|
Section 816.1
|
Objectives |
|
Section 816.2
|
Information collection |
|
Section 816.10
|
Signs and markers |
|
Section 816.11
|
Casing and sealing of drilled holes: General requirements |
|
Section 816.13
|
Casing and sealing of drilled holes: Temporary |
|
Section 816.14
|
Casing and sealing of drilled holes: Permanent |
|
Section 816.15
|
Topsoil and subsoil |
|
Section 816.22
|
Hydrologic-balance protection |
|
Section 816.41
|
Hydrologic balance: Water quality standards and effluent limitations |
|
Section 816.42
|
Diversions |
|
Section 816.43
|
Hydrologic balance: Sediment control measures |
|
Section 816.45
|
Hydrologic balance: Siltation structures |
|
Section 816.46
|
Hydrologic balance: Discharge structures |
|
Section 816.47
|
Impoundments |
|
Section 816.49
|
Postmining rehabilitation of sedimentation ponds, diversions, impoundments, and treatment facilities |
|
Section 816.56
|
Hydrologic balance: Stream buffer zones |
|
Section 816.57
|
Coal recovery |
|
Section 816.59
|
Use of explosives: General requirements |
|
Section 816.61
|
Use of explosives: Preblasting survey |
|
Section 816.62
|
Use of explosives: Blasting schedule |
|
Section 816.64
|
Use of explosives: Blasting signs, warnings, and access control |
|
Section 816.66
|
Use of explosives: Control of adverse effects |
|
Section 816.67
|
Use of explosives: Records of blasting operations |
|
Section 816.68
|
Disposal of excess spoil: General requirements |
|
Section 816.71
|
Disposal of excess spoil: Valley fills/head-of-hollow fills |
|
Section 816.72
|
Disposal of excess spoil: Durable rock fills |
|
Section 816.73
|
Disposal of excess spoil: Preexisting benches |
|
Section 816.74
|
Protection of underground mining |
|
Section 816.79
|
Coal mine waste: General requirements |
|
Section 816.81
|
Coal mine waste: Refuse piles |
|
Section 816.83
|
Coal mine waste: Impounding structures |
|
Section 816.84
|
Coal mine waste: Burning and burned waste utilization |
|
Section 816.87
|
Disposal of noncoal mine wastes |
|
Section 816.89
|
Stabilization of surface areas |
|
Section 816.95
|
Protection of fish, wildlife, and related environmental values |
|
Section 816.97
|
Slides and other damage |
|
Section 816.99
|
Contemporaneous reclamation |
|
Section 816.100
|
Backfilling and grading: Time and distance requirements |
|
Section 816.101
|
Backfilling and grading: General requirements |
|
Section 816.102
|
Backfilling and grading: Thin overburden |
|
Section 816.104
|
Backfilling and grading: Thick overburden |
|
Section 816.105
|
Backfilling and grading: Previously mined areas |
|
Section 816.106
|
Backfilling and grading: Steep slopes |
|
Section 816.107
|
Revegetation: General requirements |
|
Section 816.111
|
Revegetation: Timing |
|
Section 816.113
|
Revegetation: Mulching and other soil stabilizing practices |
|
Section 816.114
|
Revegetation: Standards for success |
|
Section 816.116
|
Cessation of operations: Temporary |
|
Section 816.131
|
Cessation of operations: Permanent |
|
Section 816.132
|
Postmining land use |
|
Section 816.133
|
Roads: general |
|
Section 816.150
|
Primary roads |
|
Section 816.151
|
Utility installations |
|
Section 816.180
|
Support facilities |
|
Section 816.181
|
Interpretative rules related to general performance standards |
|
Section 816.200
|
Scope |