Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 63  /  Sec. 63.11413 Who implements and enforces this subpart?

(a) This subpart can be implemented and enforced by the U.S. EPA, or a delegated authority such as a State, local, or tribal agency. If the U.S. EPA Administrator has delegated authority to a State, local, or tribal agency pursuant to 40 CFR part 63, subpart E, then that Agency has the authority to implement and enforce this subpart. You should contact your U.S. EPA Regional Office to find out if this subpart is delegated to a State, local, or tribal agency.

(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under 40 CFR part 63, subpart E, the authorities contained in paragraphs (b)(1) through (4) of this section are retained by the Administrator of the U.S. EPA and are not transferred to the State, local, or tribal agency.

(1) Approval of an alternative non-opacity emissions standard under Sec. 63.6(g).

(2) Approval of a major change to test methods under Sec. 63.7(e)(2)(ii) and (f). A ``major change to test method'' is defined in Sec. 63.90.

(3) Approval of a major change to monitoring under Sec. 63.8(f). A ``major change to monitoring'' is defined in Sec. 63.90.

(4) Approval of a major change to recordkeeping/reporting under Sec. 63.10(f). A ``major change to recordkeeping/reporting'' is defined in Sec. 63.90.

As required in Sec. 63.11409, you must install and operate capture systems and comply with the applicable emissions limit for each emissions source shown in the following table. [72 FR 38905, July 16, 2007, as amended at 73 FR 15928, Mar. 26, 2008]

Sec. Table 1 to Subpart NNNNNN of Part 63--HAP Emissions Sources ------------------------------------------------------------------------

Process Emissions sources------------------------------------------------------------------------1. Sodium chromate production.......... a. Ball mill used to grind

chromite ore.

b. Dryer used to dry chromite

ore.

c. Rotary kiln used to roast

chromite ore to produce sodium

chromate.

d. Secondary rotary kiln used

to recycle and refine residues

containing chromium compounds.

e. Residue dryer system.

f. Quench tanks.2. Sodium dichromate production........ a. Stack on the electrolytic

cell system used to produce

sodium dichromate.

b. Sodium dichromate

crystallization unit.

c. Sodium dichromate drying

unit.3. Chromic acid production............. a. Electrolytic cell system

used to produce chromic acid.

b. Melter used to produce

chromic acid.

c. Chromic acid crystallization

unit.

d. Chromic acid dryer.4. Chromic oxide production............ a. Primary rotary roasting kiln

used to produce chromic oxide.

b. Chromic oxide filter.

c. Chromic oxide dryer.

d. Chromic oxide grinding unit.

e. Chromic oxide storage

vessel.

f. Secondary rotary roasting

kiln.

g. Quench tanks.5. Chromium hydrate production......... a. Furnace used to produce

chromium hydrate.

b. Chromium hydrate grinding

unit.------------------------------------------------------------------------

As required in Sec. 63.11411(a), you must comply with the requirements of the General Provisions (40 CFR part 63, subpart A) as shown in the following table.

Table 2 to Subpart NNNNNN of Part 63--Applicability of General

Provisions to Subpart NNNNNN ----------------------------------------------------------------------------------------------------------------

Citation Subject Applies Explanation----------------------------------------------------------------------------------------------------------------63.1(a)(1), (a)(2), (a)(3), (a)(4), Applicability......... Yes.

(a)(6), (a)(10)-(a)(12), (b)(1),

(6), (a)(10)-(a)(12), (b)(1),

(b)(3), (c)(1), (c)(2), (c)(5),

(3), (c)(1), (c)(2), (c)(5),

(e).63.1(a)(5), (a)(7)-(a)(9), (b)(2), Reserved.............. No.

(c)(3), (c)(4), (d).63.2............................... Definitions........... Yes.63.3............................... Units and Yes.

(3), (c)(4), (d).63.2............................... Definitions........... Yes.63.3............................... Units and Yes.

Abbreviations.63.4............................... Prohibited Activities Yes.

and Circumvention.63.5............................... Preconstruction Review No.

and Notification

Requirements.63.6(a), (b)(1)-(b)(5), (b)(7), Compliance with Yes........................ The startup, shutdown,

(c)(1), (c)(2), (c)(5), (e)(1), Standards and and malfunction

(1), (c)(2), (c)(5), (e)(1), Standards and and malfunction

(e)(3)(i), (e)(3)(iii)-(e)(3)(ix), Maintenance requirements in Sec.

(3)(i), (e)(3)(iii)-(e)(3)(ix), Maintenance requirements in Sec.

(i), (e)(3)(iii)-(e)(3)(ix), Maintenance requirements in Sec.

(f), (g), (i), (j). Requirements. 63.6(e)(3) apply at

new and existing area

sources that choose

to comply with Sec.

63.11410(k)(2)

instead of the

requirements in Sec.

63.11410(k)(1).63.6(b)(6), (c)(3), (c)(4), (d), Reserved.............. No.

(e)(2), (e)(3)(ii), (h)(3),

(2), (e)(3)(ii), (h)(3),

(h)(5)(iv).

(5)(iv).

(iv).

63.6(h)(1)-(h)(4), (h)(5)(i)- No.................... Subpart NNNNNN does not

(h)(5)(iii), (h)(6)-(h)(9). include opacity or visible

(5)(iii), (h)(6)-(h)(9). include opacity or visible

(iii), (h)(6)-(h)(9). include opacity or visible

emissions standards or

require a continuous

opacity monitoring system..63.7(a), (e), (f), (g), (h)........ Performance Testing Yes........................ Subpart NNNNNN

Requirements. requires a

performance test for

a new source; a test

for an existing

source is not

required under the

conditions specified

in Sec. 63.11410(i).63.7(b), (c)....................... Yes/No................ Requirements for

notification of

performance test and for

quality assurance program

apply to new area sources

but not existing area

sources..63.8(a)(1), (a)(2), (b), (c)(1)- Monitoring Yes.

(c)(3), (f)(1)-(5). Requirements.63.8(a)(3)......................... Reserved.............. No.63.8(a)(4)......................... No.................... Subpart NNNNNN does not

(3), (f)(1)-(5). Requirements.63.8(a)(3)......................... Reserved.............. No.63.8(a)(4)......................... No.................... Subpart NNNNNN does not

require flares..63.8(c)(4)-(c)(8), (d), (e), No.................... Subpart NNNNNN establishes

(f)(6), (g). requirements for

(6), (g). requirements for

continuous parameter

monitoring systems..63.9(a), (b)(1), (b)(5), (c), (d), Notification Yes.

(i), (j). Requirements.63.9(e)............................ Yes/No................ Notification of performance

test is required only for

new area sources..63.9(b)(2)......................... Yes.63.9(b)(3), (h)(4)................. Reserved.............. No.63.9(b)(4), (h)(5)................. No.63.9(f), (g)....................... No.................... Subpart NNNNNN does not

include opacity or visible

emissions standards or

require a continuous

opacity monitoring system

or continuous emissions

monitoring system..63.9(h)(1)-(h)(3), (h)(6).......... Yes.63.10(a), (b)(1), (b)(2)(xii), Recordkeeping Yes.

(b)(2)(xiv), (b)(3). Requirements.63.10(b)(2)(i)-(b)(2)(v)........... Yes................... Recordkeeping requirements

(2)(xiv), (b)(3). Requirements.63.10(b)(2)(i)-(b)(2)(v)........... Yes................... Recordkeeping requirements

(xiv), (b)(3). Requirements.63.10(b)(2)(i)-(b)(2)(v)........... Yes................... Recordkeeping requirements

for startups, shutdowns,

and malfunctions apply to

new and existing area

sources that choose to

comply with Sec.

63.11410(k)(2)..63.10(b)(2)(vi)-(b)(2)(ix), (c)(1), Yes/No................ Requirements apply to

(c)(5)-(c)(14). continuous parameter

(5)-(c)(14). continuous parameter

monitoring systems at new

area sources but not

existing area sources..63.10(b)(2)(vii)(A)-(B), (b)(2)(x), No.

(b)(2)(xiii).63.10(c)(2)-(c)(4), (c)(9)......... Reserved.............. No.63.10(d)(1), (d)(4), (f)........... Reporting Requirements Yes.

(2)(xiii).63.10(c)(2)-(c)(4), (c)(9)......... Reserved.............. No.63.10(d)(1), (d)(4), (f)........... Reporting Requirements Yes.

(xiii).63.10(c)(2)-(c)(4), (c)(9)......... Reserved.............. No.63.10(d)(1), (d)(4), (f)........... Reporting Requirements Yes.

63.10(d)(2)........................ Yes................... Report of performance test

results applies to new

area sources; the results

of a previous test may be

submitted for an existing

area source under the

conditions specified in

Sec. 63.11410(i)..63.10(d)(3)........................ No.................... Subpart NNNNNN does not

include opacity or visible

emissions limits..63.10(d)(5)........................ Yes................... Requirements for startup,

shutdown, and malfunction

reports apply to new and

existing area sources that

choose to comply with Sec.

63.11410(k)(2)..63.10(e)(1)-(e)(2), (e)(4)......... No.................... Subpart NNNNNN does not

require a continuous

emissions monitoring

system or continuous

opacity monitoring system..63.10(e)(3)........................ Yes/No................ Semiannual reporting

requirements apply to new

area sources but not

existing area sources..63.11.............................. Control Device No......................... Subpart NNNNNN does

Requirements. not require flares.63.12.............................. State Authorities and Yes.

Delegations.63.13.............................. Addresses............. Yes.63.14.............................. Incorporations by Yes.

Reference.63.15.............................. Availability of Yes.

Information and

Confidentiality.63.16.............................. Performance Track Yes. ......................

Provisions.---------------------------------------------------------------------------------------------------------------- Subpart OOOOOO_National Emission Standards for Hazardous Air Pollutants

for Flexible Polyurethane Foam Production and Fabrication Area Sources

Source: 72 FR 38910, July 16, 2007, unless otherwise noted.

Applicability and Compliance Dates