CFR / 
Title 30
 / 
Part 827
 / 
Sec. 827.1 Scope.
This part sets forth requirements for coal preparation plants operated in connection with a coal mine but outside the permit area for a specific mine.
[53 FR 47391, Nov. 22, 1988]