Code of Federal Regulations (alpha)

CFR /  Title 15  /  Part 713  /  Sec. 713.7 Deadlines for submission of Schedule 2 declarations,

Declarations, reports, and amendments required under this part must be postmarked by the appropriate date identified in Supplement No. 2 to this part 713. Required declarations, reports, and amendments include:

(a) Annual declaration on past activities (production, processing, or consumption of Schedule 2 chemicals during the previous calendar year);

(b) Annual report on exports and imports of Schedule 2 chemicals by plant sites, trading companies, and other persons subject to the CWCR (during the previous calendar year);

(c) Combined declaration and report (production, processing, or consumption of Schedule 2 chemicals, as well as exports or imports of the same or different Schedule 2 chemicals, by a declared plant site during the previous calendar year);

(d) Annual declaration on anticipated activities (production, processing or consumption) involving Schedule 2 chemicals during the next calendar year;

(e) Declaration on Additionally Planned Activities (production, processing or consumption) involving Schedule 2 chemicals; and

(f) Amended declaration and report, including combined declaration and report.

Sec. Supplement No. 1 to Part 713--Schedule 2 Chemicals ------------------------------------------------------------------------

(CAS registry

number)------------------------------------------------------------------------A. Toxic chemicals:

(1) Amiton: O,O-Diethyl S-[2-(diethylamino)ethyl] (78-53-5)

phosphorothiolate and corresponding alkylated or

protonated salts..................................

(2) PFIB: 1,1,3,3,3-Pentafluoro-2-(trifluoromethyl)- (382-21-8)

1-propene.........................................

(3) BZ: 3-Quinuclidinyl benzilate.................. (6581-06-2)B. Precursors:

(4) Chemicals, except for those listed in Schedule (676-97-1)

1, containing a phosphorus atom to which is bonded

one methyl, ethyl or propyl (normal or iso) group

but not further carbon atoms, e.g.

Methylphosphonyl dichloride.......................

Dimethyl methylphosphonate..................... (756-79-6)

Exemption: Fonofos: O-Ethyl S-phenyl (944-22-9)

ethylphosphono-thiolothionate.................

(5) N,N-Dialkyl (Me, Et, n-Pr or i-Pr)

phosphoramidic dihalides

(6) Dialkyl (Me, Et, n-Pr or i-Pr) N,N-dialkyl (Me,

Et, n-Pr or i-Pr)-phosphoramidates

(7) Arsenic trichloride............................ (7784-34-1)

(8) 2,2-Diphenyl-2-hydroxyacetic acid.............. (76-93-7)

(9) Quinuclidine-3-ol.............................. (1619-34-7)

(10) N,N-Dialkyl (Me, Et, n-Pr or i-Pr) aminoethyl-

2-chlorides and corresponding protonated salts

(11) N,N-Dialkyl (Me, Et, n-Pr or i-Pr) aminoethane-

2-ols and corresponding protonated salts

Exemptions: N,N-Dimethylaminoethanol and (108-01-0)

corresponding protonated salts................

N,N-Diethylaminoethanol and corresponding (100-37-8)

protonated salts..............................

(12) N,N-Dialkyl (Me, Et, n-Pr or i-Pr) aminoethane-

2-thiols and corresponding protonated salts

(13) Thiodiglycol: Bis(2-hydroxyethyl)sulfide...... (111-48-8)

(14) Pinacolyl alcohol: 3,3-Dimethylbutane-2-ol.... (464-07-3)------------------------------------------------------------------------Notes to Supplement No. 1Note 1: Note that the following Schedule 2 chemicals are controlled for

export purposes by the Directorate of Defense Trade Controls of the

Department of State under the International Traffic in Arms

Regulations (22 CFR parts 120 through 130): Amiton: O,O-Diethyl S-[2-

(diethylamino)ethyl] phosphorothiolate and corresponding alkylated or

protonated salts (78-53-5); BZ: 3-Quinuclidinyl benzilate 6581-06-2);

and Methylphosphonyl dichloride (676-97-1).Note 2: All Schedule 2 chemicals not listed in Note 1 to this Supplement

are controlled for export purposes under the Export Administration

Regulations (see part 774 of the EAR, the Commerce Control List). Sec. Supplement No. 2 to Part 713--Deadlines for Submission of Schedule

2 Declarations, Reports, and Amendments ------------------------------------------------------------------------

Declarations and reports Applicable forms Due dates------------------------------------------------------------------------Annual Declaration on Past Certification, 2- February 28 of the

Activities (previous calendar 1, 2-2, 2-3, 2- year following

year)--Declared plant site 3A, 2-3B (if also any calendar year

(production, processing, or exported or in which the

consumption). imported), A (as production,

appropriate), B processing, or

(optional). consumption of a

Schedule 2

chemical exceeded

the applicable

declaration

thresholds in

Sec.

713.2(a)(1)(i) of

the CWCR.Annual Report on Exports and Certification, 2- February 28 of the

Imports (previous calendar 1, 2-3B, A (as year following

year)--Plant site, trading appropriate), B any calendar year

company, other persons. (optional). in which exports

or imports of a

Schedule 2

chemical by a

plant site,

trading company,

or other person

subject to the

CWCR (as

described in Sec.

713.3(a)(2) of

the CWCR)

exceeded the

applicable

thresholds in

Sec.

713.3(b)(1) of

the CWCR.

Combined Declaration & Report-- Certification, 2- February 28 of the

Declared plant site 1, 2-2, 2-3, 2- year following

(production, processing, or 3A, 2-3B, A (as any calendar year

consumption; exports and appropriate), B in which the

imports). (optional). production,

processing, or

consumption of a

Schedule 2

chemical and the

export or import

of the same or a

different

Schedule 2

chemical by a

declared plant

site exceeded the

applicable

thresholds in

Sec. Sec.

713.2(a)(1)(i)

and 713.3(b)(1),

respectively, of

the CWCR.Annual Declaration on Certification, 2- September 3 of the

Anticipated Activities (next 1, 2-2, 2-3, 2- year prior to any

calendar year). 3A, 2-3C, A (as calendar year in

appropriate), B which Schedule 2

(optional). activities are

anticipated to

occur.Declaration on Additionally Certification, 2- 15 calendar days

Planned Activities (production, 1, 2-2, 2-3, 2- before the

processing and consumption). 3A, 2-3C, A (as additionally

appropriate), B planned activity

(optional). begins.Amended Declaration............. Certification, 2-

1, 2-2, 2-3 2-3A,

2-3B (if also

exported or

imported), A (as

appropriate), B

(optional).

--Declaration information... .................. --15 calendar days

after change in

information.

--Company information....... .................. --30 calendar days

after change in

information.

--Post-inspection letter.... .................. --45 calendar days

after receipt of

letter.Amended Report.................. Certification, 2- --15 calendar days

1, 2-3B, A (as after change in

appropriate), B information.

(optional).Amended Combined Declaration & Certification, 2- --15 calendar days

Report. 1, 2-2, 2-3, 2- after change in

3A, 2-3B, A (as information.

appropriate), B

(optional).------------------------------------------------------------------------