CFR /  Title 7  /  Part 4280  /  Sec. 4280.172 Application eligibility provisions.

(a) Applications for industry-level feasibility studies, also known as feasibility study templates or guides, are not eligible because the assistance is not provided to a specific project.

(b) Applications must be from the prospective owner(s) of the renewable energy system for which the feasibility study grant is sought. Applications from other entities (e.g., entities that would be conducting the feasibility study and are not the prospective owners) will not be accepted.

(c) Applications can be submitted for a modification to an existing renewable energy system (e.g., for the expansion portion of an existing wind farm).

(d) Applications cannot be submitted in a Fiscal Year for an RES project if an RES application for the same renewable energy system is submitted in that same Fiscal Year and vice versa.