Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 63  /  Sec. 63.9375 What definitions apply to this subpart?

Terms used in this subpart are defined in the CAA; in 40 CFR 63.2, and in this section:

CAA means the Clean Air Act (42 U.S.C. 7401 et seq., as amended by Public Law 101-549, 104 Statute 2399).

Area source means any stationary source of HAP that is not a major source as defined in this part.

Combustion turbine engine means a device in which air is compressed in a compressor, enters a combustion chamber, and is compressed further by the combustion of fuel injected into the combustion chamber. The hot compressed combustion gases then expand over a series of curved vanes or blades arranged on a central spindle that rotates.

Deviation means any instance in which an affected source subject to this subpart, or an owner or operator of such a source:

(1) Fails to meet any requirement or obligation established by this subpart, including but not limited to any emission limitations;

(2) Fails to meet any term or condition that is adopted to implement an applicable requirement in this subpart and that is included in the operating permit for any affected source required to obtain such a permit; or

(3) Fails to meet any emission limitation in this subpart during malfunction, regardless or whether or not such failure is permitted by this subpart.

Engine means any internal combustion engine, any combustion turbine engine, or any rocket engine.

Engine Test Cell/Stand means any apparatus used for testing uninstalled stationary or uninstalled mobile (motive) engines.

Hazardous Air Pollutant (HAP) means any air pollutant listed in or pursuant to section 112(b) of the CAA.

Internal combustion engine means a device in which air enters a combustion chamber, is mixed with fuel, compressed in the chamber, and combusted. Fuel may enter the combustion chamber with the air or be injected into the combustion chamber. Expansion of the hot combustion gases in the chamber rotates a shaft, either through a reciprocating or rotary action. For purposes of this subpart, this definition does not include combustion turbine engines.

Major source, as used in this subpart, shall have the same meaning as in Sec. 63.2.

Malfunction means any sudden, infrequent, and not reasonably preventable failure of air pollution control equipment, process equipment, or a process to operate in a normal or usual manner which causes, or has the potential to cause, the emission limitations in an applicable standard to be exceeded. Failures that are caused in part by poor maintenance or careless operation are not malfunctions.

Rated power means the maximum power output of an engine in use.

Potential to emit means the maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the stationary source to emit a pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is federally enforceable.

Responsible official means responsible official as defined by 40 CFR 70.2.

Rocket engine means a device consisting of a combustion chamber in which materials referred to as propellants, which provide both the fuel and the oxygen for combustion, are burned. Combustion gases escape through a nozzle, providing thrust.

Uninstalled engine means an engine not installed in, or an integrated part of, the final product. [68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]

Sec. Table 1 to Subpart PPPPP of Part 63--Emission Limitations

You must comply with the emission limits that apply to your affected source in the following table as required by Sec. 63.9300. ------------------------------------------------------------------------

For each new or reconstructed affected

source located at a major source You must meet one of the

facility that is used in whole or in following emission limitations:

part for testing. . .------------------------------------------------------------------------1. internal combustion engines with a. limit the concentration of

rated power of 25 hp (19 kW) or more. CO or THC to 20 ppmvd or less

(corrected to 15 percent O2

content); or

b. achieve a reduction in CO or

THC of 96 percent or more

between the inlet and outlet

concentrations (corrected to

15 percent O2 content) of the

emission control device.------------------------------------------------------------------------

Sec. Table 2 to Subpart PPPPP of Part 63--Operating Limits

If you are required to comply with operating limits in Sec. 63.9302, you must comply with the applicable operating limits in the following table: ------------------------------------------------------------------------

and you must

demonstrate

For the following device. . You must meet the continuous

. following operating compliance with the

limit. . . operating limit by.

. .------------------------------------------------------------------------1. Thermal oxidizer......... a. The average i. Collecting the

combustion combustion

temperature in any temperature data

3-hour period must according to Sec.

not fall below the 63.9306(c);

combustion ii. Reducing the

temperature limit data to 3-hour

established block averages; and

according to Sec. iii. Maintaining the

63.9324(a). 3-hour average

combustion

temperature at or

above the

temperature limit.------------------------------------------------------------------------2. Catalytic oxidizer....... a. The average i. Collecting the

temperature temperature data

measured just according to Sec.

before the catalyst 63.9306(c);

bed in any 3-hour ii. Reducing the

period must not data to 3-hour

fall below the block averages; and

limit established iii. Maintaining the

according to Sec. 3-hour average

63.9324(b). temperature before

the catalyst bed at

or above the

temperature limit.

b. Either ensure i. Either collecting

that the average the temperature

temperature data according to

difference across Sec. 63.9306(c),

the catalyst bed in reducing the data

any 3-hour period to 3-hour block

does not fall below averages, and

the temperature maintaining the 3-

difference limit hour average

established temperature

according to Sec. difference at or

63.9324(b)(2) or above the

develop and temperature

implement an difference limit;

inspection and or

maintenance plan ii. Complying with

according to Sec. the inspection and

63.9324(b)(3) and maintenance plan

(4). developed according

to Sec.

63.9324(b)(3) and

(4).------------------------------------------------------------------------3. Emission capture system a. The direction of i. Collecting the

that is a PTE according to the air flow at all direction of air

Sec. 63.9322(a). times must be into flow; and either

the enclosure; and the facial velocity

either of air through all

natural draft

openings according

to Sec.

63.9306(d)(1) or

the pressure drop

across the

enclosure according

to Sec.

63.9306(d)(2); and

ii. Maintaining the

facial velocity of

air flow through

all natural draft

openings or the

pressure drop at or

above the facial

velocity limit or

pressure drop

limit, and

maintaining the

direction of air

flow into the

enclosure at all

times.

b. The average Follow the

facial velocity of requirements in 3ai

air through all and ii of this

natural draft table.

openings in the

enclosure must be

at least 200 feet

per minute; or

c. The pressure drop Follow the

across the requirements in 3ai

enclosure must be and ii of this

at least 0.007 inch table.

H2O, as established

in Method 204 of

appendix M to 40

CFR part 51.------------------------------------------------------------------------4. Emission capture system a. The average gas i. Collecting the

that is not a PTE according volumetric flow gas volumetric flow

to Sec. 63.9322(a). rate or duct static rate or duct static

pressure in each pressure for each

duct between a capture device

capture device and according to Sec.

add-on control 63.9306(d);

device inlet in any ii. Reducing the

3-hour period must data to 3-hour

not fall below the block averages; and

average volumetric iii. Maintaining the

flow rate or duct 3-hour average gas

static pressure volumetric flow

limit established rate or duct static

for that capture pressure for each

device according capture device at

Sec. 63.9306(d). or above the gas

volumetric flow

rate or duct static

pressure limit.------------------------------------------------------------------------

Sec. Table 3 to Subpart PPPPP of Part 63--Requirements for Initial

Compliance Demonstrations

As stated in Sec. 63.9321, you must demonstrate initial compliance with each emission limitation that applies to you according to the following table: ----------------------------------------------------------------------------------------------------------------

According to the

For each new or reconstructed You must. . . Using. . . following requirements.

affected source complying with. . . . .----------------------------------------------------------------------------------------------------------------1. The CO or THC outlet a. Demonstrate CO or i. EPA Methods 3A and You must demonstrate

concentration emission limitation. THC emissions are 20 10 of appendix A to 40 that the outlet

ppmvd or less. CFR part 60 for CO concentration of CO or

measurement or EPA THC emissions from the

Method 25A of appendix test cell/stand or

A to 40 CFR part 60 emission control device

for THC measurement; is 20 ppmvd or less,

or corrected to 15 percent

O2 content, using the

first 4-hour rolling

average after a

successful performance

evaluation.

ii. A CEMS for CO or This demonstration is

THC and O2 at the conducted immediately

outlet of the engine following a successful

test cell/stand or performance evaluation

emission control of the CEMS as required

device. in Sec. 63.9320(b).

The demonstration

consists of the first 4-

hour rolling average of

measurements. The CO or

THC concentration must

be corrected to 15

percent O2 content, dry

basis using Equation 1

in Sec. 63.9320.----------------------------------------------------------------------------------------------------------------2. The CO or THC percent reduction a. Demonstrate a i. You must conduct an You must demonstrate

emission limitation. reduction in CO or THC initial performance that the reduction in

of 96 percent or more. test to determine the CO or THC emissions is

capture and control at least 96 percent

efficiencies of the using the first 4-hour

equipment and to rolling average after a

establish operating successful performance

limits to be achieved evaluation. Your inlet

on a continuous basis; and outlet measurements

or must be on a dry basis

and corrected to 15

percent O2 content.

ii. A CEMS for CO or This demonstration is

THC and O2 at both the conducted immediately

inlet and outlet of following a successful

the emission control performance evaluation

device. of the CEMS as required

in Sec. 63.9320(b).

The demonstration

consists of the first 4-

hour rolling average of

measurements. The inlet

and outlet CO or THC

concentrations must be

corrected to 15 percent

O2 content using

Equation 1 in Sec.

63.9320. The reduction

in CO or THC is

calculated using

Equation 2 in Sec.

63.9320.----------------------------------------------------------------------------------------------------------------

Sec. Table 4 to Subpart PPPPP of Part 63--Initial Compliance With

Emission Limitations

As stated in Sec. 63.9330, you must demonstrate initial compliance with each emission limitation that applies to you according to the following table: ------------------------------------------------------------------------

You have demonstrated initial

For the. . . compliance if. . .------------------------------------------------------------------------1. CO or THC concentration emission The first 4-hour rolling

limitation. average CO or THC

concentration is 20 ppmvd or

less, corrected to 15 percent

O2 content.------------------------------------------------------------------------2. CO or THC percent reduction emission The first 4-hour rolling

limitation. average reduction in CO or THC

is 96 percent or more, dry

basis, corrected to 15 percent

O2 content.------------------------------------------------------------------------

Sec. Table 5 to Subpart PPPPP of Part 63--Continuous Compliance With

Emission Limitations

As stated in Sec. 63.9340, you must demonstrate continuous compliance with each emission limitation that applies to you according to the following table: ------------------------------------------------------------------------

For the. . . You must. . . By. . .------------------------------------------------------------------------1. CO or THC concentration a. Demonstrate CO or i. Collecting the

emission limitation. THC emissions are CPMS data according

20 ppmvd or less to Sec.

over each 4-hour 63.9306(a),

rolling averaging reducing the

period. measurements to 1-

hour averages; or

ii. Collecting the

CEMS data according

to Sec.

63.9307(a),

reducing the

measurements to 1-

hour averages,

correcting them to

15 percent O2

content, dry basis,

according to Sec.

63.9320;------------------------------------------------------------------------2. CO or THC percent a. Demonstrate a i. Collecting the

reduction emission reduction in CO or CPMS data according

limitation. THC of 96 percent to Sec.

or more over each 4- 63.9306(a),

hour rolling reducing the

averaging period. measurements to 1-

hour averages; or

ii. Collecting the

CEMS data according

to Sec.

63.9307(b),

reducing the

measurements to 1-

hour averages,

correcting them to

15 percent O2

content, dry basis,

calculating the CO

or THC percent

reduction according

to Sec. 63.9320.------------------------------------------------------------------------

Sec. Table 6 to Subpart PPPPP of Part 63--Requirements for Reports

As stated in Sec. 63.9350, you must submit each report that applies to you according to the following table: ------------------------------------------------------------------------

If you own or operate a new

or reconstructed affectedsource that must comply with The report must You must submit the

emission limitations, you contain. . . report. . .

must submit a. . .------------------------------------------------------------------------1. Compliance report........ a. If there are no Semiannually,

deviations from the according to the

emission requirements in

limitations that Sec. 63.9350.

apply to you, a

statement that

there were no

deviations from the

emission

limitations during

the reporting

period.

b. If there were no Semiannually,

periods during according to the

which the CEMS or requirements in

CPMS were out of Sec. 63.9350.

control as

specified in Sec.

63.8(c)(7), a

statement that

there were no

periods during

which the CEMS or

CPMS was out of

control during the

reporting period.

c. If you have a Semiannually,

deviation from any according to the

emission limitation requirements in

during the Sec. 63.9350.

reporting period,

the report must

contain the

information in Sec.

63.9350(c).

d. If there were Semiannually,

periods during according to the

which the CEMS or requirements in

CPMS were out of Sec. 63.9350.

control, as

specified in Sec.

63.8(c)(7), that

report must contain

the information in

Sec. 63.9350(d).

e. If you had an SSM Semiannually,

of a control device according to the

or associated requirements in

monitoring Sec. 63.9350.

equipment during

the reporting

period, the report

must include the

information in Sec.

63.10(d)(5)(i).------------------------------------------------------------------------

Sec. Table 7 to Subpart PPPPP of Part 63--Applicability of General

Provisions to Subpart PPPPP

As stated in 63.9365, you must comply with the General Provisions in Secs. 63.1 through 63.15 that apply to you according to the following table: ----------------------------------------------------------------------------------------------------------------

Applies to subpart

Citation Subject Brief description PPPPP----------------------------------------------------------------------------------------------------------------Sec. 63.1(a)(1)..................... Applicability.......... General applicability Yes. Additional terms

of the General defined in Sec.

Provisions. 63.9375.Sec. 63.1(a)(2)-(4)................. Applicability.......... Applicability of source Yes.

categories.Sec. 63.1(a)(5)..................... [Reserved].............Sec. 63.1(a)(6)-(7)................. Applicability.......... Contact for source Yes.

category information;

extension of

compliance through

early reduction.Sec. 63.1(a)(8)..................... Applicability.......... Establishment of State No. Refers to State

rules or programs. programs.Sec. 63.1(a)(9)..................... [Reserved].............Sec. 63.1(a)(10)-(14)............... Applicability.......... Explanation of time Yes.

periods, postmark

deadlines.Sec. 63.1(b)(1)..................... Applicability.......... Initial applicability.. Yes. Subpart PPPPP

clarifies

applicability at Sec.

63.9285.Sec. 63.1(b)(2)..................... Applicability.......... Title V operating Yes. All major affected

permit-reference to sources are required

part 70. to obtain a Title V

permit.Sec. 63.1(b)(3)..................... Applicability.......... Record of applicability Yes.

determination.Sec. 63.1(c)(1)..................... Applicability.......... Applicability after Yes. Subpart PPPPP

standards are set. clarifies the

applicability of each

paragraph of subpart A

to sources subject to

subpart PPPPP.Sec. 63.1(c)(2)..................... Applicability.......... Title V permit No. Area sources are

requirement for area not subject to subpart

sources. PPPPP.Sec. 63.1(c)(3)..................... [Reserved].............Sec. 63.1(c)(4)..................... Applicability.......... Extension of compliance No. Existing sources

for existing sources. are not covered by the

substantive control

requirements of

subpart PPPPP.Sec. 63.1(c)(5)..................... Applicability.......... Notification Yes.

requirements for an

area source becoming a

major source.Sec. 63.1(d)........................ [Reserved].............Sec. 63.1(e)........................ Applicability.......... Applicability of permit Yes.

program before a

relevant standard has

been set.Sec. 63.2........................... Definitions............ Definitions for Part 63 Yes. Additional

standards. definitions are

specified in Sec.

63.9375.Sec. 63.3........................... Units and Abbreviations Units and abbreviations Yes.

for Part 63 standards.Sec. 63.4........................... Prohibited Activities.. Prohibited activities; Yes.

compliance date;

circumvention,

severability.Sec. 63.5(a)........................ Construction/ Construction and Yes.

Reconstruction. reconstruction--applic

ability.Sec. 63.5(b)(1)..................... Construction/ Requirements upon Yes.

Reconstruction. construction or

reconstruction.Sec. 63.5(b)(2)..................... [Reserved].Sec. 63.5(b)(3)..................... Construction/ Approval of Yes.

Reconstruction. construction.Sec. 63.5(b)(4)..................... Construction/ Notification of Yes.

Reconstruction. construction.Sec. 63.5(b)(5)..................... Construction/ Compliance............. Yes.

Reconstruction.Sec. 63.5(b)(6)..................... Construction/ Addition of equipment.. Yes.

Reconstruction.Sec. 63.5(c)........................ [Reserved]Sec. 63.5(d)........................ Construction/ Application for Yes.

Reconstruction. construction

reconstruction.Sec. 63.5(e)........................ Construction/ Approval of Yes.

Reconstruction. construction or

reconstruction.Sec. 63.5(f)........................ Construction/ Approval of Yes.

Reconstruction. construction or

reconstruction based

on prior State review.Sec. 63.6(a)........................ Applicability.......... Applicability of Yes.

standards and

monitoring

requirements.Sec. 63.6(b)(1)-(2)................. Compliance Dates for Standards apply at Yes.

New and Reconstructed effective date; 3

Sources. years after effective

date; upon startup; 10

years after

construction or

reconstruction

commences for 112(f).

Sec. 63.6(b)(3)..................... Compliance Dates for Compliance dates for No. Compliance is

New and Reconstructed sources constructed or required by startup or

Sources. reconstructed before effective date.

effective date.Sec. 63.6(b)(4)..................... Compliance Dates for Compliance dates for Yes.

New and Reconstructed sources also subject

Sources. to Sec. 112(f)

standards.Sec. 63.6(b)(5)..................... Compliance Dates for Notification........... Yes.

New and Reconstructed

Sources.Sec. 63.6(b)(6)..................... [Reserved].Sec. 63.6(b)(7)..................... Compliance Dates for Compliance dates for Yes.

New and Reconstructed new and reconstructed

Sources. area sources that

become major.Sec. 63.6(c)(1)-(2)................. Compliance Dates for Effective date No. Existing sources

Existing Sources. establishes compliance are not covered by the

date. substantive control

requirements of

subpart PPPPP.Sec. 63.6(c)(3)-(4)................. [Reserved].Sec. 63.6(c)(5)..................... Compliance Dates for Compliance dates for Yes. If the area source

Existing Sources. existing area sources become a major source

that becomes major. by addition or

reconstruction, the

added or reconstructed

portion will be

subject to subpart

PPPPP.Sec. 63.6(d)........................ [Reserved].Sec. 63.6(e)(1)-(2)................. Operation and Operation and Yes. Except that you

Maintenance maintenance. are not required to

Requirements. have an SSMP for

control devices and

associated monitoring

equipment.Sec. 63.6(e)(3)..................... SSMP................... 1. Requirement for SSM Yes. You must develop

and SSMP. an SSMP for each

2. Content of SSMP..... control device and

associated monitoring

equipment.Sec. 63.6(f)(1)..................... Compliance Except You must comply with Yes, but you must

During SSM. emission standards at comply with emission

all times except standards at all times

during SSM of control except during SSM of

devices or associated control devices and

monitoring equipment. associated monitoring

equipment only.Sec. 63.6(f)(2)-(3)................. Methods for Determining Compliance based on Yes.

Compliance. performance test,

operation and

maintenance plans,

records, inspection.Sec. 63.6(g)(1)-(3)................. Alternative Standard... Procedures for getting Yes.

an alternative

standard.Sec. 63.6(h)........................ Opacity/Visible Requirements for No. Subpart PPPPP does

Emission (VE) opacity/VE standards. not establish opacity/

Standards. VE standards and does

not require continuous

opacity monitoring

systems (COMS).Sec. 63.6(i)(1)-(14)................ Compliance Extension... Procedures and criteria No. Compliance

for Administrator to extension provisions

grant compliance apply to existing

extension. sources, which do not

have emission

limitations in subpart

PPPPP.Sec. 63.6(j)........................ Presidential Compliance President may exempt Yes.

Exemption. source category from

requirement to comply

with rule.Sec. 63.7(a)(1)-(2)................. Performance Test Dates. Dates for conducting Yes.

initial performance

testing and other

compliance

demonstrations: Must

conduct within 180

days after first

subject to rule.Sec. 63.7(a)(3)..................... Section 114 Authority.. Administrator may Yes.

require a performance

test under CAA Section

114 at any time.Sec. 63.7(b)(1)..................... Notification Must notify Yes.

Performance Test. Administrator 60 days

before the test.

Sec. 63.7(b)(2)..................... Notification of If have to reschedule Yes.

Rescheduling. performance test, must

notify Administrator 5

days before schedule

date of rescheduled

date.Sec. 63.7(c)........................ Quality Assurance/Test 1. Requirement to Yes.

Plan. submit site-specific

test plan 60 days

before the test or on

date Administrator

agrees with.

2. Test plan approval Yes.

procedures.

3. Performance audit Yes.

requirements.

4. Internal and Yes.

external QA procedures

for testing.Sec. 63.7(d)........................ Testing Facilities..... Requirements for Yes.

testing facilities.Sec. 63.7(e)(1)..................... Conditions for Performance tests must Yes.

Conducting Performance be conducted under

Tests. representative

conditions; cannot

conduct performance

tests during SSM; not

a violation to exceed

standard during SSM.Sec. 63.7(e)(2)..................... Conditions for Must conduct according Yes.

Conducting Performance to rule and EPA test

Tests. methods unless

Administrator approves

alternative.Sec. 63.7(e)(3)..................... Test Run Duration...... 1. Must have three test Yes.

runs of at least 1

hour each.

2. Compliance is based Yes.

on arithmetic mean of

three runs.

3. Conditions when data Yes.

from an additional

test run can be used.Sec. 63.7(e)(4)..................... Other Performance Administrator may Yes.

Testing. require other testing

under section 114 of

the CAA.Sec. 63.7(f)........................ Alternative Test Method Procedures by which Yes.

Administrator can

grant approval to use

an alternative test

method.Sec. 63.7(g)........................ Performance Test Data 1. Must include raw Yes.

Analysis. data in performance

test report.

2. Must submit Yes.

performance test data

60 days after end of

test with the

Notification of

Compliance Status.

3. Keep data for 5 Yes.

years.Sec. 63.7(h)........................ Waiver of Tests........ Procedures for Yes.

Administrator to waive

performance test.Sec. 63.8(a)(1)..................... Applicability of Subject to all Yes. Subpart PPPPP

Monitoring monitoring contains specific

Requirements. requirements in requirements for

standard. monitoring at Sec.

63.9325.Sec. 63.8(a)(2)..................... Performance Performance Yes.

Specifications. Specifications in

appendix B of part 60

apply.Sec. 63.8(a)(3)..................... [Reserved]Sec. 63.8(a)(4)..................... Monitoring with Flares. Unless your rule says No. Subpart PPPPP does

otherwise, the not have monitoring

requirements for requirements for

flares in 63.11 apply. flares.Sec. 63.8(b)(1)..................... Monitoring............. Must conduct monitoring Yes.

according to standard

unless Administrator

approves alternative.Sec. 63.8(b)(2)-(3)................. Multiple Effluents and 1. Specific Yes.

Multiple Monitoring requirements for

Systems. installing monitoring

systems.

2. Must install on each Yes.

effluent before it is

combined and before it

is released to the

atmosphere unless

Administrator approves

otherwise.

3. If more than one Yes.

monitoring system on

an emission point,

must report all

monitoring system

results, unless one

monitoring system is a

backup.Sec. 63.8(c)(1)..................... Monitoring System Maintain monitoring Yes.

Operation and system in a manner

Maintenance. consistent with good

air pollution control

practices.Sec. 63.8(c)(1)(i).................. Routine and predictable 1. Keep parts for Yes.

CMS malfunctions. routine repairs of CMS

readily available.

2. Reporting

requirements for SSM

when action is

described in SSMP.

3. Reporting Yes.

requirements for SSM

when action is

described in SSMP.Sec. 63.8(c)(1)(ii)................. SSM of CMS Not in SSMP. Reporting requirements Yes.

for SSM of CMS when

action is not

described in SSMP.Sec. 63.8(c)(1)(iii)................ Compliance with 1. How Administrator Yes.

Operation and determines if source

Maintenance complying with

Requirements. operation and

maintenance

requirements.

2. Review of source O&M;

procedures, records,

manufacturer's

instructions and

recommendations, and

inspection.Sec. 63.8(c)(2)-(3)................. Monitoring System 1. Must install to get Yes.

Installation. representative

emission of parameter

measurements.

2. Must verify Yes.

operational status

before or at

performance test.Sec. 63.8(c)(4)..................... Continuous Monitoring 1. CMS must be No. Follow specific

System (CMS) operating except requirements in Sec.

Requirements. during breakdown, out 63.9335(a) and (b) of

of control, repair, subpart PPPPP.

maintenance, and high-

level calibration

drifts.

2. COMS must have a No. Follow specific

minimum of one cycle requirements in Sec.

of sampling and 63.9335(a) and (b) of

analysis for each subpart PPPP.

successive 10-second

period and one cycle

of data recording for

each successive 6-

minute period.

3. CEMS must have a No. Follow specific

minimum of one cycle requirements in Sec.

of operation for each 63.9335(a) and (b) of

successive 15-minute subpart PPPPP.

period.Sec. 63.8(c)(5)..................... COMS Minimum Procedures COMS minimum procedures No. Subpart PPPPP does

not have opacity/VE

standards.Sec. 63.8(c)(6)-(8)................. CMS Requirements....... Zero and high-level Yes. Except that PPPP

calibration check does not require COMS.

requirements, out-of-

control periods.Sec. 63.8(d)........................ CMS Quality Control.... 1. Requirements for CMS Yes.

quality control,

including calibration,

etc.

2. Must keep quality Yes.

control plan on record

for 5 years. Keep old

versions for 5 years

after revisions.Sec. 63.8(e)........................ CMS Performance Notification, Yes. Except for Sec.

Evaluation. performance evaluation 63.8(e)(5)(ii), which

test plan, reports. applies to COMS.

Sec. 63.8(f)(1)-(5)................. Alternative Monitoring Procedures for Yes.

Method. Administrator to

approve alternative

monitoring.Sec. 63.8(f)(6)..................... Alternative to Relative Procedures for Yes.

Accuracy Test. Administrator to

approve alternative

relative accuracy

tests for CEMS.Sec. 63.8(g)........................ Data Reduction......... 1. COMS 6-minute Yes. Except that

averages calculated provisions for COMS

over at least 36 are not applicable.

evenly spaced data Averaging periods for

points. demonstrating

2. CEMS 1-hour averages compliance are

computed over at least specified at Sec.

4 equally spaced data 63.9340.

points.Sec. 63.8(g)(5)..................... Data Reduction......... Data that cannot be No. Specific language

used in computing is located at Sec.

averages for CEMS and 63.9335(a).

COMS.Sec. 63.9(a)........................ Notification Applicability and State Yes.

Requirements. delegation.Sec. 63.9(b)(1)-(5)................. Initial Notifications.. 1. Submit notification Yes.

subject 120 days after

effective date.

2. Notification of Yes.

intent to construct/

reconstruct;

notification of

commencement of

construct/

reconstruct;

notification of

startup.

3. Contents of each.... Yes.Sec. 63.9(c)........................ Request for Compliance Can request if cannot No. Compliance

Extension. comply by date or if extensions do not

installed BACT/LAER. apply to new or

reconstructed sources.Sec. 63.9(d)........................ Notification of Special For sources that Yes.

Compliance commence construction

Requirements for New between proposal and

Source. promulgation and want

to comply 3 years

after effective date.Sec. 63.9(e)........................ Notification of Notify Administrator 60 No. Subpart PPPPP does

Performance Test. days prior. not require

performance testing.Sec. 63.9(f)........................ Notification of Opacity/ Notify Administrator 30 No. Subpart PPPPP does

VE Test. days prior. not have opacity/VE

standards.Sec. 63.9(g)(1)..................... Additional Notification of Yes.

Notifications when performance evaluation.

Using CMS.Sec. 63.9(g)(2)..................... Additional Notification of use of No. Subpart PPPPP does

Notifications when COMS data. not contain opacity or

Using CMS. VE standards.Sec. 63.9(g)(3)..................... Additional Notification that Yes. If alternative is

Notifications when exceeded criterion for in use.

Using CMS. relative accuracy.Sec. 63.9(h)(1)-(6)................. Notification of 1. Contents............ Yes.

Compliance Status.

2. Due 60 days after Yes.

end of performance

test or other

compliance

demonstration, except

for opacity/VE, which

are due 30 days after.

3. When to submit to Yes.

Federal vs. State

authority.Sec. 63.9(i)........................ Adjustment of Submittal Procedures for Yes.

Deadlines. Administrator to

approve change in when

notifications must be

submitted.Sec. 63.9(j)........................ Change in Previous Must submit within 15 Yes.

Information. days after the change.Sec. 63.10(a)....................... Recordkeeping/Reporting 1. Applies to all, Yes.

unless compliance

extension.

2. When to submit to Yes.

Federal vs. State

authority.

3. Procedures for Yes.

owners of more than

one source.Sec. 63.10(b)(1).................... Recordkeeping/Reporting 1. General requirements Yes.

2. Keep all records Yes.

readily available.

3. Keep for 5 years.... Yes.Sec. 63.10(b)(2)(i)-(v)............. Records Related to SSM. 1. Occurrence of each Yes.

of operation (process

equipment).

2. Occurrence of each Yes.

malfunction of air

pollution equipment.

3. Maintenance on air Yes.

pollution control

equipment.

4. Actions during SSM.. Yes.

5. All information Yes.

necessary to

demonstrate

conformance with the

SSMP.Sec. 63.10(b)(2)(vi)-(xi)........... CMS Records............ Malfunctions, Yes.

inoperative, out of

control.Sec. 63.10(b)(2)(xii)............... Records................ Records when under Yes.

waiver.Sec. 63.10(b)(2)(xiii).............. Records................ Records when using Yes.

alternative to

relative accuracy test.Sec. 63.10(b)(2)(xiv)............... Records................ All documentation Yes.

supporting initial

notification and

notification of

compliance status.Sec. 63.10(b)(3).................... Records................ Applicability Yes.

determinations.Sec. 63.10(c)(1)-(6), (9)-(15)...... Records................ Additional records for Yes.

CEMS.Sec. 63.10(c)(7)-(8)................ Records................ Records of excess No. Specific language

emissions and is located at Sec.

parameter monitoring 63.9355 of subpart

exceedances for CMS. PPPPP.Sec. 63.10(d)(1).................... General Reporting Requirement to report.. Yes.

Requirements.Sec. 63.10(d)(2).................... Report of Performance When to submit to Yes.

Test Results. Federal or State

authority.Sec. 63.10(d)(3).................... Reporting Opacity or VE What to report and when No. Subpart PPPPP does

Observations. not have opacity/VE

standards.Sec. 63.10(d)(4).................... Progress Reports....... Must submit progress No. Compliance

reports on schedule if extensions do not

under compliance apply to new or

extension. reconstructed sources.Sec. 63.10(d)(5).................... SSM Reports............ Contents and submission Yes.Sec. 63.10(e)(1) and (2)(i)......... Additional CMS Reports. Additional CMS reports. Yes.Sec. 63.10(e)(2)(ii)................ Additional CMS Reports. COMS-related report.... No. Subpart PPPPP does

not require COMS.Sec. 63.10(e)(3).................... Additional CMS Reports. Excess emissions and No. Specific language

parameter exceedances is located in Sec.

reports. 63.9350 of subpart

PPPPP.Sec. 63.10(e)(4).................... Additional CMS Reports. Reporting COMS data.... No. Subpart PPPPP does

not require COMS.Sec. 63.10(f)....................... Waiver for Procedures for Yes.

Recordkeeping/ Administrator to waive.

Reporting.Sec. 63.11.......................... Control Device Requirements for flares No. Subpart PPPPP does

Requirements. not specify use of

flares for compliance.Sec. 63.12.......................... State Authority and State authority to Yes.

Delegations. enforce standards.Sec. 63.13.......................... Addresses of State Air Addresses where Yes.

Pollution Control reports,

Offices and EPA notifications, and

Regional Offices. requests are sent.Sec. 63.14.......................... Incorporations by Test methods Yes. ASTM D 6522-00 and

Reference. incorporated by ANSI/ASME PTC 19.10-

reference. 1981 (incorporated by

reference-See Sec.

63.14).Sec. 63.15.......................... Availability of Public and confidential Yes.

Information and information.

Confidentiality.---------------------------------------------------------------------------------------------------------------- [68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]

Subpart QQQQQ_National Emission Standards for Hazardous Air Pollutants

for Friction Materials Manufacturing Facilities

Source: 67 FR 64506, Oct. 18, 2002, unless otherwise noted.

What This Subpart Covers