Code of Federal Regulations (alpha)

CFR /  Title 46  /  Part 110  /  Sec. 110.25-3 Procedure for submitting plans.

(a) The plans required by Sec. 110.25-1 must be submitted to one of the following Coast Guard offices:

(1) By visitors to the Commanding Officer, Marine Safety Center, U.S. Coast Guard, 4200 Wilson Boulevard Suite 400, Arlington, VA 22203, or by mail to: Commanding Officer (MSC), Attn: Marine Safety Center, U.S. Coast Guard Stop 7410, 4200 Wilson Boulevard Suite 400, Arlington, VA 20598-7410, in a written or electronic format. Information for submitting the VSP electronically can be found at http://www.uscg.mil/HQ/MSC.

(2) The Officer in Charge, Marine Inspection at or nearest the place where the vessel is to be built.

(b) [Reserved]

(c) Three copies of each plan are required so that one can be returned to the submitter. If the submitter desires additional copies of approved plans, he should submit enough for the necessary distribution.

Note: The Coast Guard and the American Bureau of Shipping (ABS) coordinate plan review for vessels classed by the ABS in order to eliminate duplication of effort. An applicant for plan review of a vessel that is classed by the ABS should consult Commanding Officer, Marine Safety Center, to determine applicable procedures for submitting plans. [CGD 74-125A, 47 FR 15232, Apr. 8, 1982]

Editorial Note: For Federal Register citations affecting Sec. 110.25-3, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.fdsys.gov.

Editorial Note: By CGD 96-041, 61 FR 50730, Sept. 27, 1996, paragraph (a)(1) of Sec. 110.25-3 was amended by removing the word ``(G-MSC)''. However, by CGD 94-108, 61 FR 28275, June 4, 1996, the word ``(G-MSC)'' was removed and the word ``(MSC)'' was added in its place.

Subpart 110.30_Testing and Inspection