Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 63  /  Sec. 63.2480 What requirements must I meet for equipment leaks?

(a) You must meet each requirement in table 6 to this subpart that applies to your equipment leaks, except as specified in paragraphs (b) through (d) of this section.

(b) If you comply with either subpart H or subpart UU of this part 63, you may elect to comply with the provisions in paragraphs (b)(1) through (5) of this section as an alternative to the referenced provisions in subpart H or subpart UU of this part.

(1) The requirements for pressure testing in Sec. 63.179(b) or Sec. 63.1036(b) may be applied to all processes, not just batch processes.

(2) For the purposes of this subpart, pressure testing for leaks in accordance with Sec. 63.179(b) or Sec. 63.1036(b) is not required after reconfiguration of an equipment train if flexible hose connections are the only disturbed equipment.

(3) For an existing source, you are not required to develop an initial list of identification numbers for connectors as would otherwise be required under Sec. 63.1022(b)(1) or Sec. 63.181(b)(1)(i).

(4) For connectors in gas/vapor and light liquid service at an existing source, you may elect to comply with the requirements in Sec. 63.169 or Sec. 63.1029 for connectors in heavy liquid service, including all associated recordkeeping and reporting requirements, rather than the requirements of Sec. 63.174 or Sec. 63.1027.

(5) For pumps in light liquid service in an MCPU that has no continuous process vents and is part of an existing source, you may elect to consider the leak definition that defines a leak to be 10,000 parts per million (ppm) or greater as an alternative to the values specified in Sec. 63.1026(b)(2)(i) through (iii) or Sec. 63.163(b)(2).

(c) If you comply with 40 CFR part 65, subpart F, you may elect to comply with the provisions in paragraphs (c)(1) through (9) of this section as an alternative to the referenced provisions in 40 CFR part 65, subpart F.

(1) The requirements for pressure testing in Sec. 65.117(b) may be applied to all processes, not just batch processes.

(2) For the purposes of this subpart, pressure testing for leaks in accordance with Sec. 65.117(b) is not required after reconfiguration of an equipment train if flexible hose connections are the only disturbed equipment.

(3) For an existing source, you are not required to develop an initial list of identification numbers for connectors as would otherwise be required under Sec. 65.103(b)(1).

(4) You may elect to comply with the monitoring and repair requirements specified in Sec. 65.108(e)(3) as an alternative to the requirements specified in Sec. 65.108(a) through (d) for any connectors at your affected source.

(5) For pumps in light liquid service in an MCPU that has no continuous process vents and is part of an existing source, you may elect to consider the leak definition that defines a leak to be 10,000 ppm or greater as an alternative to the values specified in Sec. 65.107(b)(2)(i) through (iii).

(6) When 40 CFR part 65, subpart F refers to the implementation date specified in Sec. 65.1(f), it means the compliance date specified in Sec. 63.2445.

(7) When Sec. Sec. 65.105(f) and 65.117(d)(3) refer to Sec. 65.4, it means Sec. 63.2525.

(8) When Sec. 65.120(a) refers to Sec. 65.5(d), it means Sec. 63.2515.

(9) When Sec. 65.120(b) refers to Sec. 65.5(e), it means Sec. 63.2520.

(d) The provisions of this section do not apply to bench-scale processes, regardless of whether the processes are located at the same plant site as a process subject to the provisions of this subpart. [71 FR 40335, July 14, 2006]