Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 86  /  Sec. 86.1530 Test sequence; general requirements.

(a) The following test sequence lists the major steps encountered during the idle test: PreparationWarm-up (or Emission Test)Preconditioning, 30 seconds minimum, six minutes maximumIdle Stabilization, 30[5 secondsIdle Emission Sampling, one minute minimum, six minutes maximum These steps are described by subsequent procedures.

(b) Ambient test cell conditions during the test shall be those specified in Sec. 86.130-78 or 40 CFR part 1065, subpart F. [48 FR 52252, Nov. 16, 1983, as amended at 70 FR 40441, July 13, 2005. Redesignated at 73 FR 37194, June 30, 2008]