Code of Federal Regulations (alpha)

CFR /  Title 33  /  Part 117  /  Sec. 117.361 Flint River.

The draws of the CSX Transportation Railroad bridges, miles 28.0 and 28.7, both at Bainbridge, shall open on signal if at least 15 days notice is given.