Code of Federal Regulations (alpha)

CFR /  Title 48  /  Part 1843  /  1843.205-70 NASA contract clauses.

(a)(1) The contracting officer may insert in contracts a clause substantially the same as 1852.243-70, Engineering Change Proposals, when ECPs are expected. Paragraphs (c) and (d) of the basic clause and Alternate I of the clause shall be changed to reflect the specific type of contract.

(1) The contracting officer may insert in contracts a clause substantially the same as 1852.243-70, Engineering Change Proposals, when ECPs are expected. Paragraphs (c) and (d) of the basic clause and Alternate I of the clause shall be changed to reflect the specific type of contract.

(2) If it is desirable to preclude a large number of small-dollar, contractor-initiated engineering changes and to reduce the administrative cost of reviewing them, the contracting officer shall use the clause with its Alternate I.

(3) If the contract is a cost-reimbursement type, the contracting officer shall use the clause with its Alternate II.

(b) The contracting officer may insert a clause substantially as stated at 1852.243-72, Equitable Adjustments, in solicitations and contracts for--

(1) Dismantling, demolishing, or removing improvements; or

(2) Construction, when the contract amount is expected to exceed the simplified acquisition threshold and a fixed-price contract is contemplated. [62 FR 14022, Mar. 25, 1997, as amended at 63 FR 17339, Apr. 9, 1998; 66 FR 53548, Oct. 23, 2001]

Subpart 1843.71_Shared Savings