CFR /  Title 7  /  Part 1794  /  Sec. 1794.50 Normal sequence.

For proposed actions covered by Sec. 1794.24 and other actions determined by the Administrator to require an EA with scoping, RUS and the applicant will follow the same procedures for scoping and the requirements for notices and documents as for proposed actions normally requiring an EIS through the point where project scoping has been completed. Following project scoping, RUS will make a judgment to have an EA prepared or contract for the preparation of an EIS. [68 FR 45159, Aug. 1, 2003]