Applicants for construction permits, manufacturing licenses, operating licenses, import and export licenses, approvals of facility standard reference designs, re-qualification and replacement examinations for reactor operators, and special projects and holders of construction permits, licenses, and other approvals shall pay fees for the following categories of services:
Schedule of Facility Fees
[See footnotes at end of table]------------------------------------------------------------------------
Facility categories and type of fees Fees \1 2\------------------------------------------------------------------------A. Nuclear Power Reactors:
Application for Construction Permit........ Full Cost.
Early Site Permit, Construction Permit, Full Cost.
Combined License, Operating License.
Amendment, Renewal, Dismantling- Full Cost.
Decommissioning and Termination, Other
Approvals.
Inspections \3\............................ Full Cost.B. Standard Reference Design Review:
Preliminary Design Approvals, Final Design Full Cost.
Approvals, Certification.
Amendment, Renewal, Other Approvals........ Full Cost.C. Test Facility/Research Reactor/Critical
Facility:
Application for Construction Permit........ Full Cost.
Construction Permit, Operating License..... Full Cost.
Amendment, Renewal, Dismantling- Full Cost.
Decommissioning and Termination, Other
Approvals.
Inspections \3\............................ Full Cost.D. Manufacturing License:
Application for Construction............... Full Cost.
Preliminary Design Approval, Final Design Full Cost.
Approval.
Amendment Renewal, Other Approvals......... Full Cost.
Inspections \3\............................ Full Cost.E. [Reserved]F. [Reserved]G. Other Production or Utilization Facility:
Application for Construction Permit........ Full Cost.
Construction Permit, Operating License..... Full Cost.
Amendment, Renewal, Other Approvals........ Full Cost.
Inspections \3\............................ Full Cost.H. Production or Utilization Facility
Permanently Closed Down:
Inspections \3\............................ Full Cost.I. Part 55 Reviews:
Requalification and Replacement Full Cost.
Examinations for Reactors Operators.J. Special Projects:
Approvals and preapplication/licensing Full Cost.
activities.
Inspections \3\............................ Full Cost.
Contested hearings on licensing actions Full Cost.
directly related to U.S. Government
national security initiatives.K. Import and export licenses:
Licenses for the import and export only of
production or utilization facilities or
the export only of components for
production or utilization facilities
issued under 10 CFR part 110.
1. Application for import or export of
production or utilization facilities \4\
(including reactors and other facilities)
and exports of components requiring
Commission and Executive Branch review,
for example, actions under 10 CFR
110.40(b).
Application--new license, or amendment; $18,200
or license exemption request.
2. Application for export of reactor and
other components requiring Executive
Branch review, for example, those actions
under 10 CFR 110.41(a).
Application--new license, or amendment; $9,800
or license exemption request.
3. Application for export of components
requiring the assistance of the Executive
Branch to obtain foreign government
assurances.
Application--new license, or amendment; $4,500
or license exemption request.
4. Application for export of facility
components and equipment not requiring
Commission or Executive Branch review, or
obtaining foreign government assurances.
Application--new license, or amendment; $3,400
or license exemption request.
5. Minor amendment of any active export or
import license, for example, to extend the
expiration date, change domestic
information, or make other revisions which
do not involve any substantive changes to
license terms or conditions or to the type
of facility or component authorized for
export and, therefore, do not require in-
depth analysis or review or consultation
with the Executive Branch, U.S. host
state, or foreign government authorities.
Minor amendment to license............. $1,400------------------------------------------------------------------------\1\ Fees will not be charged for orders related to civil penalties or
other civil sanctions issued by the Commission under Sec. 2.202 of
this chapter or for amendments resulting specifically from the
requirements of these orders. For orders unrelated to civil penalties
or other civil sanctions, fees will be charged for any resulting
licensee-specific activities not otherwise exempted from fees under
this chapter. Fees will be charged for approvals issued under a
specific exemption provision of the Commission's regulations under
Title 10 of the Code of Federal Regulations (e.g., 10 CFR 50.12, 10
CFR 73.5) and any other sections in effect now or in the future,
regardless of whether the approval is in the form of a license
amendment, letter of approval, safety evaluation report, or other
form.\2\ Full cost fees will be determined based on the professional staff
time and appropriate contractual support services expended. For
applications currently on file and for which fees are determined based
on the full cost expended for the review, the professional staff hours
expended for the review of the application up to the effective date of
the final rule will be determined at the professional rates in effect
when the service was provided.\3\ Inspections covered by this schedule are both routine and non-
routine safety and safeguards inspections performed by NRC for the
purpose of review or follow-up of a licensed program. Inspections are
performed through the full term of the license to ensure that the
authorized activities are being conducted in accordance with the
Atomic Energy Act of 1954, as amended, other legislation, Commission
regulations or orders, and the terms and conditions of the license.
Non-routine inspections that result from third-party allegations will
not be subject to fees.\4\ Imports only of major components for end-use at NRC-licensed
reactors are authorized under NRC general import license in 10 CFR
110.27. [53 FR 52648, Dec. 29, 1988]