Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 63  /  Sec. 63.1287 Alternative means of emission limitation.

(a) If, in the judgment of the Administrator, an alternative means of emission limitation will achieve a reduction in HAP emissions at least equivalent to the reduction in HAP emissions from that source achieved under the applicable requirements in Sec. Sec. 63.1274 through 63.1281, the Administrator will publish a notice in the Federal Register permitting the use of the alternative means for purposes of compliance with that requirement. The notice may condition the permission on requirements related to the operation and maintenance of the alternative means.

(b) Any notice under paragraph (a) of this section shall be published only after public notice and an opportunity for a hearing.

(c) Any person seeking permission to use an alternative means of compliance under this section shall collect, verify, and submit to the Administrator information showing that this means achieves equivalent emission reductions.[64 FR 32648, June 17, 1999, as amended at 77 FR 49597, Aug. 16, 2012] Sec. Sec. 63.1288-63.1289 [Reserved] Sec. Appendix: Table 1 to Subpart HHH of Part 63--List of Hazardous Air

Pollutants (HAP) for Subpart HHH ------------------------------------------------------------------------

CAS Number \a\ Chemical name------------------------------------------------------------------------75070.................................. Acetaldehyde71432.................................. Benzene (includes benzene in

gasoline)75150.................................. Carbon disulfide463581................................. Carbonyl sulfide100414................................. Ethyl benzene107211................................. Ethylene glycol75050.................................. Acetaldehyde50000.................................. Formaldehyde110543................................. n-Hexane91203.................................. Naphthalene108883................................. Toluene540841................................. 2,2,4-Trimethylpentane1330207................................ Xylenes (isomers and mixture)95476.................................. o-Xylene108383................................. m-Xylene106423................................. p-Xylene------------------------------------------------------------------------\a\ CAS numbers refer to the Chemical Abstracts Services registry number

assigned to specific compounds, isomers, or mixtures of compounds.

Appendix: Table 2 to Subpart HHH of Part 63--Applicability of 40 CFR

Part 63 General Provisions to Subpart HHH ------------------------------------------------------------------------

Applicable toGeneral provisions reference subpart HHH Explanation------------------------------------------------------------------------Sec. 63.1(a)(1)........... Yes.Sec. 63.1(a)(2)........... Yes.Sec. 63.1(a)(3)........... Yes.Sec. 63.1(a)(4)........... Yes.Sec. 63.1(a)(5)........... No.................. Section reserved.Sec. 63.1(a)(6) through Yes.

(a)(8).Sec. 63.1(a)(9)........... No.................. Section reserved.Sec. 63.1(a)(10).......... Yes.Sec. 63.1(a)(11).......... Yes.Sec. 63.1(a)(12).......... Yes.Sec. 63.1(b)(1)........... No.................. Subpart HHH

(8).Sec. 63.1(a)(9)........... No.................. Section reserved.Sec. 63.1(a)(10).......... Yes.Sec. 63.1(a)(11).......... Yes.Sec. 63.1(a)(12).......... Yes.Sec. 63.1(b)(1)........... No.................. Subpart HHH

specifies

applicability.Sec. 63.1(b)(2)........... Yes.Sec. 63.1(b)(3)........... No.Sec. 63.1(c)(1)........... No.................. Subpart HHH

specifies

applicability.Sec. 63.1(c)(2)........... No.Sec. 63.1(c)(3)........... No.................. Section reserved.Sec. 63.1(c)(4)........... Yes.Sec. 63.1(c)(5)........... Yes.Sec. 63.1(d).............. No.................. Section reserved.Sec. 63.1(e).............. Yes.Sec. 63.2................. Yes................. Except definition of

major source is

unique for this

source category and

there are

additional

definitions in

subpart HHH.Sec. 63.3(a) through (c).. Yes.Sec. 63.4(a)(1)........... Yes.................Sec. 63.4(a)(2)........... Yes.................Sec. 63.4(a)(3)........... No.................. Section reserved.Sec. 63.4(a)(4)........... No.................. Section reserved.Sec. 63.4(a)(5)........... No.................. Section reserved.Sec. 63.4(b).............. Yes.Sec. 63.4(c).............. Yes.

Sec. 63.5(a)(1)........... Yes.Sec. 63.5(a)(2)........... No.................. Preconstruction

review required

only for major

sources that

commence

construction after

promulgation of the

standard.Sec. 63.5(b)(1)........... Yes.Sec. 63.5(b)(2)........... No.................. Section reserved.Sec. 63.5(b)(3)........... Yes.Sec. 63.5(b)(4)........... Yes.Sec. 63.5(b)(5)........... No.................. Section reserved.Sec. 63.5(b)(6)........... Yes.Sec. 63.5(c).............. No.................. Section reserved.Sec. 63.5(d)(1)........... Yes.Sec. 63.5(d)(2)........... Yes.Sec. 63.5(d)(3)........... Yes.Sec. 63.5(d)(4)........... Yes.Sec. 63.5(e).............. Yes.Sec. 63.5(f)(1)........... Yes.Sec. 63.5(f)(2)........... Yes.Sec. 63.6(a).............. Yes.Sec. 63.6(b)(1)........... Yes.Sec. 63.6(b)(2)........... Yes.Sec. 63.6(b)(3)........... Yes.Sec. 63.6(b)(4)........... Yes.Sec. 63.6(b)(5)........... Yes.Sec. 63.6(b)(6)........... No.................. Section reserved.Sec. 63.6(b)(7)........... Yes.Sec. 63.6(c)(1)........... Yes.Sec. 63.6(c)(2)........... Yes.Sec. 63.6(c)(3) and (c)(4) No.................. Section reserved.Sec. 63.6(c)(5)........... Yes.Sec. 63.6(d).............. No.................. Section reserved.Sec. 63.6(e).............. Yes.Sec. 63.6(e).............. Yes................. Except as otherwise

specified.Sec. 63.6(e)(1)(i)........ No.................. See Sec.

63.1274(h) for

general duty

requirement.Sec. 63.6(e)(1)(ii)....... No.Sec. 63.6(e)(1)(iii)...... Yes.Sec. 63.6(e)(2)........... No.................. Section reserved.Sec. 63.6(e)(3)........... No.Sec. 63.6(f)(1)........... No.Sec. 63.6(f)(2)........... Yes.Sec. 63.6(f)(3)........... Yes.Sec. 63.6(g).............. Yes.Sec. 63.6(h)(1)........... No.Sec. 63.6(h)(2)........... Yes.Sec. 63.6(h)(3)........... No.................. Section reserved.Sec. 63.6(h)(4) through Yes.

(h)(9).Sec. 63.6(i)(1) through Yes.

(9).Sec. 63.6(i)(1) through Yes.

(i)(14).Sec. 63.6(i)(15).......... No.................. Section reserved.Sec. 63.6(i)(16).......... Yes.Sec. 63.6(j).............. Yes.Sec. 63.7(a)(1)........... Yes.Sec. 63.7(a)(2)........... Yes................. But the performance

(14).Sec. 63.6(i)(15).......... No.................. Section reserved.Sec. 63.6(i)(16).......... Yes.Sec. 63.6(j).............. Yes.Sec. 63.7(a)(1)........... Yes.Sec. 63.7(a)(2)........... Yes................. But the performance

test results must

be submitted within

180 days after the

compliance date.Sec. 63.7(a)(3)........... Yes.Sec. 63.7(a)(4)........... Yes.Sec. 63.7(b).............. Yes.Sec. 63.7(c).............. Yes.Sec. 63.7(d).............. Yes.Sec. 63.7(e)(1)........... No.Sec. 63.7(e)(2)........... Yes.Sec. 63.7(e)(3)........... Yes.Sec. 63.7(e)(4)........... Yes.Sec. 63.7(f).............. Yes.Sec. 63.7(g).............. Yes.Sec. 63.7(h).............. Yes.Sec. 63.8(a)(1)........... Yes.Sec. 63.8(a)(2)........... Yes.Sec. 63.8(a)(3)........... No.................. Section reserved.Sec. 63.8(a)(4)........... Yes.Sec. 63.8(b)(1)........... Yes.Sec. 63.8(b)(2)........... Yes.Sec. 63.8(b)(3)........... Yes.Sec. 63.8(c)(1)........... Yes.Sec. 63.8(c)(1)(i)........ No.

Sec. 63.8(c)(1)(ii)....... Yes.Sec. 63.8(c)(1)(iii)...... No.Sec. 63.8(c)(2)........... Yes.Sec. 63.8(c)(3)........... Yes.Sec. 63.8(c)(4)........... No.Sec. 63.8(c)(5) through Yes.

(c)(8).Sec. 63.8(d)(1)........... Yes.Sec. 63.8(d)(2)........... Yes.Sec. 63.8(d)(3)........... Yes................. Except for last

(8).Sec. 63.8(d)(1)........... Yes.Sec. 63.8(d)(2)........... Yes.Sec. 63.8(d)(3)........... Yes................. Except for last

sentence, which

refers to an SSM

plan. SSM plans are

not required.Sec. 63.8(e).............. Yes................. Subpart HHH does not

specifically

require continuous

emissions monitor

performance

evaluations,

however, the

Administrator can

request that one be

conducted.Sec. 63.8(f)(1) through Yes.

(f)(5).Sec. 63.8(f)(6)........... No.................. Subpart HHH does not

(5).Sec. 63.8(f)(6)........... No.................. Subpart HHH does not

require continuous

emissions

monitoring.Sec. 63.8(g).............. No.................. Subpart HHH

specifies

continuous

monitoring system

data reduction

requirements.Sec. 63.9(a).............. Yes.Sec. 63.9(b)(1)........... Yes.Sec. 63.9(b)(2)........... Yes................. Existing sources are

given 1 year

(rather than 120

days) to submit

this notification.Sec. 63.9(b)(3)........... No.................. Section reserved.Sec. 63.9(b)(4)........... Yes.Sec. 63.9(b)(5)........... Yes.Sec. 63.9(c).............. Yes.Sec. 63.9(d).............. Yes.Sec. 63.9(e).............. Yes.Sec. 63.9(f).............. Yes.Sec. 63.9(g).............. Yes.Sec. 63.9(h)(1) through Yes.

(h)(3).Sec. 63.9(h)(4)........... No.................. Section reserved.Sec. 63.9(h)(5) and (h)(6) Yes.Sec. 63.9(i).............. Yes.Sec. 63.9(j).............. Yes.Sec. 63.10(a)............. Yes.Sec. 63.10(b)(1).......... Yes................. Section

(3).Sec. 63.9(h)(4)........... No.................. Section reserved.Sec. 63.9(h)(5) and (h)(6) Yes.Sec. 63.9(i).............. Yes.Sec. 63.9(j).............. Yes.Sec. 63.10(a)............. Yes.Sec. 63.10(b)(1).......... Yes................. Section

63.1284(b)(1)

requires sources to

maintain the most

recent 12 months of

data on-site and

allows offsite

storage for the

remaining 4 years

of data.Sec. 63.10(b)(2).......... Yes.Sec. 63.10(b)(2)(i)....... No.Sec. 63.10(b)(2)(ii)...... No.................. See Sec.

63.1284(f) for

recordkeeping of

(1) occurrence and

duration and (2)

actions taken

during malfunction.Sec. 63.10(b)(2)(iii)..... Yes.Sec. 63.10(b)(2)(iv) No.

through (b)(2)(v).Sec. 63.10(b)(2)(vi) Yes.

through (b)(2)(xiv).Sec. 63.10(b)(3).......... No.Sec. 63.10(c)(1).......... Yes.Sec. 63.10(c)(2) through No.................. Sections reserved.

(c)(4).Sec. 63.10(c)(5) through Yes.

(4).Sec. 63.10(c)(5) through Yes.

(c)(8).Sec. 63.10(c)(9).......... No.................. Section reserved.Sec. 63.10(c)(10) through No.................. See Sec.

(8).Sec. 63.10(c)(9).......... No.................. Section reserved.Sec. 63.10(c)(10) through No.................. See Sec.

(c)(11). 63.1284(f) for

(11). 63.1284(f) for

recordkeeping of

malfunctions.Sec. 63.10(c)(12) through Yes.

(c)(14).Sec. 63.10(c)(15)......... No.Sec. 63.10(d)(1).......... Yes.Sec. 63.10(d)(2).......... Yes.Sec. 63.10(d)(3).......... Yes.Sec. 63.10(d)(4).......... Yes.Sec. 63.10(d)(5).......... No.................. See Sec.

(14).Sec. 63.10(c)(15)......... No.Sec. 63.10(d)(1).......... Yes.Sec. 63.10(d)(2).......... Yes.Sec. 63.10(d)(3).......... Yes.Sec. 63.10(d)(4).......... Yes.Sec. 63.10(d)(5).......... No.................. See Sec.

63.1285(b)(6) for

reporting of

malfunctions.Sec. 63.10(e)(1).......... Yes.Sec. 63.10(e)(2).......... Yes.Sec. 63.10(e)(3)(i)....... Yes................. Subpart HHH requires

major sources to

submit Periodic

Reports semi-

annually.Sec. 63.10(e)(3)(i)(A).... Yes.Sec. 63.10(e)(3)(i)(B).... Yes.Sec. 63.10(e)(3)(i)(C).... No.................. Section reserved.Sec. 63.10(e)(3)(i)(D).... Yes.Sec. 63.10(e)(3)(ii) Yes.

through (e)(3)(viii).Sec. 63.10(f)............. Yes.Sec. 63.11(a) through (e). Yes.Sec. 63.12(a) through (c). Yes.Sec. 63.13(a) through (c). Yes.Sec. 63.14(a) through (q). Yes.

Sec. 63.15(a) and (b)..... Yes. ....................------------------------------------------------------------------------ [77 FR 49597, Aug. 16, 2012] Subpart III_National Emission Standards for Hazardous Air Pollutants for

Flexible Polyurethane Foam Production

Source: 63 FR 53996, Oct. 7, 1998, unless otherwise noted.