(a) Yes, costs associated with approach roadway work, as defined in Sec. 661.5 are eligible.
(b) Long approach fills, causeways, connecting roadways, interchanges, ramps, and other extensive earth structures, when constructed beyond an attainable touchdown point, are not eligible uses of IRRBP funds.