Code of Federal Regulations (alpha)

CFR /  Title 7  /  Part 1450  /  Sec. 1450.103 Eligible material that qualifies for payment.

(a) Except for paragraph (b) of this section, in order to qualify, as determined by CCC, for a payment under this subpart:

(1) Eligible material must be renewable biomass that, at a minimum, meets the definition in Sec. 1450.2 and is listed on the official Web site for BCAP as an eligible material at http://www.fsa.usda.gov/energy;

(2) Eligible material must be collected or harvested by the eligible material owner:

(i) Directly from:

(A) National Forest System land, Bureau of Land Management land;

(B) Non-Federal land; or

(C) Land belonging to an Indian or Indian tribe that is held in trust by the United States or subject to a restriction against alienation imposed by the United States;

(ii) Consistent with a conservation plan, forest stewardship plan, or plan that CCC determined to be an equivalent plan, that provides the following:

(A) The purpose of the harvest of the eligible material;

(B) The expected volume of the harvest;

(C) The total number of acres to be harvested;

(D) The name of the eligible material owner(s); and

(E) Any additional information, as determined by CCC; and

(iii) Consistent with Executive Order 13112, ``Invasive Species. ''

(3) Woody eligible material produced on land other than contract acreage must be:

(i) Byproducts of preventative treatments that are removed to reduce hazardous fuels, to reduce or contain disease or insect infestation, or to restore ecosystem health; and

(ii) If harvested from Federal lands then done so in accordance with the requirements for old-growth maintenance, restoration, and management direction provided by 16 U.S.C. 6512 for Federal lands; and

(4) Eligible material must be delivered to a qualified biomass conversion facility (as specified in Sec. 1450.101 and other provisions of these regulations).

(b) Notwithstanding paragraph (a) of this section, payments under this subpart are not authorized for:

(1) Any eligible material delivered before October 27, 2010;

(2) Any eligible material for which payment from a biomass conversion facility was received before the application for payment under this subpart is received and approved by the FSA county office, as specified in Sec. 1450.104;

(3) Any woody eligible material collected or harvested outside contract acreage that would otherwise be used for higher-value products; or

(4) Any otherwise eligible material collected or harvested outside contract acreage that, after delivery to a biomass conversion facility, its campus, or its affiliated facilities, must be separated from an eligible material used for a higher-value market product in order to be used for heat, power, biobased products, or advanced biofuels.