CFR /  Title 10  /  Part 170  /  Sec. 170.21 Schedule of fees for production and utilization facilities,inspections and import and export licenses.

Applicants for construction permits, manufacturing licenses, operating licenses, import and export licenses, approvals of facility standard reference designs, re-qualification and replacement examinations for reactor operators, and special projects and holders of construction permits, licenses, and other approvals shall pay fees for the following categories of services:

Schedule of Facility Fees

[See footnotes at end of table]------------------------------------------------------------------------

Facility categories and type of fees Fees \1 2\------------------------------------------------------------------------A. Nuclear Power Reactors:

Application for Construction Permit........ Full Cost.

Early Site Permit, Construction Permit, Full Cost.

Combined License, Operating License.

Amendment, Renewal, Dismantling- Full Cost.

Decommissioning and Termination, Other

Approvals.

Inspections \3\............................ Full Cost.B. Standard Reference Design Review:

Preliminary Design Approvals, Final Design Full Cost.

Approvals, Certification.

Amendment, Renewal, Other Approvals........ Full Cost.C. Test Facility/Research Reactor/Critical

Facility:

Application for Construction Permit........ Full Cost.

Construction Permit, Operating License..... Full Cost.

Amendment, Renewal, Dismantling- Full Cost.

Decommissioning and Termination, Other

Approvals.

Inspections \3\............................ Full Cost.D. Manufacturing License:

Application for Construction............... Full Cost.

Preliminary Design Approval, Final Design Full Cost.

Approval.

Amendment Renewal, Other Approvals......... Full Cost.

Inspections \3\............................ Full Cost.E. [Reserved]F. [Reserved]G. Other Production or Utilization Facility:

Application for Construction Permit........ Full Cost.

Construction Permit, Operating License..... Full Cost.

Amendment, Renewal, Other Approvals........ Full Cost.

Inspections \3\............................ Full Cost.H. Production or Utilization Facility

Permanently Closed Down:

Inspections \3\............................ Full Cost.I. Part 55 Reviews:

Requalification and Replacement Full Cost.

Examinations for Reactors Operators.J. Special Projects:

Approvals and preapplication/licensing Full Cost.

activities.

Inspections \3\............................ Full Cost.

Contested hearings on licensing actions Full Cost.

directly related to U.S. Government

national security initiatives.K. Import and export licenses:

Licenses for the import and export only of

production or utilization facilities or

the export only of components for

production or utilization facilities

issued under 10 CFR part 110.

1. Application for import or export of

production or utilization facilities \4\

(including reactors and other facilities)

and exports of components requiring

Commission and Executive Branch review,

for example, actions under 10 CFR

110.40(b).

Application--new license, or amendment; $18,200

or license exemption request.

2. Application for export of reactor and

other components requiring Executive

Branch review, for example, those actions

under 10 CFR 110.41(a).

Application--new license, or amendment; $9,800

or license exemption request.

3. Application for export of components

requiring the assistance of the Executive

Branch to obtain foreign government

assurances.

Application--new license, or amendment; $4,500

or license exemption request.

4. Application for export of facility

components and equipment not requiring

Commission or Executive Branch review, or

obtaining foreign government assurances.

Application--new license, or amendment; $3,400

or license exemption request.

5. Minor amendment of any active export or

import license, for example, to extend the

expiration date, change domestic

information, or make other revisions which

do not involve any substantive changes to

license terms or conditions or to the type

of facility or component authorized for

export and, therefore, do not require in-

depth analysis or review or consultation

with the Executive Branch, U.S. host

state, or foreign government authorities.

Minor amendment to license............. $1,400------------------------------------------------------------------------\1\ Fees will not be charged for orders related to civil penalties or

other civil sanctions issued by the Commission under Sec. 2.202 of

this chapter or for amendments resulting specifically from the

requirements of these orders. For orders unrelated to civil penalties

or other civil sanctions, fees will be charged for any resulting

licensee-specific activities not otherwise exempted from fees under

this chapter. Fees will be charged for approvals issued under a

specific exemption provision of the Commission's regulations under

Title 10 of the Code of Federal Regulations (e.g., 10 CFR 50.12, 10

CFR 73.5) and any other sections in effect now or in the future,

regardless of whether the approval is in the form of a license

amendment, letter of approval, safety evaluation report, or other

form.\2\ Full cost fees will be determined based on the professional staff

time and appropriate contractual support services expended. For

applications currently on file and for which fees are determined based

on the full cost expended for the review, the professional staff hours

expended for the review of the application up to the effective date of

the final rule will be determined at the professional rates in effect

when the service was provided.\3\ Inspections covered by this schedule are both routine and non-

routine safety and safeguards inspections performed by NRC for the

purpose of review or follow-up of a licensed program. Inspections are

performed through the full term of the license to ensure that the

authorized activities are being conducted in accordance with the

Atomic Energy Act of 1954, as amended, other legislation, Commission

regulations or orders, and the terms and conditions of the license.

Non-routine inspections that result from third-party allegations will

not be subject to fees.\4\ Imports only of major components for end-use at NRC-licensed

reactors are authorized under NRC general import license in 10 CFR

110.27. [53 FR 52648, Dec. 29, 1988]

Editorial Note: For Federal Register citations affecting Sec. 170.21, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.fdsys.gov.