In addition to the requirements of Sec. Sec. 400.21(d)(1)(i) and (ii) pertaining to legal authority, Sec. 400.21(d)(2)(vii) pertaining to environmental aspects of the proposal, and Sec. Sec. 400.21(d)(3)(i) and (iii) pertaining to operation, a grantee's application for subzone designation shall contain the following information:
(a) The name of the operator/user for which subzone designation is sought;
(b) The nature of the activity at the proposed subzone;
(c) The address(es) and physical size (acreage or square feet) of the proposed subzone location(s); and
(d) One or more maps conforming to the requirements of section Sec. 400.21(d)(5)(ii). For any production activity to be conducted at a proposed subzone, the separate requirements of Sec. 400.14(a) must be met.
Effective Date Note: At 77 FR 12139, Feb. 28, 2012, Sec. 400.25 was added. This section contains information collection and recordkeeping requirements and will not become effective until approval has been given by the Office of Management and Budget.