Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 52  /  Sec. 52.1270 Identification of plan.

(a) Purpose and scope. This section sets forth the applicable State implementation plan for Mississippi under section 110 of the Clean Air Act, 42 U.S.C. 7401-7671q and 40 CFR part 51 to meet national ambient air quality standards.

(b) Incorporation by reference. (1) Material listed in paragraph (c) of this section with an EPA approval date prior to October 3, 2007, for Mississippi was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after October 3, 2007, for Mississippi will be incorporated by reference in the next update to the SIP compilation.

(1) Material listed in paragraph (c) of this section with an EPA approval date prior to October 3, 2007, for Mississippi was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after October 3, 2007, for Mississippi will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1).

(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street, SW., Atlanta, GA 30303, the Air and Radiation Docket and Information Center, EPA Headquarters Library, Infoterra Room (Room Number 3334), EPA West Building, 1301 Constitution Ave., NW., Washington, DC 20460, and the National Archives and Records Administration. If you wish to obtain materials from a docket in the EPA Headquarters Library, please call the Office of Air and Radiation (OAR) Docket/Telephone number: (202) 566-1742. For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

(c) EPA Approved Mississippi Regulations.

EPA-Approved Mississippi Regulations----------------------------------------------------------------------------------------------------------------

State effective

State citation Title/subject date EPA approval date Explanation----------------------------------------------------------------------------------------------------------------

APC-S-1 Air Emission Regulations for the Prevention, Abatement, and Control of Air Contaminants----------------------------------------------------------------------------------------------------------------Section 1....................... General........... 1/9/94............ 2/12/96, 61 FR

5295.Section 2....................... Definitions....... 1/9/94............ 2/12/96, 61 FR

5295.Section 3....................... Specific Criteria 5/28/99........... 12/20/02, 67 FR

for Sources of 77926.

Particulate

Matter.Section 4....................... Specific Criteria 1/9/94............ 2/12/96, 61 FR

for Sources of 5295.

Sulfur Compounds.Section 5....................... Specific Criteria 1/9/94............ 2/12/96, 61 FR

for Sources of 5295.

Chemical

Emissions.

Section 6....................... New Sources....... 5/28/99........... 12/20/02, 67 FR Subsection 2,

77926. ``Other

Limitations,''

and Subsection 3,

``New Source

Performance

Standards,'' are

not federally

approved.Section 7....................... Exceptions........ 2/4/72............ 5/31/72, 37 FR

10875.Section 9....................... Stack Height 5/1/86............ 9/23/87, 52 FR

Considerations.. 35704.Section 10...................... Provisions for 1/9/94............ 2/12/96, 61 FR

Upsets, Startups, 5295.

and Shutdowns.Section 11...................... Severability...... 1/9/94............ 2/12/96, 61 FR

5295.Section 14...................... Provision for the 12/17/06.......... 10/3/07, 72 FR

Clean Air 56268.

Interstate Rule.----------------------------------------------------------------------------------------------------------------

APC-S-2 Permit Regulations for the Construction and/or Operation of Air Emissions Equipment----------------------------------------------------------------------------------------------------------------Section I....................... General 8/27/05........... 7/10/06, 71 FR

Requirements. 38773.Section II...................... General Standards 8/27/05........... 7/10/06, 71 FR

Applicable to All 38773.

Permits.Section III..................... Application For 8/27/05........... 7/10/06, 71 FR

Permit To 38773.

Construct and

State Permit To

Operate New

Stationary Source.Section IV...................... Public 8/27/05........... 7/10/06, 71 FR

Participation and 38773.

Public

Availability of

Information.Section V....................... Application Review 8/27/05........... 7/10/06, 71 FR

38773.Section VI...................... Compliance Testing 8/27/05........... 7/10/06, 71 FR

38773.Section VII..................... Emission 8/27/05........... 7/10/06, 71 FR

Evaluation Report. 38773.Section VIII.................... Procedures for 8/27/05........... 7/10/06, 71 FR

Renewal of State 38773.

Permit To Operate.Section IX...................... Reporting and 8/27/05........... 7/10/06, 71 FR

Record Keeping. 38773.Section X....................... Emission Reduction 8/27/05........... 7/10/06, 71 FR

Schedule. 38773.Section XI...................... General Permits... 8/27/05........... 7/10/06, 71 FR

38773.Section XII..................... Multi-Media 8/27/05........... 7/10/06, 71 FR

Permits. 38773.Section XIII.................... Exclusions........ 8/27/05........... 7/10/06, 71 FR

38773.Section XIV..................... CAFO.............. 8/27/05........... 7/10/06, 71 FR

38773.Section XV...................... Options........... 8/27/05........... 7/10/06, 71 FR

38773.Section XVI..................... Permit Transfer... 8/27/05........... 7/10/06, 71 FR

38773.Section XVII.................... Severability...... 8/27/05........... 7/10/06, 71 FR

38773.----------------------------------------------------------------------------------------------------------------

APC-S-3 Regulations for the Prevention of Air Pollution Emergency Episodes----------------------------------------------------------------------------------------------------------------Section 1....................... General........... 2/4/72............ 5/31/72, 37 FR

10875.Section 2....................... Definitions....... 2/4/72............ 5/31/72, 37 FR

10875.Section 3....................... Episode Criteria.. 6/3/88............ 11/13/89, 54 FR

47211.Section 4....................... Emission Control 2/4/72............ 5/31/72, 37 FR

Action Programs. 10875.Section 5....................... Emergency Orders.. 6/3/88............ 11/13/89, 54 FR

47211.----------------------------------------------------------------------------------------------------------------

APC-S-5-Regulations for Prevention of Significant Deterioration for Air Quality----------------------------------------------------------------------------------------------------------------All............................. .................. 12/14/2011........ 3/5/2015, 80 FR The approval does

11893. not include

incorporation by

reference of the

CO2 Biomass

Deferral which

was withdrawn by

the State on

October 22, 2014.

On 9-26-2012, EPA

approved a

revision to APC-S-

5 which

incorporated by

reference the

regulations found

at 40 CFR 52.21

as of March 22,

2011. This

approval did not

include

Mississippi's

revision to IBR

(at Rule APC-S-5)

the term

``particulate

matter

emissions'' (as

promulgated in

the May 16, 2008

NSR PM2.5 Rule

(at 40 CFR

51.166(b)(49)(vi)

) and the PM2.5

SILs threshold

and provisions

(as promulgated

in the October

20, 2010 PM2.5

PSD Increment-

SILs-SMC Rule at

40 CFR

52.21(k)(2)).

Note: On October

22, 2014,

Mississippi

withdrew the

PM2.5 SILs

provision from

Mississippi's May

18, 2011 SIP

Submission.----------------------------------------------------------------------------------------------------------------

On December 29,

2010, EPA

approved a

revision to APC-S-

5 which

incorporated by

reference the

regulations found

at 40 CFR 52.21

as of September

13, 2010. See 75

FR 81858. That

action approved

the incorporation

by reference with

the exception of

the phrase

``except ethanol

production

facilities

producing ethanol

by natural

fermentation

under the North

American Industry

Classification

System (NAICS)

codes 325193 or

312140,'' APC-S-5

incorporated by

reference from 40

CFR

52.21(b)(1)(i)(a)

and

(b)(1(iii)(t).

Additionally,

that final EPA

action did not

incorporate by

reference, into

the Mississippi

SIP, the

administrative

regulations that

were amended in

the Fugitive

Emissions Rule

(73 FR 77882) and

are stayed

through October

3, 2011.----------------------------------------------------------------------------------------------------------------

Mississippi State Constitution----------------------------------------------------------------------------------------------------------------Article 4 Section 109........... Interest of Public 9/27/2012......... 4/8/2013

Officers in 78 FR 20795.......

Contracts.----------------------------------------------------------------------------------------------------------------

Mississippi Code----------------------------------------------------------------------------------------------------------------Section 25-4-25................. Persons required 9/27/2012......... 4/8/2013

to file statement 78 FR 20795.......

of economic

interest.Section 25-4-27................. Contents of 9/27/2012......... 4/8/2013

statement of 78 FR 20795.......

economic interest.Section 25-4-29................. Filing dates for 9/27/2012......... 4/8/2013

statement. 78 FR 20795.......Section 25-4-101................ Declaration of 9/27/2012......... 4/8/2013

public policy. 78 FR 20795.......Section 25-4-103................ Definitions....... 9/27/2012......... 4/8/2013

78 FR 20795.......Section 25-4-105................ Certain actions, 9/27/2012......... 4/8/2013

activities and 78 FR 20795.......

business

relationships

prohibited or

authorized;

contacts in

violation of

section voidable;

penalties.----------------------------------------------------------------------------------------------------------------

(d) EPA approved Mississippi source-specific requirements.

EPA Approved Mississippi Source-Specific Requirements----------------------------------------------------------------------------------------------------------------

State effective

Name of source Permit number date EPA approval date Explanation----------------------------------------------------------------------------------------------------------------None............................ .................. .................. .................. ..................----------------------------------------------------------------------------------------------------------------

(e) EPA approved Mississippi non-regulatory provisions.

EPA Approved Mississippi Non-Regulatory Provisions----------------------------------------------------------------------------------------------------------------

Applicable State submittal

Name of non-regulatory SIP geographic or date/effective EPA approval date Explanation

provision nonattainment area date----------------------------------------------------------------------------------------------------------------110(a)(1) and (2) Infrastructure Mississippi....... 12/7/2007......... 7/13/2011, 76 FR For the 1997 8-

Requirements for the 1997 8- 41123. hour ozone NAAQS.

Hour Ozone National Ambient Air

Quality Standards.Regional Haze Plan.............. Statewide......... 9/22/2008......... 6/27/2012, 77 FR

38191.Regional Haze Plan Update--E. I. Statewide......... 5/9/2011.......... 6/27/2012, 77 FR

Dupont Reasonable Progress and 38191.

Mississippi Phosphates BART

Determinations.110(a)(1) and (2) Infrastructure Mississippi....... 12/7/2007......... 10/9/2012, 77 FR With the exception

Requirements for 1997 Fine 61276. of sections

Particulate Matter National 110(a)(2)(D)(i),

Ambient Air Quality Standards. 110(a)(2)(E)(ii)

and 110(a)(2)(G).110(a)(1) and (2) Infrastructure Mississippi....... 10/6/2009......... 10/9/2012, 77 FR With the exception

Requirements for 2006 Fine 61276. of sections

Particulate Matter National 110(a)(2)(D)(i),

Ambient Air Quality Standards. 110(a)(2)(E)(ii)

and 110(a)(2)(G).110(a)(2)(G) Infrastructure Mississippi....... 7/26/2012......... 10/9/2012, 77 FR

Requirement for the 1997 and 61279.

2006 Fine Particulate Matter

National Ambient Air Quality

Standards.110(a)(2)(D)(i)(I) Mississippi....... 10/6/2009......... 10/11/2012, 77 FR EPA partially

Infrastructure Requirements for 61727. disapproved this

the 2006 24-hour PM2.5 NAAQS. SIP submission to

the extent that

it relied on the

Clean Air

Interstate Rule

to meet the

110(a)(2)(D)(i)(I

) requirements

for the 2006 24-

hour PM2.5 NAAQS.110(a)(2)(E)(ii) Infrastructure Mississippi....... 10/11/2012........ 4/8/2013.......... EPA disapproved

Requirement for the 1997 and 78 FR 20795....... the State's

2006 Fine Particulate Matter 110(a)(2)(E)(ii)

National Ambient Air Quality as it relates to

Standards. section

128(a)(2), the

significant

portion of income

requirement.110(a)(1) and (2) Infrastructure Mississippi....... 12/7/2007......... 4/12/2013, 78 FR Addressing element

Requirements for 1997 Fine 21845. 110(a)(2)(D)(i)(I

Particulate Matter National I) prong 3 only

Ambient Air Quality Standards.110(a)(1) and (2) Infrastructure Mississippi....... 10/6/2009......... 4/12/2013, 78 FR Addressing element

Requirements for 2006 Fine 21845. 110(a)(2)(D)(i)(I

Particulate Matter National I) prong 3 only

Ambient Air Quality Standards.

Transportation Conformity DeSoto County May 31, 2013...... 11-13-13, 78 FR

Interagency Consultation And portion of 67955.

General Provisions. Memphis, TN-AR-MS

2008 8-hour Ozone

Nonattainment

Area110(a)(1) and (2) Infrastructure Mississippi....... 12/7/2007......... 5/7/2014, 79 FR Addressing prong 4

Requirements for 1997 Fine 26148. of section

Particulate Matter National 110(a)(2)(D)(i)

Ambient Air Quality Standards. only.110(a)(1) and (2) Infrastructure Mississippi....... 10/6/2009......... 5/7/2014, 79 FR Addressing prong 4

Requirements for 2006 Fine 26148. of section

Particulate Matter National 110(a)(2)(D)(i)

Ambient Air Quality Standards. only.110(a)(1) and (2) Infrastructure Mississippi....... 7/26/2012......... 3/2/2015, 80 FR With the exception

Requirements for the 2008 8- 11133. of sections:

Hour Ozone National Ambient Air 110(a)(2)(C) and

Quality Standards. (J) concerning

PSD permitting

requirements;

110(a)(2)(D)(i)(I)

and (II) (prongs

1 through 4)

concerning

interstate

transport

requirements;

110(a)(2)(E)(ii)

concerning state

board majority

requirements

respecting

significant

portion of

income; and

110(a)(2)(J)

concerning

visibility

requirements.110(a)(1) and (2) Infrastructure Mississippi....... 11/17/2011........ 3/18/2015......... Addressing the PSD

Requirements for the 2008 Lead 80 FR 14023....... permitting

NAAQS. requirements of

sections

110(a)(2)(C),

110(a)(2)(D)(i)(I

I) (prong 3) and

110(a)(2)(J)

only.110(a)(1) and (2) Infrastructure Mississippi....... 5/29/2012 and 3/18/2015......... Addressing the PSD

Requirements for the 2008 Ozone amended on 7/26/ 80 FR 14203....... permitting

NAAQS. 2012. requirements of

sections

110(a)(2)(C),

110(a)(2)(D)(i)(I

I) (prong 3) and

110(a)(2)(J)

only.110(a)(1) and (2) Infrastructure Mississippi....... 2/28/2013......... 3/18/2015......... Addressing the PSD

Requirements for the 2010 NO2 80 FR 14023....... permitting

NAAQS. requirements of

sections

110(a)(2)(C),

110(a)(2)(D)(i)(I

I) (prong 3) and

110(a)(2)(J)

only.

110(a)(1) and (2) Infrastructure 11/4/2011......... 3/30/15........... 80 FR 16568....... With the exception

Requirements for the 2008 Lead of provisions

National Ambient Air Quality pertaining to PSD

Standards 110(a)(2)(E)(ii) permitting

Infrastructure Requirement for requirements in

2008 Lead National Ambient Air sections

Quality Standards. 110(a)(2)(C),

prong 3 of D(i)

and (J) and the

majority of

requirements

respecting

significant

portion of income

of section

110(a)(2)(E)(ii)

(related to

section

128(a)(2)).---------------------------------------------------------------------------------------------------------------- [62 FR 35442, July 1, 1997]

Editorial Note: For Federal Register citations affecting Sec. 52.1270, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.fdsys.gov.