Code of Federal Regulations (alpha)

CFR /  Title 10  /  Part 602  /  Sec. 602.19 Records and data.

(a) In some cases, DOE will require submission of certain project records or data to facilitate mission-related activities. Recipients, therefore, must take adequate steps to ensure proper management, control, and preservation of all project records and data.

(b) Awardees must ensure that all project data is adequately documented. Documentation shall:

(1) Reference software used to compile, manage, and analyze data;

(2) Define all technical characteristics necessary for reading or processing the records;

(3) Define file and record content and codes;

(4) Describe update cycles or conditions and rules for adding or deleting information; and

(5) Detail instrument calibration effects, sampling and analysis, space and time coverage, quality control measures, data algorithms and reduction methods, and other activities relevant to data collection and assembly.

(c) Recipients agree to comply with designated DOE records and data management requirements, including providing electronic data in prescribed formats and retention of specified records and data for eventual transfer to the Comprehensive Epidemiologic Data Resource or to another repository, as directed by DOE. Recipients will provide, as part of the final report, a description of records and data compiled during the project along with a plan for its preservation or disposition.

(d) Recipients agree to make project records and data available as soon as possible when requested by DOE.

Sec. Appendix A to Part 602--Schedule of Renewal Applications and

Reports ------------------------------------------------------------------------

Number of

copies

Type When due for

awarding

office------------------------------------------------------------------------1. Summary: 200 words on scope and Immediately after a grant 3

purpose (Notice of Energy R&D; is awarded and with each

Project). application for renewal.2. Renewal period ends............ 6 months before the 8

budget.3. Progress Report period (or as 90 days prior to the next 3

part of a renewal application). budget period.4. Other progress reports, brief As deemed appropriate by 3

topical reports, etc. (Designated DOE or the recipient.

when significant results develop

or when work has direct

programmatic impact).5. Reprints, Conference........... Same as 4. above......... 36. Final report of the project.... Within 90 days after 3

completion.

7. Financial Status Report (FSR).. Within 90 days after 3

completion of the

project period; for

budget periods exceeding

12 months an FSR is also

required within 90 days

after the first 12-month

period.------------------------------------------------------------------------Note: Report types 5 and 6 require with submission two copies of DOE

Form 1332.16, University-Type Contractor and Grantee Recommendations

for Disposition of Scientific and Technical Document.