Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 262  /  Sec. 262.209 Where and when to make the hazardous waste determinationthe laboratory.

(a) Large quantity generators and small quantity generators--an eligible academic entity must ensure that a trained professional makes a hazardous waste determination, pursuant to Sec. 262.11, for unwanted material in any of the following areas:

(1) In the laboratory before the unwanted material is removed from the laboratory, in accordance with Sec. 262.210;

(2) Within 4 calendar days of arriving at an on-site central accumulation area, in accordance with Sec. 262.211; and

(3) Within 4 calendar days of arriving at an on-site interim status or permitted treatment, storage or disposal facility, in accordance with Sec. 262.212.

(b) Conditionally exempt small quantity generators--an eligible academic entity must ensure that a trained professional makes a hazardous waste determination, pursuant to Sec. 262.11, for unwanted material in the laboratory before the unwanted material is removed from the laboratory, in accordance with Sec. 262.210.