agency, and will be used as the basis for carrying out this regulation. Each diagram or schedule will contain a reference to this regulation.

(ii) When deemed necessary by the Corps of Engineers, information given on the water control diagram or release schedule will be supplemented by appropriate text to assure mutual understanding on certain details or other important aspects of the water control plan not covered in this regulation, on the water control diagram or in the release schedule. This material will include clarification of any aspects that might otherwise result in unsatisfactory project performance in the interest of flood contol and/or navigation. Supplementation of the agreement will be necessary for each project where the Corps of Engineers exercises the discretionary authority to prescribe the flood control regulation on a day-to-day (real-time) basis. The agreement will include delegation of the responsibility. The document should also cite, as appropriate, section 7 of the 1944 Flood Control Act, the Federal Power Act and/or other congressional legislation authorizing construction an/or directing operation of the project.

(iii) All flood control regulations published in the Federal Register under this section (part 208) of the code prior to the date of this publication which are listed in Sec. 208.11(e) are hereby superseded.

(iv) Nothing in this regulation prohibits the promulgation of specific regulations for a project in compliance with the authorizing acts, when agreement on acceptable regulations cannot be reached between the Corps of Engineers and the owner.

(6) Hydrometeorological instrumentation. The project owner will provide instrumentation in the vicinity of the damsite and will provide communication equipment necessary to record and transmit hydrometeorological and reservoir data to all appropriate Federal authorities on a real-time basis unless there are extenuating circumstances or are otherwise provided for as a condition of the license or permit. For those projects where the owner retains responsibility for real-time implementation of the water control plan, the owner will also provide or arrange for the measurement and reporting of hydrometeorological parameters required within and adjacent to the watershed and downstream of the damsite, sufficient to regulate the project for flood control and/or navigation in an efficient manner. When data collection stations outside the immediate vicinity of the damsite are required, and funds for installation, observation, and maintenance are not available from other sources, the Corps of Engineers may agree to share the costs for such stations with the project owner. Availability of funds and urgency of data needs are factors which will be considered in reaching decisions on cost sharing.

(7) Project safety. The project owner is responsible for the safety of the dam and appurtenant facilities and for regulation of the project during surcharge storage utilization. Emphasis upon the safety of the dam is especially important in the event surcharge storage is utilized, which results when the total storage space reserved for flood control is exceeded. Any assistance provided by the Corps of Engineers concerning surcharge regulation is to be utilized at the discretion of the project owner, and does not relieve the owner of the responsibility for safety of the project.

(8) Notification of the general public. The Corps of Engineers and other interested Federal and State agencies, and the project owner will jointly sponsor public involvement activities, as appropriate, to fully apprise the general public of the water control plan. Public meetings or other effective means of notification and involvement will be held, with the initial meeting being conducted as early as practicable but not later than the time the project first becomes operational. Notice of the initial public meeting shall be published once a week for 3 consecutive weeks in one or more newspapers of general circulation published in each county covered by the water control plan. Such notice shall also be used when appropriate to inform the public of modifications in the water control plan. If no newspaper is published in a county, the notice shall be published in one or more newspapers of general circulation within that county. For the purposes of this section a newspaper is one qualified to publish public notices under applicable State law. Notice shall be given in the event significant problems are anticipated or experienced that will prevent carrying out the approved water control plan or in the event that an extreme water condition is expected that could produce severe damage to property or loss of life. The means for conveying this information shall be commensurate with the urgency of the situation. The water control manual will be made available for examination by the general public upon request at the appropriate office of the Corps of Engineers, project owner or designated operating agency.

(9) Other generalized requirements for flood control and navigation. (i) Storage space in the reservoirs allocated for flood control and navigation purposes shall be kept available for those purposes in accordance with the water control agreement, and the plan of regulation in the water control manual.

(i) Storage space in the reservoirs allocated for flood control and navigation purposes shall be kept available for those purposes in accordance with the water control agreement, and the plan of regulation in the water control manual.

(ii) Any water impounded in the flood control space defined by the water control agreement shall be evacuated as rapidly as can be safely accomplished without causing downstream flows to exceed the controlling rates; i.e., releases from reservoirs shall be restricted insofar as practicable to quantities which, in conjunction with uncontrolled runoff downstream of the dam, will not cause water levels to exceed the controlling stages currently in force. Although conflicts may arise with other purposes, such as hydropower, the plan or regulation may require releases to be completely curtailed in the interest of flood control or safety of the project.

(iii) Nothing in the plan of regulation for flood control shall be construed to require or allow dangerously rapid changes in magnitudes of releases. Releases will be made in a manner consistent with requirements for protecting the dam and reservoir from major damage during passage of the maximum design flood for the project.

(iv) The project owner shall monitor current reservoir and hydro- meteorological conditions in and adjacent to the watershed and downstream of the damsite, as necessary. This and any other pertinent information shall be reported to the Corps of Engineers on a timely basis, in accordance with standing instructions to the damtender or other means requested by the Corps of Engineers.

(v) In all cases where the project owner retains responsibility for real-time implementation of the water control plan, he shall make current determinations of: Reservoir inflow, flood control storage utilized, and scheduled releases. He shall also determine storage space and releases required to comply with the water control plan prescribed by the Corps of Engineers. The owner shall report this information on a timely basis as requested by the Corps of Engineers.

(vi) The water control plan is subject to temporary modification by the Corps of Engineers if found necessary in time of emergency. Requests for and action on such modifications may be made by the fastest means of communication available. The action taken shall be confirmed in writing the same day to the project owner and shall include justification for the action.

(vii) The project owner may temporarily deviate from the water control plan in the event an immediate short-term departure is deemed necessary for emergency reasons to protect the safety of the dam, or to avoid other serious hazards. Such actions shall be immediately reported by the fastest means of communication available. Actions shall be confirmed in writing the same day to the Corps of Engineers and shall include justification for the action. Continuation of the deviation will require the express approval of the Chief of Engineers, or his duly authorized representative.

(viii) Advance approval of the Chief of Engineers, or his duly authorized representative, is required prior to any deviation from the plan of regulation prescribed or approved by the Corps of Engineers in the interest of flood control and/or navigation, except in emergency situations provided for in paragraph (d)(9)(vii) of this section. When conditions appear to warrant a prolonged deviation from the approved plan, the project owner and the Corps of Engineers will jointly investigate and evaluate the proposed deviation to insure that the overall integrity of the plan would not be unduly compromised. Approval of prolonged deviations will not be granted unless such investigations and evaluations have been conducted to the extent deemed necessary by the Chief of Engineers, or his designated representatives, to fully substantiate the deviation.

(10) Revisions. The water control plan and all associated documents will be revised by the Corps of Engineers as necessary, to reflect changed conditions that come to bear upon flood control and navigation, e.g., reallocation of reservoir storage space due to sedimentation or transfer of storage space to a neighboring project. Revision of the water control plan, water control agreement, water control diagram, or release schedule requires approval of the Chief of Engineers or his duly authorized representative. Each such revision shall be effective upon the date specified in the approval. The original (signed document) water control agreement shall be kept on file in the respective Office the Division Engineer, Corps of Engineers, Department of the Army, located at division offices throughout the continental USA. Copies of these agreements may be obtained from the office of the project owner, or from the office of the appropriate Division Engineer, Corps of Engineers.

(11) Federal Register. The following information for each project subject to section 7 of the 1944 Flood Control Act and other applicable congressional acts shall be published in the Federal Register prior to the time the projects becomes operational and prior to any significant impoundment before project completion or * * * at such time as the responsibility for physical operation and maintenance of the Corps of Engineers owned projects is transferred to another entity:

(i) Reservoir, dam, and lake names,

(ii) Stream, county, and State corresponding to the damsite location,

(iii) The maximum current storage space in acre-feet to be reserved exclusively for flood control and/or navigation purposes, or any multiple-use space (intermingled) when flood control or navigation is one of the purposes, with corresponding elevations in feet above mean sea level, and area in acres, at the upper and lower limits of said space,

(iv) The name of the project owner, and

(v) Congressional legislation authorizing the project for Federal participation.

(e) List of projects. The following tables, ``Pertinent Project Data--Section 208.11 Regulation,'' show the pertinent data for projects which are subject to this regulation.

List of Projects

[Non-Corps projects with Corps Regulation Requirements]------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Elev limits feet Area in acres

Storage M.S.L. ------------------

Project name \1\ (1) State County (3) Stream \1\ (4) Project purpose \2\ 1000 AF -------------------- Authorizing legis. Proj. owner \4\

(2) (5) (6) Upper Lower Upper Lower \3\ (11) (12)

(7) (8) (9) (10)------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------Agency Valley Dam & Res......... OR Malheur............ N Fork Malheur R... FICR............... 60.0 3340.0 3263.0 1900 0 PL 68-292.......... USBR.Alpine Dam...................... IL Winnebago.......... Keith Cr........... F.................. 0.6 796.0 760.0 52 0 PWA Proj........... Rkfd, IL.Altus Dam & Res................. OK Jackson............ N Fork Red R....... F.................. 19.6 1562.0 1559.0 6800 6260 PL 761............. USBR.

IMR................ 132.6 1559.0 1517.5P 6260 735Anderson Ranch Dam & Res........ ID Elmore............. S Fk Boise R....... FEI................ 423.2 4196.0 4039.6 4740 1150 Act of 1939 53 Stat USBR.

1187.Arbuckle Dam & Res.............. OK Murray............. Rock Cr............ F.................. 36.4 885.3 872.0 3130 2350 PL 594............. USBR.

MRC................ 62.5 872.0 827.0 2350 606Arrowrock Dam & Res............. ID Elmore............. Boise R............ FI................. 286.6 3216.0 2974.0 3100 200 Act of 1902 32 Stat USBR.

388.Bear Cr Dam..................... MO Marion Ralls....... Bear Cr............ F.................. 8.7 546.5 520.0 540 0 PL 83-780.......... Hnbl, MO.Bear Swamp Fife Brook (Lo)...... MA Franklin........... Deerfield R........ E.................. 6.9 870.0 830.0 152 115 FERC 2669.......... NEPC.Bear Swamp PS (Upper)........... MA Franklin........... Deerfield R Trib... E.................. 8.9 1600.0 1550.0 118 102 Fed Pwr Act........ NEPC.Bellows Falls Dam & Lk.......... VT Cheshire........... Connecticut R...... E.................. 7.5 291.6 273.6 2804 836 FERC 1885.......... NEPC.Big Dry Creek and Div........... CA Fresno............. Big Dry Cr & Dog Cr F.................. 16.2 425.0 393.0 1530 0 PL 77-228.......... Rclm, B CA.Blue Mesa Dam & Res............. CO Gunnison........... Gunnison R......... FER................ 748.5 7519.4 7393.0 9180 2790 PL 84-485.......... USBRBoca Dam & Res.................. CA Nevada............. Little Truckee R... I.................. 32.8 5596.5 5521.0 873 52 PL 61-289.......... USBR.

FI................. 8.0 5605.0 5596.0 980 873 PL 68-292..........Bonny Dam & Res................. CO Yuma............... S Fork Republic R.. F.................. 128.2 3710.0 3672.0 5036 2042 PL 78-534.......... USBR.

ICR................ 39.2 3672.0 3638.0 2042 331 PL 79-732..........Boysen Dam & Res................ WY Fremont............ Wild R............. F.................. 150.4 4732.2 4725.0 22170 19560 PL 78-534.......... USBR.

FEIQ............... 146.1 4725.0 4717.0 19560 16960

EIQ................ 403.8 4717.0 4685.0 16960 9280Brantley Dam & Res.............. NM Eddy............... Pecos R............ FIRQ............... 348.5 3283.0 3210.7 21294 38 PL 92-515.......... USBR.Brownlee Dam & Res.............. OR Baker.............. Snake R............ FE................. 975.3 2077.0 1976.0 13840 6650 FERC No 1971-C..... ID Pwr.

ID Washington.........Bully Cr Dam & Res.............. OR Malheur............ Bully Cr........... FI................. 31.6 2516.0 2456.8 1082 140 PL 86-248.......... USBR.Camanche Dam & Res.............. CA San Joaquin........ Mokelumne R........ FRIE............... 200.0 235.5 205.1 7600 5507 PL 86-645.......... EB-MUD.

RIE................ 230.9 205.1 92.0 5507 0Canyon Ferry Dam & Lk........... MT Lewis Clark........ Missouri R......... F.................. 99.5 3800.0 3797.0 33535 32800 PL 78-534.......... USBR.

FEI................ 795.1 3797.0 3770.0 32800 24125

EI................. 711.5 3770.0 3728.0 24125 11480Cedar Bluff Dam & Res........... KS Trego.............. Smoky Hill R....... F.................. 191.9 2166.0 2144.0 10790 6869 PL 78-534.......... USBR.

IMCR............... 149.8 2144.0 2107.8 6869 2086Cheney Dam & Res................ KS Sedgwick........... N Fork Ninnescah R. F.................. 80.9 1429.9 1421.6 12420 9540 PL 86-787.......... USBR.

MC................. 151.8 1421.6 1392.9 9540 1970

0.0 0.0 0.0 0 0

Clark Canyon Dam & Res.......... MT Beaverhead......... Beaverhead R....... F.................. 79.1 5560.4 5546.1 5900 5160 PL 78-534.......... USBR.

FI................. 50.4 5546.1 5535.7 5160 4495

I.................. 126.1 5535.7 5470.6 4495 220Del Valle Dam & Res............. CA Alameda............ Alameda Cr......... F.................. 37.0 745.0 703.1 1060 710 PL 87-874.......... DWR.

FIM................ 1.0 703.1 702.2 710 700 CA.

IMR................ 29.0 702.2 635.0 700 275Don Pedro Dam & Lk.............. CA Tuolumne........... Tuolumne R......... FIER............... 340.0 830.0 802.0 12900 11260 PL 78-534.......... M&T.;

EIR................ 1381.0 802.0 600.0 11260 3520 Irr.

308.0 600.0 342.0 3520 29East Canyon Dam & Res........... UT Morgan............. East Canyon Cr..... FEIM............... 48.0 5705.5 5578.0 684 130 PL 81-273.......... USBR.Echo Dam & Res.................. UT Summit............. Weber R............ FEIM............... 74.0 5560.0 5450.0 1455 0 PL 81-83........... USBR.Emigrant Dam & Res.............. OR Jackson............ Emigrant Cr........ FIR................ 39.0 2241.0 2131.5 801 80 PL 83-606.......... USBR.Enders Dam & Res................ NE Chase.............. Frenchman Cr....... F.................. 30.0 3127.0 3112.3 2405 1707 PL 78-534.......... USBR.

ICR................ 34.5 3112.3 3082.4 1707 658 PL 84-505..........Folsom Dam & Lk................. CA Sacramento......... American R......... FEIM............... 400.0 466.0 427.0 11450 9040 ................... USBR.

EIM................ 610.0 427.0 210.0 9040 0Fort Cobb Dam & Res............. OK Caddo.............. Pond (Cobb) Cr..... F.................. 63.7 1354.8 1342.0 5980 4100 PL 419............. USBR.

IMCR............... 78.3 1342.0 1300.0 4100 337Foss Dam & Res.................. OK Custer............. Washita R.......... F.................. 180.6 1668.6 1652.0 13140 8800 PL 419............. USBR.

IMRC............... 243.8 1652.0 1597.2 8800 1360Friant Dam & Millerton Lk....... CA Fresno............. San Joaquin R...... FEIM............... 390.5 578.0 466.3 4850 2101 PL 75-392.......... USBR.

PL 76-868..........Galesville Dam.................. OR Douglas............ Cow Cr............. FEMCR.............. 42.2 1881.5 1780.0 760 150 FERC No. 71........ Dgls, CO.

61001..............Gaston Dam & Res................ NC Halifax............ Roanoke R.......... FE................. 63.0 203.0 200.0 22500 20300 Fed Pwr Act........ VA Pwr.

Northampton........Glen Elder Dam & Waconda Lk..... KS Mitchel............ Solomon R.......... F.................. 722.3 1488.3 1455.6 33682 12602 PL 78-534.......... USBR.

IM................. 204.8 1455.6 1428.0 12602 3341 PL 79-526..........Glendo Dam & Res................ WY Platte............. N Platte R......... F.................. 271.9 4653.0 4635.0 17990 12370 PL 78-534.......... USBR.

EIM................ 454.3 4635.0 4570.0 12370 3130Grand Coulee Dam & FDR Lk....... WA Okanogan Grant..... Columbia R......... FEI................ 5185.5 1290.0 1208.0 82280 45592 PL 89-561.......... USBR.H Neely Henry Dam & Res......... AL Calhoun St. Clair.. Coosa R............ FE................. 49.7 508.0 502.5 11235 7632 PL 83-436.......... AL Pwr.Harris Dam & Res................ AL Randolph........... Tallapoosa R....... FE................. 215.0 793.0 785.0 10661 9012 PL 89-789.......... AL Pwr.Heart Butte Dm & Lk Tschida..... ND Grant.............. Heart R............ F.................. 147.9 2094.5 2064.5 6580 3400 PL 78-534.......... USBR.

IQ................. 69.0 2064.5 2030.0 3400 810Hells Canyon Dam & Res.......... OR Wallowa............ Snake R............ EN................. 11.7 1688.0 1683.0 2380 2280 FERC No 1971-A..... ID Pwr.

ID Adams..............Hoover Dam & Lk Mead............ NV Clark Mohave....... Colorado R......... F.................. 1500.0 1229.0 1219.6 162700 156500 PL 70-642.......... USBR.

AZ FEIMCAR............ 15.8 1219.6 1083.0 156500 83500Hungry Horse Dam & Res.......... MT Flathead........... S Fork Flathead R.. FEI................ 2982.0 3560.0 3336.0 23800 5400 PL 78-329.......... USBR.Indian Valley Dam & Res......... CA Lake............... N Fork Cache Cr.... FIMR............... 40.0 1485.0 1474.0 3975 3734 PL 84-984.......... Yolo FC&W.;

IMR................ 260.0 1474.0 1334.0 3734 308Jamestown Dam & Res............. ND Stutsman........... James R............ F.................. 185.4 1454.0 1429.8 13210 2090 PL 78-534.......... USBR.

IQ................. 28.1 1429.8 1400.0 2090 160Jocassee Dam & Res.............. SC Pickens............ Keowee R........... PRFC............... 1160.0 1110.0 1080.0 7565 6815 FERC 2503.......... USBR Pwr.Keowee Dam & Lk................. SC Pickens............ Keowee R........... FPMCAR............. 392.0 800.0 775.0 18372 13072 FERC 2503.......... Duke Pwr.Kerr Dam Flathead Lk............ MT Lake............... Flathead R......... FER................ 1219.0 2893.0 2883.0 125560 120000 FERC No 5.......... MT Pwr.

Kerr Dam & Lk Hudson (Markham OK Mayes.............. Grand Neosho R..... F.................. 244.2 636.0 619.0 18800 10900 PL 76-476.......... GRD Auth.

Ferry Project). E.................. 48.6 619.0 599.0 10900 4500Keyhole Dam & Res............... WY Crook.............. Belle Fourche R.... F.................. 140.5 4111.5 4099.3 13730 9410 PL 78-534.......... USBR.

IQ................. 185.8 4099.3 4051.0 9410 820Kirwin Dam & Res................ KS Phillips........... N Fork Solomon R... F.................. 215.1 1757.3 1729.3 10640 5080 PL 78-534.......... USBR.

ICR................ 89.6 1729.2 1697.0 5080 1010 PL 79-732; PL 79-

526.Lake Kemp Dam & Res............. TX Wichita............ Wichita R.......... F.................. 234.9 1156.0 1144.0 23830 15590 SD 144............. WF&C.;

MI................. 268.0 1144.0 1114.0 15590 3350 ................... WID2.Leesville Dam & Res............. VA Campbell Pttsylvnia Roanoke R.......... EQ................. 37.8 613.0 600.0 3235 2400 Fed Pwr Act........ Appl Pwr.Lemon Dam & Res................. CO La Plata........... Florida R.......... FIM................ 39.0 8148.0 8023.0 622 62 PL 84-485.......... USBR.Lewis M Smith Dam & Res......... AL Walker Culman...... Sipsey Fork; Black F.................. 280.6 522.0 510.0 25700 21200 Fed Pwr Act........ AL Pwr.

Warrior R. E.................. 394.3 510.0 488.0 21200 15097Little Wood..................... ID Blain.............. Little Wood R...... FI................. 30.0 5237.3 5127.4 572 0 PL 84-993.......... USBR.Logan Martin Dam & Res.......... AL Talladega.......... Cossa R............ F.................. 245.3 477.0 465.0 26310 15260 PL 83-436.......... AL Pwr.

E.................. 67.0 465.0 460.0 15263 11887Los Banos Dam & Detention....... CA Merced............. Los Banos Cr....... R.................. 20.6 327.8 231.2 467 0 ................... USBR.Los Banos Dam & Detention Res... CA Merced............. Los Banos Cr....... F.................. 14.0 353.5 327.8 619 467 PL 86-488.......... USBR.Lost Creek Dam & Res............ UT Morgan............. Lost Cr............ FEIM............... 20.0 6005.0 5912.0 365 93 PL 81-273.......... USBR.Lovewell Dam & Res.............. KS Jewell............. White Rock Cr...... F.................. 50.5 1595.3 1582.6 5025 2986 PL 78-534.......... USBR.

ICR................ 24.9 1582.6 1571.7 2986 1704 PL 79-732..........Marshall Ford Dam & Res......... TX Travis............. Colorado R......... F.................. 779.8 714.0 681.0 29060 18955 PL 73-392.......... LCRA

NEIM............... 810.5 681.0 618.0 18955 8050 PL 78-534..........Mayfield Dam & Res.............. WA Lewis.............. Cowlitz R.......... FER................ 21.4 425.0 415.0 2250 2030 FPC No 2016-A...... Tac WN.McGee Creek Dam & Res........... OK Atoka.............. McGee Cr........... F.................. 85.3 595.5 577.1 5540 3810 PL 94-423.......... USBR.

MCR................ 108.0 577.7 515.1 3810 370Medicine Cr Dam Harry Strunk Lk. NE Frontier........... Medicine Cr........ F.................. 52.7 2386.2 2366.1 3483 1840 PL 78-534.......... USBR.

ICR................ 26.8 2366.1 2343.0 1840 701 PL 84-505..........Mossyrock Dam Davisson Lk....... WA Lewis.............. Cowlitz R.......... FER................ 1397.0 778.5 600.0 11830 4250 FERC No 2016-B..... Tac, WNMt Park Dam Tom Steed Res....... OK Kiowa.............. W Otter Cr......... F.................. 20.3 1414.0 1411.0 7130 6400 PL 90-503.......... USBR.

MRC................ 89.0 1411.0 1386.3 6400 1270Navajo Dam & Res................ NM San Juan........... San Juan R......... FEIRQ.............. 1036.1 6085.0 5990.0 15610 7400 PL 84-485.......... USBR.

Rio Arriba.........New Bullards Bar Dam & Res...... CA Yuba............... Yuba R............. FEIMR.............. 170.0 1956.0 1918.3 4809 4225 PL 89-298.......... YCWA.

EIMR............... 790.9 1918.3 1447.5 4225 129

New Exchequer Dam & Lk.......... CA Tuolumne........... Merced R........... FEIR............... 400.0 867.0 799.7 7110 4849 PL 86-645.......... Mrcd, Irr.

EIR................ 451.6 799.7 660.0 4849 1900

IR................. 171.0 660.0 467.0 1900 150New Melones Dam & Lk............ CA Tuolumne........... Stanislaus R....... FEIMR.............. 450.0 1088.0 1049.5 12500 10900 PL 87-874.......... USBR.

Calaveras.......... EIMR............... 1670.0 1049.5 808.0 10900 3500

IMR................ 300.0 808.0 540.0 3500 0Northfield Mt (Up) PS........... MA Franklin........... Connecticut........ E.................. 14.0 965.0 938.0 196 134 FERC 1889.......... WMEC.Norton Dam & Kieth Sebelius Lk.. KS Norton............. Prairie Dog Cr..... F.................. 98.8 2331.4 2304.3 5316 2181 PL 78-534.......... USBR.

IMRC............... 30.7 2304.3 2280.4 2181 587 PL 79-526..........

PL 79-732..........Ochoco Dam & Res................ OR Crook.............. Ochoco Cr.......... FICR............... 52.5 3136.2 0.0 1130 130 PL 84-992.......... USBR.Oroville Dam & Lk............... CA Butte.............. Feather R.......... FEIMAR............. 750.0 900.0 848.5 15800 13346 PL 85-500.......... CA.

EIMAR.............. 2788.0 848.5 210.0 13346 0Pactola Dam & Res............... SD Pennington......... Rapid Cr........... F.................. 43.1 4621.5 4580.2 1230 860 PL 78-534.......... USBR.

IM................. 55.0 4580.2 4456.1 860 100Palisades Dam & Res............. ID Bonneville......... Snake R............ FIE................ 1202.0 5620.0 5452.0 16100 2170 PL 81-864.......... USBR.Paonia Dam & Res................ CO Gunnision.......... Muddy Cr........... FIR................ 17.0 6447.5 6373.0 334 120 PL 80-177.......... USBR.

PL 84-485..........Pensacola Dam Grand Lake O' the OK Mayes.............. Grand (Neosho) R... F.................. 525.0 755.0 745.0 59200 46500 PL 77-228.......... Grd, Auth.

Cherokees. E.................. 1192.0 745.0 705.0 46500 17000Pineview Dam & Res.............. UT Weber.............. Odgen R............ FEIM............... 110.0 4900.0 4818.0 2874 0 PL 81-273.......... USBR.Platoro Dam & Res............... CO Conejos............ Conejos R.......... F.................. 6.0 10034.0 10027.5 947 920 PL 76-640.......... USBR.

IR................. 54.0 10027.5 9911.0 920 0Priest Rapids Dam & Res......... WA Grant.............. Columbia R......... FER................ 44.0 488.0 481.5 7600 6500 FERC No 2114-A..... Grnt, PUD.Prineville Dam & Res............ OR Crook.............. Crooked R.......... FIRC............... 233.0 3257.9 3114.0 3997 140 PL-84-992.......... USBR.Prosser Cr Dam & Res............ CA Nevada............. Prosser Cr......... C.................. 8.6 5703.7 5661.0 334 86 PL 84-858.......... USBR.

FC................. 20.0 5761.0 5703.7 745 334 PL 85-706..........Pueblo Dam & Res................ CO Pueblo............. Arkansas R......... F.................. 93.0 4898.7 4880.5 5671 4640 PL 87-590.......... USBR.

IR................. 261.4 4880.5 4764.0 4640 421Red Willow Dam Hugh Butler Lk... NE Frontier........... Red Willow Cr...... F.................. 48.9 2604.9 2581.8 2682 1629 PL 78-534.......... USBR.

IRC................ 27.3 2581.8 2558.0 1629 787 PL 85-783..........

PL 84-505..........Ririe Dam & Res................. ID Bonneville......... Willow Cr.......... FIRC............... 99.0 5119.0 5023.0 150 360 PL 87-874.......... USBR.Roanoke Rapids Dam & Res........ NC Halifax............ Roanoke R.......... EC................. 16.8 132.0 128.0 4600 4100 FPC 2009........... VA, Pwr.Rocky Reach Dam Lk Entiat....... WA Chelan............. Columbia R......... FER................ 36.0 707.0 703.0 9920 9490 FERC No 2145....... Chln PUD.Rocky River PS Lk Candlewood.... CT Litchfield......... Housatonic R....... E.................. 142.5 430.0 418.0 5608 4692 FERC 2576.......... CLPC.Ross Dam & Res.................. WA Whatcom............ Skagit R........... E.................. 1052.0 1602.5 1475.0 11700 4450 FERC 553........... Sttl.Sanford Dam & Lk Meredith....... TX Hutchison.......... Canadian R......... F.................. 462.1 2965.0 2941.3 21640 17320 PL 81-898.......... USBR.

IMCRQ.............. 761.3 2941.3 2860.0 17320 4500Savage River Dam & Res.......... MD Garrett............ Savage R........... FMA................ 20.0 1468.5 1317.0 366 0 PL 78-534.......... Ptmc Comm.Scoggins Dam Henry Hagg Lk...... ..... ................... Scoggins Cr........ FIR................ 56.3 305.8 235.3 116 4 PL 89-596.......... USBR.Shadehill Dam & Res............. SD Perkins............ Grand R............ F.................. 218.3 2302.0 2271.9 9900 4800 PL 78-534.......... USBR.

IQ................. 80.9 2271.9 2250.8 4800 2800Shasta Dam Lk................... CA Shasta............. Sacramento R....... FEIA............... 1300.0 1067.0 1018.6 29570 23894 PL 75-392.......... USBR.

EIA................ 3241.0 1018.6 735.8 23894 2200Shepaug Dam & Lk................ CT Litchfield......... Housatonic R....... E.................. 5.0 200.0 172.0 1882 1125 FERC 2576.......... CLPC.

Smith Mtn Dam & Res............. VA Bedford............ Roanoke R.......... E.................. 40.8 795.0 793.0 20600 20200 Fed Pwr Act........ Appl Pwr.

Franklin...........

Roanoke............

Pttsylvnia.........Stampede Dam & Res.............. CA Sierra............. Little Truckee R... FEM................ 22.0 5949.0 5942.1 3430 3230 PL 84-858.......... USBR.

EM................. 199.4 5942.0 5798.0 3230 210Starvation Dam and Res.......... UT Duchesne........... Strawberry R....... FIM................ 165.3 5712.0 5595.0 3310 689 PL 84-485.......... USBR.Stevens Creek Dam & Res......... GA Columbia........... Savannah River..... P.................. 10.5 187.5 183.0 4300 0 FERC 2535.......... SC E&G.;Stevenson Dam Lk Zoar........... CT Litchfield......... Housatonic R....... E.................. 5.0 108.0 80.0 1148 516 FERC 2576.......... CLPC.Summer Dam & Lk................. NM De Baca............ Pecos R............ FI................. 51.4 4261.0 4200.0 2835 0 PL 83-780.......... USBR.Tat Momolikot Dam & Lake........ AZ Pinal.............. Santa Rosa Wash.... FIC................ 198.5 1539.0 1480.0 11790 0 PL 89-298.......... BIA.Tiber Dam & Res................. MT Libert Toole....... Marias R........... F.................. 400.9 3012.5 2993.0 23150 17890 PL 78-534.......... USBR.

FIQ................ 268.0 2993.0 2976.0 17890 13790

IQ................. 121.7 2976.0 2966.4 13790 11710Trenton Dam & Res............... NB Hitchcock.......... Republican R....... F.................. 134.1 2773.0 2752.0 7940 4922 PL 78-534.......... USBR.

IRC................ 99.8 2752.0 2720.0 4922 1572 PL 84-505..........Turners Falls (Low) Dam & Lk.... MA Franklin........... Connecticut R...... E.................. 8.7 185.0 176.0 2110 1880 FERC 1889.......... WMECTwin Buttes Dam & Lake.......... TX Tom Green.......... Concho R........... F.................. 454.4 1969.1 1940.2 23510 23510 PL 85-152.......... USBR

IM................. 150.0 1940.2 1885.0 9080 670 PL 78-534..........Twitchell Dam & Res............. CA Santa Barbara...... Cuyama R........... F.................. 89.8 651.5 623.0 3671 2556 PL 83-774.......... USBR

IM................. 135.6 623.0 504.0 2556 0Upper Baker Dam Baker Lk........ WA Whatcom............ Baker R............ FE................. 184.6 724.0 674.0 4985 2375 PL 89-298.......... Pgt

FERC 2150B......... P&L;Vallecito Dam & Res............. CO La Plata........... Los Pinos R........ FEI................ 125.4 7665.0 7582.5 2720 350 PL 61-288.......... USBR

PL 68-292..........Vernon Dam & Lk................. VT Windham............ Connecticut R...... E.................. 18.3 220.1 212.1 2550 1980 FERC 1904.......... NEPCWanapum Dam & Res............... WA Grant.............. Columbia R......... FER................ 151.6 571.5 560.0 14300 13350 FERC No 2114-B..... Grnt

PUDWanship Dam & Rockport.......... UT Summit............. Weber R............ FEIM............... 61.0 6037.0 5930.0 1077 121 PL 81-273.......... USBRWarm Springs Dam & Res.......... OR Malheur............ Middle Fork Malheur FICR............... 191.0 3406.0 3327.0 460 90 PL 78-534.......... Vale

R. USBRWaterbury Dam & Res............. VT Washington......... Little R........... FP................. 27.7 617.5 592.0 1330 890 PL 78-534.......... VTWebster Dam & Res............... KS Rocks.............. S Fork Solomon R... F.................. 183.4 1923.7 1892.5 8480 3772 PL 78-534.......... USBR

IRC................ 72.1 1892.5 1860.0 3772 906 PL 79-526..........

PL 79-732..........Weiss Dam & Res................. AL Cherokee........... Coosa R............ F.................. 397.0 574.0 564.0 50000 30200 PL 83-436.......... AL Pwr

E.................. 148.4 564.0 558.0 30200 19545Wells Dam L Pateros............. WA Douglas............ Columbia R......... FER................ 74.0 781.0 771.0 10000 8000 FERC No 2149....... Dgls

PUD

Wilder Dam & Lk................. VT Windsor............ Connecticut R...... E.................. 13.3 385.0 380.0 3100 2240 FERC 1893.......... NEPCYellowtail Dam & Bighorn Lk..... MT Big Horn........... Bighorn R.......... F.................. 258.3 3657.0 3640.0 17280 12600 PL 78-534.......... USBR

FEIQ............... 240.3 3640.0 3614.0 12600 6915 PUD

EIQ................ 336.1 3614.0 3547.0 6915 4150------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\1\ Cr--Creek; CS--Control Structure; Div--Diversion; DS--Drainage Structure; FG--Floodgate; Fk--Fork; GIWW--Gulf Intercoastal Waterway; Lk--Lake; L&D--Lock; & Dam; PS--Pump Station; R--River;

Res--Reservoir\2\ F--Flood Control; N--Navigation; P--Corps Hydropower; E--Non Corps Hydropower; I--Irrigation; M--Municipal and/or Industrial Water Supply; C--Fish and Wildlife Conservation; A--Low Flow

Augmentation or Pollution Abatement; R--Recreation; Q--Water Quality or Silt Control\3\ FCA--Flood Control Act; FERC--Federal Energy Regulatory Comm; HD--House Document; PL--Public Law; PW--Public Works; RHA--River & Harbor Act; SD--Senate Document; WSA--Water Supply Act\4\ Appl Pwr--Appalachian Power; Chln PUD--Chelan Cnty PUD 1; CLPC--CT Light & Power Co; Dgls PUD--Douglas Cnty PUD 1; DWR--Department of Water Resources; EB-MUD--East Bay Municipal Utility

Dist; GRD--Grand River Dam Auth; Grnt PUD--Grant Cnty PUD 2; Hnbl--city of Hannibal; LCRA--Lower Colorado River Authority; M&T; Irr--Modesto & Turlock Irr; Mrcd Irr--Merced Irr; NEPC--New

England Power Co; Pgnt P&L--Pugent; Sound Power & Light; Ptmc Comm--Upper Potomac R Comm; Rclm B--Reclamation Board; Rkfd--city of Rockford; Sttl--city of Seattle; Tac--City of Tacoma; Vale

USBR--50% Vale Irr 50% USBR; WF&CWID--City; of Wichita Falls and Wichita Cnty Water Improvement District No. 2; WMEC--Western MA Electric Co; YCWA--Yuba City Water Auth; Yolo FC&W--Yolo; Flood

Control & Water Conserv Dist. (Sec. 7, Pub. L. 78-534, 58 Stat. 890 (33 U.S.C. 709); the Federal Power Act, 41 Stat. 1063 (16 U.S.C. 791(A)); and sec. 9, Pub. L. 83-436, 68 Stat. 303) [43 FR 47184, Oct. 13, 1978, as amended at 46 FR 58075, Nov. 30, 1981; 55 FR 21508, May 24, 1990; 79 FR 13564, Mar. 11, 2014]