Code of Federal Regulations (alpha)

CFR /  Title 7  /  Part 4280  /  Sec. 4280.200 OMB control number.

The information collection requirements contained in this subpart have been approved by the Office of Management and Budget (OMB) and have been assigned OMB control number 0570-0067. A person is not required to respond to a collection of information unless it displays a currently valid OMB control number.? Sec. Appendix A to Subpart B of Part 4280--Technical Reports for Energy

Efficiency Improvement (EEI) Projects

For all EEI projects with Total Project Costs of more than $80,000, provide the information specified in Sections A and D and in Section B or Section C, as applicable. If the application is for an EEI project with Total Project Costs of $80,000 or less, please see Sec. 4280.119(b)(3) for the technical report information to be submitted with your application.

If the application is for an EEI project with Total Project Costs of $200,000 and greater, you must conduct an Energy Audit. However, if the application is for an EEI project with a Total Project Costs of less than $200,000, you may conduct either an Energy Assessment or an Energy Audit.

Section A--Project Information. Describe how all the improvements to or replacement of an existing building and/or equipment meet the requirements of being Commercially Available. Describe how the design, engineering, testing, and monitoring are sufficient to demonstrate that the proposed project will meet its intended purpose, ensure public safety, and comply with applicable laws, regulations, agreements, permits, codes, and standards. Describe how all equipment required for the EEI(s) is available and able to be procured and delivered within the proposed project development schedule. In addition, present information regarding component warranties and the availability of spare parts.

Section B--Energy audit. If conducting an EA, provide the following information.

(1) Situation report. Provide a narrative description of the existing building and/or equipment, its energy system(s) and usage, and activity profile. Also include average price per unit of energy (electricity, natural gas, propane, fuel oil, renewable energy, etc.) paid by the customer for the most recent 12 months, or an average of 2, 3, 4, or 5 years, for the building and equipment being audited. Any energy conversion should be based on use rather than source.

(2) Potential improvement description. Provide a narrative summary of the potential improvement and its ability to reduce energy consumption or improve energy efficiency, including a discussion of reliability and durability of the improvements.

(i) Provide preliminary specifications for critical components.

(ii) Provide preliminary drawings of project layout, including any related structural changes.

(iii) Identify significant changes in future related operations and maintenance costs.

(iv) Describe explicitly how outcomes will be measured.

(3) Technical analysis. Give consideration to the interactions among the potential improvements and the current energy system(s).

(i) For the most recent 12 months, or an average of 2, 3, 4, or 5 years, prior to the date the application is submitted, provide both the total amount and the total cost of energy used for the original building and/or equipment, as applicable, for each improvement identified in the potential project. In addition, provide for each improvement identified in the potential project an estimate of the total amount of energy that would have been used and the total cost that would have been incurred if the proposed project were in operation for this same time period.

(ii) Calculate all direct and attendant indirect costs of each improvement;

(iii) Rank potential improvements measures by cost-effectiveness; and

(iv) Provide an estimate of Simple Payback, including all calculations, documentation, and any assumptions.

(4) Qualifications of the auditor. Provide the qualifications of the individual or entity which completed the Energy Audit.

Section C--Energy Assessment. If conducting an Energy Assessment, provide the following information.

(1) Situation report. Provide a narrative description of the existing building and/or equipment, its energy system(s) and usage, and activity profile. Also include average price per unit of energy (electricity, natural gas, propane, fuel oil, renewable energy, etc.) paid by the customer for the most recent 12 months, or an average of 2, 3, 4, or 5 years, for the building and equipment being evaluated. Any energy conversion shall be based on use rather than source.

(2) Potential improvement description. Provide a narrative summary of the potential improvement and its ability to reduce energy consumption or improve energy efficiency.

(3) Technical analysis. Giving consideration to the interactions among the potential improvements and the current energy system(s), provide the information specified in paragraphs C.(3)(i) through (iii) of this appendix.

(i) For the most recent 12 months, or an average of 2, 3, 4, or 5 years, prior to the date the application is submitted, provide both the total amount and the total cost of energy used for the original building and/or equipment, as applicable, for each improvement identified in the potential project. In addition, provide for each improvement identified in the potential project an estimate of the total amount of energy that would have been used and the total cost that would have been incurred if the proposed project were in operation for this same time period.

(ii) Document baseline data compared to projected consumption, together with any explanatory notes on source of the projected consumption data. When appropriate, show before-and-after data in terms of consumption per unit of production, time, or area.

(iii) Provide an estimate of Simple Payback, including all calculations, documentation, and any assumptions.?

(4) Qualifications of the assessor. Provide the qualifications of the individual or entity that completed the assessment. If the Energy Assessment for a project with Total Project Costs of $80,000 or less is not conducted by Energy Auditor or Energy Assessor, then the individual or entity must have at least 3 years of experience and completed at least five Energy Assessments or Energy Audits on similar type projects.

Section D--Qualifications. Provide a resume or other evidence of the contractor or installer's qualifications and experience with the proposed EEI technology. Any contractor or installer with less than 2 years of experience may be required to provide additional information in order for the Agency to determine if they are qualified installer/contractor.

Sec. Appendix B to Subpart B of Part 4280--Technical Reports for Renewable Energy System (RES) Projects With Total Project Costs of Less

Than $200,000, but More Than $80,000

Provide the information specified in Sections A through D for each technical report prepared under this appendix. A Renewable Energy Site Assessment may be used in lieu of Sections A through C if the Renewable Energy Site Assessment contains the information requested in Sections A through C. In such instances, the technical report would consist of Section D and the Renewable Energy Site Assessment.

Note: If the Total Project Cost for the RES project is $80,000 or less, this appendix does not apply. Instead, for such projects, please provide the information specified in Sec. 4280.119(b)(4).

Section A--Project Description. Provide a description of the project, including its intended purpose and a summary of how the project will be constructed and installed. Describe how the system meets the definition of Commercially Available. Identify the project's location and describe the project site.

Section B--Resource Assessment. Describe the quality and availability of the renewable resource to the project. Identify the amount of Renewable Energy generated that will be generated once the proposed project is operating at its steady state operating level. If applicable, also identify the percentage of energy being replaced by the system.

If the application is for a Bioenergy Project, provide documentation that demonstrates that any and all woody biomass feedstock from National Forest System land or public lands cannot be used as a higher value wood-based product.

Section C--Project Economic Assessment. Describe the projected financial performance of the proposed project. The description must address Total Project Costs, energy savings, and revenues, including applicable investment and other production incentives accruing from Government entities. Revenues to be considered shall accrue from the sale of energy, offset or savings in energy costs, and byproducts. Provide an estimate of Simple Payback, including all calculations, documentation, and any assumptions.

Section D--Project Construction and Equipment Information. Describe how the design, engineering, testing, and monitoring are sufficient to demonstrate that the proposed project will meet its intended purpose, ensure public safety, and comply with applicable laws, regulations, agreements, permits, codes, and standards. Describe how all equipment required for the RES is available and able to be procured and delivered within the proposed project development schedule. In addition, present information regarding component warranties and the availability of spare parts.

Section E--Qualifications of Key Service Providers. Describe the key service providers, including the number of similar systems installed and/or manufactured, professional credentials, licenses, and relevant experience. When specific numbers are not available for similar systems, estimations will be acceptable.

Sec. Appendix C to Subpart B of Part 4280--Technical Reports for

Renewable Energy System (RES) Projects With Total Project Costs of

$200,000 and Greater

Provide the information specified in Sections A through G for each technical report prepared under this appendix. Provide the resource assessment under Section C that is applicable to the project.

Section A--Qualifications of the Project Team. Describe the project team, their professional credentials, and relevant experience. The description shall support that the project team key service providers have the necessary professional credentials, licenses, certifications, and relevant experience to develop the proposed project.

Section B--Agreements and Permits. Describe the necessary agreements and permits (including any for local zoning requirements) required for the project and the anticipated schedule for securing those agreements and permits. For example, Interconnection Agreements and Power Purchase Agreements are necessary for all Renewable Energy projects electrically interconnected to the utility grid.?

Section C--Resource Assessment. Describe the quality and availability of the renewable resource and the amount of Renewable Energy generated through the deployment of the proposed system. For all Bioenergy Projects, except Anaerobic Digesters Projects, complete Section C.3 of this appendix. For Anaerobic Digester Projects, complete Section C.6 of this appendix.

1. Wind. Provide adequate and appropriate data to demonstrate the amount of renewable resource available. Indicate the source of the wind data and the conditions of the wind monitoring when collected at the site or assumptions made when applying nearby wind data to the site.

2. Solar. Provide adequate and appropriate data to demonstrate the amount of renewable resource available. Indicate the source of the solar data and assumptions.

3. Bioenergy Project. Provide adequate and appropriate data to demonstrate the amount of renewable resource available. Indicate the type, quantity, quality, and seasonality of the Renewable Biomass resource, including harvest and storage, where applicable. Where applicable, also indicate shipping or receiving method and required infrastructure for shipping. For proposed projects with an established resource, provide a summary of the resource. Document that any and all woody biomass feedstock from National Forest System land or public lands cannot be used as a higher value wood-based product.

4. Geothermal Electric Generation. Provide adequate and appropriate data to demonstrate the amount of renewable resource available. Indicate the quality of the geothermal resource, including temperature, flow, and sustainability and what conversion system is to be installed. Describe any special handling of cooled geothermal waters that may be necessary. Describe the process for determining the geothermal resource, including measurement setup for the collection of the geothermal resource data. For proposed projects with an established resource, provide a summary of the resource and the specifications of the measurement setup.

5. Geothermal Direct Generation. Provide adequate and appropriate data to demonstrate the amount of renewable resource available. Indicate the quality of the geothermal resource, including temperature, flow, and sustainability and what direct use system is to be installed. Describe any special handling of cooled geothermal waters that may be necessary. Describe the process for determining the geothermal resource, including measurement setup for the collection of the geothermal resource data. For proposed projects with an established resource, provide a summary of the resource and the specifications of the measurement setup.

6. Anaerobic Digester Project. Provide adequate and appropriate data to demonstrate the amount of renewable resource available. Indicate the substrates used as digester inputs, including animal wastes or other Renewable Biomass in terms of type, quantity, seasonality, and frequency of collection. Describe any special handling of feedstock that may be necessary. Describe the process for determining the feedstock resource. Provide either tabular values or laboratory analysis of representative samples that include biodegradability studies to produce gas production estimates for the project on daily, monthly, and seasonal basis.

7. Hydrogen Project. Provide adequate and appropriate data to demonstrate the amount of renewable resource available. Indicate the type, quantity, quality, and seasonality of the Renewable Biomass resource. For solar, wind, or geothermal sources of energy used to generate hydrogen, indicate the renewable resource where the hydrogen system is to be installed. Local resource maps may be used as an acceptable preliminary source of renewable resource data. For proposed projects with an established renewable resource, provide a summary of the resource.

8. Hydroelectric/Ocean Energy Projects. Provide adequate and appropriate data to demonstrate the amount of renewable resource available. Indicate the quality of the resource, including temperature (if applicable), flow, and sustainability of the resource, including a summary of the resource evaluation process and the specifications of the measurement setup and the date and duration of the evaluation process and proximity to the proposed site. If less than 1 year of data is used, a Qualified Consultant must provide a detailed analysis of the correlation between the site data and a nearby, long-term measurement site.

Section D--Design and Engineering. Describe the intended purpose of the project and the design, engineering, testing, and monitoring needed for the proposed project. The description shall support that the system will be designed, engineered, tested, and monitored so as to meet its intended purpose, ensure public safety, and comply with applicable laws, regulations, agreements, permits, codes, and standards. In addition, identify that all major equipment is Commercially Available, including proprietary equipment, and justify how this unique equipment is needed to meet the requirements of the proposed design. In addition, information regarding component warranties and the availability of spare parts must be presented.

Section E--Project Development. Describe the overall project development method, including the key project development activities and the proposed schedule, including proposed dates for each activity. The description shall identify each significant historical and projected activity, its beginning and end, and its relationship to the time needed to initiate and carry the activity through to successful project completion. The description shall address Applicant project development cash flow requirements. Details for equipment procurement and installation shall be addressed in Section F of this appendix.

Section F--Equipment Procurement and Installation. Describe the availability of the equipment required by the system. The description shall support that the required equipment is available and can be procured and delivered within the proposed project development schedule. Describe the plan for site development and system installation, including any special equipment requirements. In all cases, the system or improvement shall be installed in conformance with manufacturer's specifications and design requirements, and comply with applicable laws, regulations, agreements, permits, codes, and standards.

Section G--Operations and Maintenance. Describe the operations and maintenance requirements of the system, including major rebuilds and component replacements necessary for the system to operate as designed over its useful life. The warranty must cover and provide protection against both breakdown and a degradation of performance. The performance of the RES or EEI shall be monitored and recorded as appropriate to the specific technology. Subpart C [Reserved]