Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 1065  /  Sec. 1065.514 Cycle-validation criteria for operation over specified

Validate the execution of your duty cycle according to this section unless the standard-setting part specifies otherwise. This section describes how to determine if the engine's operation during the test adequately matched the reference duty cycle. This section applies only to speed, torque, and power from the engine's primary output shaft. Other work inputs and outputs are not subject to cycle-validation criteria. You must compare the original reference duty cycle points generated as described in Sec. 1065.512 to the corresponding feedback values recorded during the test. You may compare reference duty cycle points recorded during the test to the corresponding feedback values recorded during the test as long as the recorded reference values match the original points generated in Sec. 1065.512. The number of points in the validation regression are based on the number of points in the original reference duty cycle generated in Sec. 1065.512. For example if the original cycle has 1199 reference points at 1 Hz, then the regression will have up to 1199 pairs of reference and feedback values at the corresponding moments in the test. The feedback speed and torque signals may be filtered--either in real-time while the test is run or afterward in the analysis program. Any filtering that is used on the feedback signals used for cycle validation must also be used for calculating work. Feedback signals for control loops may use different filtering.

(a) Testing performed by EPA. Our tests must meet the specifications of paragraph (f) of this section, unless we determine that failing to meet the specifications is related to engine performance rather than to shortcomings of the dynamometer or other laboratory equipment.

(b) Testing performed by manufacturers. Emission tests that meet the specifications of paragraph (f) of this section satisfy the standard-setting part's requirements for duty cycles. You may ask to use a dynamometer or other laboratory equipment that cannot meet those specifications. We will approve your request as long as using the alternate equipment does not adversely affect your ability to show compliance with the applicable emission standards.

(c) Time-alignment. Because time lag between feedback values and the reference values may bias cycle-validation results, you may advance or delay the entire sequence of feedback engine speed and torque pairs to synchronize them with the reference sequence. If you advance or delay feedback signals for cycle validation, you must make the same adjustment for calculating work. You may use linear interpolation between successive recorded feedback signals to time shift an amount that is a fraction of the recording period.

(d) Omitting additional points. Besides engine cranking, you may omit additional points from cycle-validation statistics as described in the following table:

Table 1 of Sec. 1065.514--Permissible Criteria for Omitting Points From Duty-Cycle Regression Statistics----------------------------------------------------------------------------------------------------------------

When operator demand is at its . . . you may omit . . . if . . .----------------------------------------------------------------------------------------------------------------

For reference duty cycles that are specified in terms of speed and torque (fnref, Tref)----------------------------------------------------------------------------------------------------------------minimum................................. power and torque........... Tref <0% (motoring).minimum................................. power and speed............ fnref = 0% (idle speed) and Tref = 0%

(idle torque) and Tref - (2% [middot]

Tmax mapped) fnref or T >Tref but not if fn

speed. >(fnref [middot] 102%) and T >Tref (2% [middot] Tmax mapped).maximum................................. power and either torque or fn fnref or P >Pref but not if fn

speed. >(fnref [middot] 102%) and P >Pref + (2%

[middot] Pmax mapped).maximum................................. power and either torque or fn 1fn, feedback torque, a1T, and feedback power a1P.

(2) Intercepts for feedback speed, a0fn, feedback torque, a0T, and feedback power a0P.

(3) Standard estimates of error for feedback speed, SEEfn, feedback torque, SEET, and feedback power SEEP.

(4) Coefficients of determination for feedback speed, r\2\fn, feedback torque, r\2\T, and feedback power r\2\P.

(f) Cycle-validation criteria. Unless the standard-setting part specifies otherwise, use the following criteria to validate a duty cycle:

(1) For variable-speed engines, apply all the statistical criteria in Table 2 of this section.

(2) For constant-speed engines, apply only the statistical criteria for torque in Table 2 of this section.

(3) For discrete-mode steady-state testing, apply cycle-validation criteria by treating the sampling periods from the series of test modes as a continuous sampling period, analogous to ramped-modal testing and apply statistical criteria as described in paragraph (f)(1) or (f)(2) of this section. Note that if the gaseous and particulate test intervals are different periods of time, separate validations are required for the gaseous and particulate test intervals. Table 2 follows:

Table 2 of Sec. 1065.514--Default Statistical Criteria for Validating Duty Cycles----------------------------------------------------------------------------------------------------------------

Parameter Speed Torque Power----------------------------------------------------------------------------------------------------------------Slope, a1............................ 0.950 <=a1 <=1.030..... 0.830 <=a1 <=1.030..... 0.830 <=a1 <=1.030.Absolute value of intercept, <=10% of warm idle..... <=2% of maximum mapped <=2% of maximum mapped

[verbar]a0[verbar]. torque. power.Standard error of estimate, SEE...... <=5% of maximum test <=10% of maximum mapped <=10% of maximum mapped

speed. torque. power.Coefficient of determination, r2..... =0.970...... =0.850...... =0.910.---------------------------------------------------------------------------------------------------------------- [73 FR 37318, June 30, 2008, as amended at 73 FR 59330, Oct. 8, 2008; 75 FR 23042, Apr. 30, 2010; 76 FR 57450, Sept. 15, 2011]