The additional requirements are specified in the following tables:
(a) Table 1--Additional Requirements for Large-Capacity Cesspools
Statewide
[See Sec. 144.85 to determine if these additional requirements apply
to you]------------------------------------------------------------------------
(1) Existing (operational or (i) Must close the April 5, 2005.
under construction by April well.
5, 2000).
(ii) Must notify the At least 30 days
UIC Program prior to closure.
Director (both
Primacy States and
Direct
Implementation
States) of your
intent to close the
well..
Note: This
information is
requested on
national form
``Preclosure
Notification for
Closure of
Injection Wells,''.(2) New or converted Are prohibited...... April 5, 2000.
(construction not started
before April 5, 2000).------------------------------------------------------------------------
(b) Table 2--Additional Requirements for Motor Vehicle Waste Disposal
Wells
[See Sec. 144.85 to determine if these additional requirements apply
to you]------------------------------------------------------------------------
Well status Requirement Deadline------------------------------------------------------------------------If your motor vehicle waste Then. . ............ By. . .
(1) Existing (operational or (i) If your well is Within 1 year of the
under construction by April in a ground water completion of your
5, 2000). protection area, local source water
you must close the assessment; your
well or obtain a UIC Program
permit. Director may extend
the closure
deadline, but not
the permit
application
deadline, for up to
one year if the
most efficient
compliance option
is connection to a
sanitary sewer or
installation of new
treatment
technology.
-------------------------------------------
(ii) If your well is By January 1, 2007;
in an other your UIC Program
sensitive ground Director may extend
water area, you the closure
must close the well deadline, but not
or obtain a permit. the permit
application
deadline, for up to
one year if the
most efficient
compliance option
is connection to a
sanitary sewer or
installation of new
treatment
technology.
-------------------------------------------
(iii) If you plan to The date you submit
seek a waiver from your permit
the ban and apply application.
for a permit, you
must meet MCLs at
the point of
injection while
your permit
application is
under review, if
you choose to keep
operating your well.
-------------------------------------------
(iv) If you receive The date(s)
a permit, you must specified in your
comply with all permit.
permit conditions,
if you choose to
keep operating your
well, including
requirements to
meet MCLs and other
health based
standards at the
point of injection,
follow best
management
practices, and
monitor your
injectate and
sludge quality.
-------------------------------------------
(v) If your well is January 1, 2005
in a State which unless your State
has not completed obtains an
all their local extension as
assessments by described in 144.87
January 1, 2004 or (b) in which case
by the extended your deadline is
date if your State January 1, 2006;
has obtained an your UIC Program
extension as Director may extend
described in the closure
144.87, and you are deadline, but not
outside an area the permit
with a completed application
assessment you must deadline, for up to
close the well or one year if the
obtain a permit. most efficient
compliance option
is connection to a
sanitary sewer or
installation of new
treatment
technology.
-------------------------------------------
(vi) If your well is January 1, 2007
in a State that has unless your State
not delineated obtains an
other sensitive extension as
ground water areas described in
by January 1, 2004 144.87(c) in which
and you are outside case your deadline
of an area with a is January 2008.
completed
assessment you must
close the well or
obtain a permit
regardless of your
location.
-------------------------------------------
(vii) If you plan to At least 30 days
close your well, prior to closure.
you must notify the
UIC Program
Director of your
intent to close the
well (this includes
closing your well
prior to
conversion).
Note: This
information is
requested on
national form
``Preclosure
Notification for
Closure of
Injection Wells''..------------------------------------------------------------------------(2) New or converted Are prohibited...... April 5, 2000.
(construction not started
before April 5, 2000).------------------------------------------------------------------------ [64 FR 68566, Dec. 7, 1999; 64 FR 70316, Dec. 16, 1999]