Section 155.100
|
Definitions |
Section 155.110
|
Equivalents |
Section 155.120
|
Exemptions |
Section 155.130
|
Incorporation by reference |
Section 155.140
|
Definitions |
Section 155.200
|
Discharge removal equipment for vessels 400 feet or greater in length |
Section 155.205
|
Discharge removal equipment for vessels less than 400 feet in length |
Section 155.210
|
Discharge removal equipment for inland oil barges |
Section 155.215
|
Discharge removal equipment for vessels carrying oil as secondary cargo |
Section 155.220
|
Internal cargo transfer capability |
Section 155.225
|
Emergency control systems for tank barges |
Section 155.230
|
Emergency towing capability for oil tankers |
Section 155.235
|
Damage stability information for oil tankers and offshore oil barges |
Section 155.240
|
Damage stability information for inland oil barges |
Section 155.245
|
Oil fuel tank protection |
Section 155.250
|
Containment of oil and hazardous material cargo discharges |
Section 155.310
|
Fuel oil and bulk lubricating oil discharge containment |
Section 155.320
|
Oily mixture (bilge slops)/fuel oil tank ballast water discharges on U |
Section 155.330
|
Oily mixture (bilge slops)/fuel oil tank ballast water discharges on oceangoing ships of less than 400 gross tons |
Section 155.350
|
Oily mixture (bilge slops) discharges on oceangoing ships of 400 gross tons and above but less than 10,000 gross tons, excluding |
Section 155.360
|
Oily mixture (bilge slops)/fuel oil tank ballast water discharges on oceangoing ships of 10,000 gross tons and above and |
Section 155.370
|
Oily water separating equipment and bilge alarm approval standards |
Section 155.380
|
Platform machinery space drainage on oceangoing fixed and floating drilling rigs and other platforms |
Section 155.400
|
Pumping, piping and discharge requirements for non-oceangoing ships of 100 gross tons and above |
Section 155.410
|
Pumping, piping and discharge requirements for oceangoing ships of 100 gross tons and above but less than 400 gross tons |
Section 155.420
|
Standard discharge connections for oceangoing ships of 400 gross tons and above |
Section 155.430
|
Segregation of fuel oil and ballast water on new oceangoing ships of 4,000 gross tons and above, other than oil tankers, and on new |
Section 155.440
|
Placard |
Section 155.450
|
Prohibited spaces |
Section 155.470
|
Overfill devices |
Section 155.480
|
Designation of person in charge |
Section 155.700
|
Qualifications of person in charge |
Section 155.710
|
Contents of letter of designation as a person-in-charge of the transfer of fuel oil |
Section 155.715
|
Transfer procedures |
Section 155.720
|
Compliance with transfer procedures |
Section 155.730
|
Availability of transfer procedures |
Section 155.740
|
Contents of transfer procedures |
Section 155.750
|
Amendment of transfer procedures |
Section 155.760
|
Draining into bilges |
Section 155.770
|
Maximum cargo level of oil |
Section 155.775
|
Emergency shutdown |
Section 155.780
|
Communications |
Section 155.785
|
Deck lighting |
Section 155.790
|
Transfer hose |
Section 155.800
|
Closure devices |
Section 155.805
|
Tank vessel security |
Section 155.810
|
Tank vessel integrity |
Section 155.815
|
Records |
Section 155.820
|
Purpose |
Section 155.1010
|
Applicability |
Section 155.1015
|
Definitions |
Section 155.1020
|
Operating restrictions and interim operating authorization |
Section 155.1025
|
Qualified individual and alternate qualified individual |
Section 155.1026
|
General response plan requirements |
Section 155.1030
|
Response plan requirements for manned vessels carrying oil as a primary cargo |
Section 155.1035
|
Response plan requirements for unmanned tank barges carrying oil as a primary cargo |
Section 155.1040
|
Response plan requirements for vessels carrying oil as a secondary cargo |
Section 155.1045
|
Response plan development and evaluation criteria for vessels carrying groups I through IV petroleum oil as a primary cargo |
Section 155.1050
|
Response plan development and evaluation criteria for vessels carrying group V petroleum oil as a primary cargo |
Section 155.1052
|
Training |
Section 155.1055
|
Exercises |
Section 155.1060
|
Inspection and maintenance of response resources |
Section 155.1062
|
Procedures for plan submission, approval, requests for acceptance of alternative planning criteria, and appeal |
Section 155.1065
|
Procedures for plan review, revision, amendment, and appeal |
Section 155.1070
|
Purpose and applicability |
Section 155.1110
|
Definitions |
Section 155.1115
|
Operating restrictions and interim operating authorization |
Section 155.1120
|
Additional response plan requirements |
Section 155.1125
|
Requirements for prepositioned response equipment |
Section 155.1130
|
Response plan development and evaluation criteria |
Section 155.1135
|
Submission and approval procedures |
Section 155.1145
|
Plan revision and amendment procedures |
Section 155.1150
|
Purpose and applicability |
Section 155.1210
|
Response plan submission requirements |
Section 155.1225
|
Response plan development and evaluation criteria |
Section 155.1230
|
Purpose and applicability |
Section 155.2210
|
Response plan submission requirements |
Section 155.2225
|
Response plan development and evaluation criteria |
Section 155.2230
|
Purpose of this subpart |
Section 155.4010
|
Vessel owners and operators who must follow this subpart |
Section 155.4015
|
Complying with this subpart |
Section 155.4020
|
Definitions |
Section 155.4025
|
Required salvage and marine firefighting services to list in response plans |
Section 155.4030
|
Required pre-incident information and arrangements for the salvage and marine firefighting resource providers listed in response |
Section 155.4035
|
Response times for each salvage and marine firefighting service |
Section 155.4040
|
Required agreements or contracts with the salvage and marine firefighting resource providers |
Section 155.4045
|
Ensuring that the salvors and marine firefighters are adequate |
Section 155.4050
|
Drills and exercises |
Section 155.4052
|
Temporary waivers from meeting one or more of the specified response times |
Section 155.4055
|
Purpose |
Section 155.5010
|
Deviation from response plan |
Section 155.5012
|
Applicability |
Section 155.5015
|
Definitions |
Section 155.5020
|
Operating restrictions |
Section 155.5021
|
Interim operating authorization |
Section 155.5023
|
One-time port waiver |
Section 155.5025
|
Qualified individual and alternate qualified individual |
Section 155.5026
|
Nontank vessel response plan requirements: General content |
Section 155.5030
|
Nontank vessel response plan requirements: Specific content |
Section 155.5035
|
Response plan development and evaluation criteria for nontank vessels carrying groups I through IV petroleum oil |
Section 155.5050
|
Response plan development and evaluation criteria for nontank vessels carrying group V petroleum oil |
Section 155.5052
|
Training |
Section 155.5055
|
Exercises |
Section 155.5060
|
Alternative Training and Exercise Program |
Section 155.5061
|
Inspection and maintenance of response resources |
Section 155.5062
|
Procedures for plan submission and approval |
Section 155.5065
|
Alternative planning criteria |
Section 155.5067
|
Procedures for plan review, revision, and amendment |
Section 155.5070
|
Appeal procedures |
Section 155.5075
|
Applicability |