Code of Federal Regulations (alpha)

CFR /  Title 24  /  Part 3285  /  Sec. 3285.404 Severe climatic conditions.

In frost-susceptible soil locations, ground anchor augers must be installed below the frost line, unless the foundation system is frost-protected to prevent the effects of frost heave, in accordance with acceptable engineering practice and Sec. 3280.306 of this chapter and Sec. 3285.312.