CFR /  Title 40  /  Part 257  /  Sec. 257.100 Inactive CCR surface impoundments.

(a) Except as provided by paragraph (b) of this section, inactive CCR surface impoundments are subject to all of the requirements of this subpart applicable to existing CCR surface impoundments.

(b) An owner or operator of an inactive CCR surface impoundment that completes closure of such CCR unit, and meets all of the requirements of either paragraphs (b)(1) through (4) of this section or paragraph (b)(5) of this section no later than April 17, 2018, is exempt from all other requirements of this subpart.

(1) Closure by leaving CCR in place. If the owner or operator of the inactive CCR surface impoundment elects to close the CCR surface impoundment by leaving CCR in place, the owner or operator must ensure that, at a minimum, the CCR unit is closed in a manner that will:

(i) Control, minimize or eliminate, to the maximum extent feasible, post-closure infiltration of liquids into the waste and releases of CCR, leachate, or contaminated run-off to the ground or surface waters or to the atmosphere;

(ii) Preclude the probability of future impoundment of water, sediment, or slurry;

(iii) Include measures that provide for major slope stability to prevent the sloughing or movement of the final cover system; and

(iv) Minimize the need for further maintenance of the CCR unit.

(2) The owner or operator of the inactive CCR surface impoundment must meet the requirements of paragraphs (b)(2)(i) and (ii) of this section prior to installing the final cover system required under paragraph (b)(3) of this section.

(i) Free liquids must be eliminated by removing liquid wastes or solidifying the remaining wastes and waste residues.

(ii) Remaining wastes must be stabilized sufficient to support the final cover system.

(3) The owner or operator must install a final cover system that is designed to minimize infiltration and erosion, and at a minimum, meets the requirements of paragraph (b)(3)(i) of this section, or the requirements of an alternative final cover system specified in paragraph (b)(3)(ii) of this section.

(i) The final cover system must be designed and constructed to meet the criteria specified in paragraphs (b)(3)(i)(A) through (D) of this section.

(A) The permeability of the final cover system must be less than or equal to the permeability of any bottom liner system or natural subsoils present, or a permeability no greater than 1 x 10-5 centimeters/second, whichever is less.

(B) The infiltration of liquids through the CCR unit must be minimized by the use of an infiltration layer that contains a minimum of 18 inches of earthen material.

(C) The erosion of the final cover system must be minimized by the use of an erosion layer that contains a minimum of six inches of earthen material that is capable of sustaining native plant growth.

(D) The disruption of the integrity of the final cover system must be minimized through a design that accommodates settling and subsidence.

(ii) The owner or operator may select an alternative final cover system design, provided the alternative final cover system is designed and constructed to meet the criteria in paragraphs (b)(3)(ii)(A) through (C) of this section.

(A) The design of the final cover system must include an infiltration layer that achieves an equivalent reduction in infiltration as the infiltration layer specified in paragraphs (b)(3)(i)(A) and (B) of this section.

(B) The design of the final cover system must include an erosion layer that provides equivalent protection from wind or water erosion as the erosion layer specified in paragraph (b)(3)(i)(C) of this section.

(C) The disruption of the integrity of the final cover system must be minimized through a design that accommodates settling and subsidence.

(4) The owner or operator of the CCR surface impoundment must obtain a written certification from a qualified professional engineer stating that the design of the final cover system meets either the requirements of paragraphs (b)(3)(i) or (ii) of this section.

(5) Closure through removal of CCR. The owner or operator may alternatively elect to close an inactive CCR surface impoundment by removing and decontaminating all areas affected by releases from the CCR surface impoundment. CCR removal and decontamination of the CCR surface impoundment are complete when all CCR in the inactive CCR surface impoundment is removed, including the bottom liner of the CCR unit.

(6) The owner or operator of the CCR surface impoundment must obtain a written certification from a qualified professional engineer that closure of the CCR surface impoundment under either paragraphs (b)(1) through (4) or (b)(5) of this section is technically feasible within the timeframe in paragraph (b) of this section.

(7) If the owner or operator of the CCR surface impoundment fails to complete closure of the inactive CCR surface impoundment within the timeframe in paragraph (b) of this section, the CCR unit must comply with all of the requirements applicable to existing CCR surface impoundments under this subpart.

(c) Required notices and progress reports. An owner or operator of an inactive CCR surface impoundment that closes in accordance with paragraph (b) of this section must complete the notices and progress reports specified in paragraphs (c)(1) through (3) of this section.

(1) No later than December 17, 2015, the owner or operator must prepare and place in the facility's operating record a notification of intent to initiate closure of the CCR surface impoundment. The notification must state that the CCR surface impoundment is an inactive CCR surface impoundment closing under the requirements of paragraph (b) of this section. The notification must also include a narrative description of how the CCR surface impoundment will be closed, a schedule for completing closure activities, and the required certifications under paragraphs (b)(4) and (6) of this section, if applicable.

(2) The owner or operator must prepare periodic progress reports summarizing the progress of closure implementation, including a description of the actions completed to date, any problems encountered and a description of the actions taken to resolve the problems, and projected closure activities for the upcoming year. The annual progress reports must be completed according to the following schedule:

(i) The first annual progress report must be prepared no later than 13 months after completing the notification of intent to initiate closure required by paragraph (c)(1) of this section.

(ii) The second annual progress report must be prepared no later than 12 months after completing the first progress report required by paragraph (c)(2)(i) of this section.

(iii) The owner or operator has completed the progress reports specified in paragraph (c)(2) of this section when the reports are placed in the facility's operating record as required by Sec. 257.105(i)(2).

(3) The owner or operator must prepare and place in the facility's operating record a notification of completion of closure of the CCR surface impoundment. The notification must be submitted within 60 days of completing closure of the CCR surface impoundment and must include a written certification from a qualified professional engineer stating that the CCR surface impoundment was closed in accordance with the requirements of either paragraph (b)(1) through (4) or (b)(5) of this section.

(d) The owner or operator of the CCR unit must comply with the recordkeeping requirements specified in Sec. 257.105(i), the notification requirements specified in Sec. 257.106(i), and the internet requirements specified in Sec. 257.107(i).