(a) Purpose and scope. This section sets forth the applicable State Implementation Plan (SIP) for Arkansas under section 110 of the Clean Air Act, 42 U.S.C. 7410, and 40 CFR part 51 to meet national ambient air quality standards.
(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to December 1, 2005, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after December 1, 2005, will be incorporated by reference in the next update to the SIP compilation.
(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to December 1, 2005, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after December 1, 2005, will be incorporated by reference in the next update to the SIP compilation.
(2) EPA Region 6 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations that have been approved as part of the State implementation plan as of December 1, 2005.
(3) Copies of the materials incorporated by reference may be inspected at the Region 6 EPA Office at 1445 Ross Avenue, Suite 700, Dallas, Texas, 75202-2733; the EPA, Air and Radiation Docket and Information Center, Air Docket (6102), 401 M St., SW., Washington, DC 20460; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal--register/code--of--federal--regulations/ibr--locations.html.
(c) EPA approved regulations.
EPA-Approved Regulations in the Arkansas SIP----------------------------------------------------------------------------------------------------------------
State
submittal/
State citation Title/subject effective EPA approval date Explanation
date----------------------------------------------------------------------------------------------------------------
Regulation No. 19: Regulations of the Arkansas Plan of Implementation for Air Pollution Control
Chapter 1: Title, Intent and Purpose----------------------------------------------------------------------------------------------------------------Reg. 19.101.................... Title............. 01/25/09 03/04/15 (80 FR
11573).Reg. 19.102.................... Applicability..... 02/03/05 04/12/07 (72 FR
18394).Reg. 19.103.................... Intent and 01/25/09 03/04/15 (80 FR
Construction. 11573).Reg. 19.104.................... Severability...... 11/18/12 03/04/15 (80 FR
11573).----------------------------------------------------------------------------------------------------------------
Chapter 2: Definitions----------------------------------------------------------------------------------------------------------------Chapter 2...................... Definitions....... 09/13/14 03/04/15 (80 FR The SIP-approved
11573). definition of ``CO2
equivalent emissions''
does not contain the GHG
Biomass Deferral
Provisions.----------------------------------------------------------------------------------------------------------------
Chapter 3: Protection of the National Ambient Air Quality Standards----------------------------------------------------------------------------------------------------------------Reg. 19.301.................... Purpose........... 02/03/05 04/12/07 (72 FR
18394).Reg. 19.302.................... Department 02/03/05 04/12/07 (72 FR
Responsibilities. 18394).Reg. 19.303.................... Regulated Sources 02/03/05 04/12/07 (72 FR
Responsibilities. 18394).Reg. 19.304.................... Delegated Federal 01/25/09 03/04/15 (80 FR
Programs. 11573).----------------------------------------------------------------------------------------------------------------
Chapter 4: Minor Source Review----------------------------------------------------------------------------------------------------------------Reg. 19.401.................... General 02/03/05 04/12/07 (72 FR
Applicability. 18394).Reg. 19.402.................... Approval Criteria. 02/03/05 04/12/07 (72 FR
18394).Reg. 19.403.................... Owner/Operator's 02/03/05 04/12/07 (72 FR
Responsibilities. 18394).Reg. 19.404.................... Required 02/03/05 04/12/07 (72 FR
Information. 18394).Reg. 19.405.................... Action on 02/03/05 04/12/07 (72 FR
Application. 18394).Reg. 19.406.................... Public 02/03/05 04/12/07 (72 FR
Participation. 18394).Reg. 19.407.................... Permit Amendments. 02/03/05 04/12/07 (72 FR
18394).Reg. 19.408.................... Exemption from 02/03/05 04/12/07 (72 FR
Permitting. 18394).Reg. 19.409.................... Transition........ 02/03/05 04/12/07 (72 FR
18394).Reg. 19.410.................... Permit Revocation 02/03/05 04/12/07 (72 FR
and Cancellation. 18394).Reg. 19.411.................... General Permits... 02/03/05 04/12/07 (72 FR
18394).Reg. 19.412.................... Dispersion 02/03/05 04/12/07 (72 FR
Modeling. 18394).Reg. 19.413.................... Confidentiality... 02/03/05 04/12/07 (72 FR
18394).----------------------------------------------------------------------------------------------------------------
Chapter 5: General Emission Limitations Applicability to Equipment----------------------------------------------------------------------------------------------------------------Reg. 19.501.................... Purpose........... 02/03/05 04/12/07 (72 FR
18394).Reg. 19.502.................... General 09/13/14 03/04/15 (80 FR
Regulations. 11573).Reg. 19.503.................... Visible Emission 01/25/09 03/04/15 (80 FR
Regulations. 11573).Reg. 19.504.................... Stack Height/ 01/25/09 03/04/15 (80 FR
Dispersion 11573).
Regulations.Reg. 19.505.................... Revised Emissions 01/25/09 03/04/15 (80 FR
Limitation. 11573).----------------------------------------------------------------------------------------------------------------
Chapter 6: Upset and Emergency Conditions----------------------------------------------------------------------------------------------------------------Reg. 19.601.................... Upset Conditions.. 01/25/09 03/04/15 (80 FR
11573).Reg. 19.602.................... Emergency 01/25/09 03/04/15 (80 FR
Conditions. 11573).----------------------------------------------------------------------------------------------------------------
Chapter 7: Sampling, Monitoring, and Reporting Requirements----------------------------------------------------------------------------------------------------------------Reg. 19.701.................... Purpose........... 02/03/05 04/12/07 (72 FR
18394).Reg. 19.702.................... Air Emissions 01/25/09 03/04/15 (80 FR
Sampling. 11573).Reg. 19.703.................... Continuous 01/25/09 03/04/15 (80 FR
Emissions 11573).
Monitoring.Reg. 19.704.................... Notice of 02/03/05 04/12/07 (72 FR
Completion. 18394).Reg. 19.705.................... Recordkeeping and 6/22/07 1/15/09 (74 FR
Reporting 2383).
Requirements.Reg. 19.706.................... Public 02/03/05 04/12/07 (72 FR
Availability of 18394).
Emissions Data.----------------------------------------------------------------------------------------------------------------
Chapter 9: Prevention of Significant Deterioration----------------------------------------------------------------------------------------------------------------Reg. 19.901.................... Title............. 02/03/05 04/12/07 (72 FR
18394).Reg. 19.902.................... Purposes.......... 1/25/2009 4/2/13 (78 FR
19596).Reg 19.903..................... Definitions....... 09/13/14 03/04/15 (80 FR
11573).
Reg 19.904..................... Adoption of 09/13/14 03/04/15 (80 FR The SIP-approved PSD
Regulations. 11573). program does not include
the new provisions
pertaining to GHG PSD PAL
permitting at Regulation
19.904(A)(1), effective
on July 27, 2013, and
submitted to EPA on
January 7, 2014.
The SIP-approved PSD
program does not include
the revisions to
Regulation 19.904(G)(1),
effective on July 27,
2013, and submitted to
EPA on January 7, 2014,
pertaining to GHG PSD PAL
permitting.
The Arkansas SIP continues
to include Regulation
19.904(G)(1) as approved
by EPA on April 12, 2007,
as submitted by the state
on February 3, 2005.----------------------------------------------------------------------------------------------------------------
Chapter 10: Regulations for the Control of Volatile Organic Compounds in Pulaski County----------------------------------------------------------------------------------------------------------------Reg. 19.1001................... Title............. 02/03/05 04/12/07 (72 FR
18394).Reg. 19.1002................... Purpose........... 01/25/09 03/04/15 (80 FR
11573).Reg. 19.1003................... Definitions....... 01/25/09 03/04/15 (80 FR
11573).Reg. 19.1004................... General Provisions 01/25/09 03/04/15 (80 FR
11573).Reg. 19.1005................... Provisions for 01/25/09 03/04/15 (80 FR
Specific 11573).
Processes.Reg. 19.1006................... Severability...... 02/03/05 04/12/07 (72 FR
18394).----------------------------------------------------------------------------------------------------------------
Chapter 11: Major Source Permitting Procedures----------------------------------------------------------------------------------------------------------------Chapter 11..................... Major Source 01/25/09 03/04/15 (80 FR
Permitting 11573).
Procedures.----------------------------------------------------------------------------------------------------------------
Chapter 13: Stage I Vapor Recovery----------------------------------------------------------------------------------------------------------------Reg. 19.1301................... Provisions for 01/25/09 03/04/15 (80 FR
Specific 11573).
Processes.Reg. 19.1302................... Applicability..... 02/03/05 04/12/07 (72 FR
18394).Reg. 19.1303................... Definitions....... 01/25/09 03/04/15 (80 FR
11573).Reg. 19.1304................... Exemptions........ 02/03/05 04/12/07 (72 FR
18394).Reg. 19.1305................... Prohibited 02/03/05 04/12/07 (72 FR
Activities. 18394).Reg. 19.1306................... Record Keeping.... 02/03/05 04/12/07 (72 FR
18394).Reg. 19.1307................... Inspections....... 02/03/05 04/12/07 (72 FR
18394).Reg. 19.1308................... Vapor Recovery 02/03/05 04/12/07 (72 FR
Systems. 18394).Reg. 19.1309................... Gasoline Delivery 02/03/05 04/12/07 (72 FR
Vessels. 18394).Reg. 19.1310................... Owner/Operator 02/03/05 04/12/07 (72 FR
Responsibility. 18394).Reg. 19.1311................... Test Methods...... 02/03/05 04/12/07 (72 FR
18394).Reg. 19.1312................... Effective Date.... 02/03/05 04/12/07 (72 FR
18394).----------------------------------------------------------------------------------------------------------------
Chapter 14--CAIR NOX Ozone Season Trading Program General Provisions----------------------------------------------------------------------------------------------------------------Reg. 19.1401................... Adoption of 9/16/2009 4/17/2014 (79 FR
Regulations. 21631).Reg. 19.1402................... State Trading 07/15/07 09/26/07 (72 FR
Budget. 54556).Reg. 19.1403................... Timing 07/15/07 09/26/07 (72 FR
Requirements for 54556).
CAIR NOX Ozone
Season Allowance
Allocations.Reg. 19.1404................... CAIR NOX Ozone 9/16/2009 4/17/2014 (79 FR
Season Allowance 21631).
Allocations.----------------------------------------------------------------------------------------------------------------
Chapter 15: Regional Haze----------------------------------------------------------------------------------------------------------------Reg. 19.1501................... Purpose........... 1/25/2009 3/12/2012 (77 FR ..........................
14604).Reg, 19.1502................... Definitions....... 1/25/2009 3/12/2012 (77 FR ..........................
14604).Reg. 19.1503................... BART Eligible 1/25/2009 3/12/2012 (77 FR ..........................
Sources. 14604).
Reg. 19.1504................... Facilities Subject- 1/25/2009 3/12/2012 (77 FR Under (A): The
to-BART. 14604). identification of sources
subject to BART is
approved, except for not
identifying the 6A and 9A
Boilers at the Georgia
Pacific Crossett Mill,
which we find are subject
to BART.
Under (B): The requirement
for BART installation and
operation as
expeditiously as
practicable, but no later
than 5 years after EPA
approval is partially
approved and partially
disapproved, such that
the partial approval is
for the BART
determinations we are
approving and the partial
disapproval is for the
BART determinations we
are disapproving; and the
requirement for BART
installation and
operation no later than 6
years after the effective
date of the State
regulation is
disapproved.Reg. 19.1505................... BART Requirements. 1/25/2009 3/12/2012 (77 FR The following portions of
14604). Reg. 19.1505 are
disapproved: (A)(1) and
(2), (B), (C), (D)(1) and
(2), (E), (F)(1) and (2),
(G)(1) and (2), (H),
(I)(1) and (2), (J)(1)
and (2), (K), (L),
(M)(1), and (N).Reg. 19.1506................... Compliance 1/25/2009 3/12/2012 (77 FR The requirement to
Provisions. 14604). demonstrate compliance
with the BART limits
listed in Reg. 19.1505
(A)(1) and (2), (B), (C),
(D)(1) and (2), (E),
(F)(1) and (2), (G)(1)
and (2), (H), (I)(1) and
(2), (J)(1) and (2), (K),
(L), (M)(1), and (N) is
disapproved.Reg. 19.1507................... Permit Reopening.. 1/25/2009 3/12/2012 (77 FR ..........................
14604).----------------------------------------------------------------------------------------------------------------
Appendix A: Insignificant Activities List----------------------------------------------------------------------------------------------------------------Appendix A..................... Insignificant 02/03/05 04/12/07 (72 FR
Activities List. 18394).----------------------------------------------------------------------------------------------------------------
Appendix B: National Ambient Air Quality Standards List----------------------------------------------------------------------------------------------------------------Appendix B..................... National Ambient 9/13/2014 3/4/2015 (80 FR
Air Quality 11573).
Standards List.----------------------------------------------------------------------------------------------------------------
Regulation 26: Regulations of the Arkansas Operating Permit Program----------------------------------------------------------------------------------------------------------------
Chapter 3: Requirements for Permit Applicability----------------------------------------------------------------------------------------------------------------Section 26.301................. Requirement for a 08/10/00 10/9/01 (66 FR
permit. 51312).Section 26.302................. Sources subject to 08/10/00 10/9/01 (66 FR
permitting. 51312).----------------------------------------------------------------------------------------------------------------
Chapter 4: Applications for Permits----------------------------------------------------------------------------------------------------------------Section 26.401................. Duty to apply..... 08/10/00 10/9/01 (66 FR
51312).Section 26.402................. Standard 08/10/00 10/9/01 (66 FR
application form 51312).
and required
information.Section 26.407................. Complete 08/10/00 10/9/01 (66 FR
application. 51312).Section 26.409................. Applicants duty to 08/10/00 10/9/01 (66 FR
supplement 51312).
correct
application.Section 26.410................. Certification by 08/10/00 10/9/01 (66 FR
responsible 51312).
official.----------------------------------------------------------------------------------------------------------------
Chapter 5: Action on Application----------------------------------------------------------------------------------------------------------------Section 26.501................. Action on part 70 08/10/00 10/9/01 (66 FR Subsection B Not in SIP.
permit 51312).
applications.Section 26.502................. Final action on 08/10/00 10/9/01 (66 FR
permit 51312).
application.----------------------------------------------------------------------------------------------------------------
Chapter 6: Permit Review by the Public, Affected States, and EPA----------------------------------------------------------------------------------------------------------------Section 26.601................. Untitled 08/10/00 10/9/01 (66 FR
introduction to 51312).
Chapter 6.Section 26.602................. Public 08/10/00 10/9/01 (66 FR Only Subsection A(1),
participation. 51312). A(2), A(5) and D in SIP.Section 26.603................. Transmission of 08/10/00 10/9/01 (66 FR
permit 51312).
information to
the Administrator.Section 26.604................. Review of draft 08/10/00 10/9/01 (66 FR
permit by 51312).
affected States.----------------------------------------------------------------------------------------------------------------
Regulation No. 31: Nonattainment New Source Review Requirements
Chapter 1: Title, Intent, and Purpose----------------------------------------------------------------------------------------------------------------Reg. 31.101.................... Title............. 07/03/06 04/12/07 (72 FR
18394).Reg. 31.102.................... Applicability..... 07/03/06 04/12/07 (72 FR
18394).Reg. 31.103.................... Severability...... 07/03/06 04/12/07 (72 FR
18394).----------------------------------------------------------------------------------------------------------------
Chapter 2: Definitions----------------------------------------------------------------------------------------------------------------Chapter 2...................... Definitions....... 07/03/06 04/12/07 (72 FR
18394).----------------------------------------------------------------------------------------------------------------
Chapter 3: Preconstruction review----------------------------------------------------------------------------------------------------------------Reg. 31.301.................... Requirement for a 07/03/06 04/12/07 (72 FR
Permit. 18394).Reg. 31.302.................... Required 07/03/06 04/12/07 (72 FR
Information. 18394).Reg. 31.303.................... Approval Criteria. 07/03/06 04/12/07 (72 FR
18394).Reg. 31.304.................... Offsets........... 07/03/06 04/12/07 (72 FR
18394).Reg. 31.305.................... Zones Targeted for 07/03/06 04/12/07 (72 FR
Economic 18394).
Development.Reg. 31.306.................... Control Technology 07/03/06 04/12/07 (72 FR
Information. 18394).Reg. 31.307.................... Approval to 07/03/06 04/12/07 (72 FR
Construct. 18394).Reg. 31.308.................... Applicability of 07/03/06 04/12/07 (72 FR
Nonattainment 18394).
Review.Reg. 31.309.................... Applicability of 07/03/06 04/12/07 (72 FR
Other Regulations. 18394).----------------------------------------------------------------------------------------------------------------
Chapter 4: Applicability Tests----------------------------------------------------------------------------------------------------------------Reg. 31.401.................... Actual-to- 07/03/06 04/12/07 (72 FR
Projected-Actual 18394).
Applicability
Test.Reg. 31.402.................... Actual-to- 07/03/06 04/12/07 (72 FR
Potential Test. 18394).Reg. 31.403.................... [Reserved]........ 07/03/06 04/12/07 (72 FR
18394).Reg. 31.404.................... [Reserved]........ 07/03/06 04/12/07 (72 FR
18394).Reg. 31.405.................... Emission Baseline 07/03/06 04/12/07 (72 FR
Credits. 18394).Reg. 31.406.................... Relaxation of 07/03/06 04/12/07 (72 FR
Limits. 18394).Reg. 31.407.................... Modifications to 07/03/06 04/12/07 (72 FR
Existing Units. 18394).Reg. 31.408.................... Public 07/03/06 04/12/07 (72 FR
Availability of 18394).
Information.Reg. 31.409.................... Applicability of 07/03/06 04/12/07 (72 FR
Nitrogen Oxides. 18394).Reg. 31.410.................... Offset 07/03/06 04/12/07 (72 FR
Requirements. 18394).Reg. 31.411.................... PM10 Precursors... 07/03/06 04/12/07 (72 FR
18394).----------------------------------------------------------------------------------------------------------------
Chapter 5: [Reserved]
Chapter 6: [Reserved]
Chapter 7: [Reserved]----------------------------------------------------------------------------------------------------------------
Chapter 8: Actual PALS----------------------------------------------------------------------------------------------------------------Reg. 31.801.................... Applicability..... 07/03/06 04/12/07 (72 FR
18394).
Reg. 31.802.................... Definitions....... 07/03/06 04/12/07 (72 FR
18394).Reg. 31.803.................... Permit Application 07/03/06 04/12/07 (72 FR
Requirements. 18394).Reg. 31.804.................... General 07/03/06 04/12/07 (72 FR
Requirements for 18394).
Establishing PALs.Reg. 31.805.................... Public 07/03/06 04/12/07 (72 FR
Participation 18394).
Requirement for
PALs.Reg. 31.806.................... Setting the 10- 07/03/06 04/12/07 (72 FR
year Actuals PAL 18394).
Level.Reg. 31.807.................... Contents of the 07/03/06 04/12/07 (72 FR
PAL Permit. 18394).Reg. 31.808.................... Reopening of the 07/03/06 04/12/07 (72 FR
PAL Permit. 18394).Reg. 31.809.................... PAL Effective 07/03/06 04/12/07 (72 FR
Period. 18394).Reg. 31.810.................... Expiration of a 07/03/06 04/12/07 (72 FR
PAL. 18394).Reg. 31.811.................... Renewal of a PAL.. 07/03/06 04/12/07 (72 FR
18394).Reg. 31.812.................... Increasing a PAL 07/03/06 04/12/07 (72 FR
During the PAL 18394).
Effective Period.Reg. 31.813.................... Monitoring 07/03/06 04/12/07 (72 FR
Requirements for 18394).
PALs.Reg. 31.814.................... Recordkeeping 07/03/06 04/12/07 (72 FR
Requirements. 18394).Reg. 31.815.................... Reporting and 07/03/06 04/12/07 (72 FR
Notification 18394).
Requirements.Reg. 31.816.................... Transition 07/03/06 04/12/07 (72 FR
Requirements. 18394).----------------------------------------------------------------------------------------------------------------
Chapter 9: Effective Date----------------------------------------------------------------------------------------------------------------Reg. 31.901.................... Effective Date.... 07/03/06 04/12/07 (72 FR
18394).----------------------------------------------------------------------------------------------------------------
Regulation No. 9: Fee Regulation----------------------------------------------------------------------------------------------------------------Chapter 1...................... Title............. 7/9/2012 4/30/2015, 80 FR
24216.Chapter 2...................... Definitions....... 7/9/2012 4/30/2015, 80 FR The following definitions
24216. do not relate to the air
program and are not being
approved into the SIP:
``Category'',
``Certificate'',
``Confined Animal
Operation'',
``Discretionary Major
Facility'',
``Evaluation'',
``Laboratory``, ``Major
Municipal Facility'',
``Non-Municipal Major
Facility'',
``Parameter'',
``Program''.Chapter 3...................... Permit Fee Payment 7/9/2012 4/30/2015, 80 FR
24216.Chapter 5...................... Air Permit Fees... 7/9/2012 4/30/2015, 80 FR
24216.Chapter 9...................... Administrative 7/9/2012 4/30/2015, 80 FR
Procedures. 24216.----------------------------------------------------------------------------------------------------------------
(d) EPA-approved State source-specific requirements.
EPA-Approved Arkansas Source-Specific Requirements----------------------------------------------------------------------------------------------------------------
State
approval/ EPA
Name of source Permit No. effective approval Comments
date date----------------------------------------------------------------------------------------------------------------None.----------------------------------------------------------------------------------------------------------------
(e) EPA-approved nonregulatory provisions and quasi-regulatory measures.
EPA-Approved Statutes in the Arkansas SIP----------------------------------------------------------------------------------------------------------------
State
submittal/
State citation Title/subject effective EPA approval date Explanation
date----------------------------------------------------------------------------------------------------------------
Arkansas Water and Air Pollution Control Act--Part I----------------------------------------------------------------------------------------------------------------82.1901........................ Title of Act...... 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
10841).82.1902........................ Definitions....... 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
10841).82.1903........................ Pollution Control 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Commission. 10841).
82.1904........................ Powers and Duties 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
of Commission. 10841).82.1905........................ Persons Operating 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Disposal System-- 10841).
Furnishing
Information and
Permitting
Examinations and
Surveys.82.1906........................ Hearing Before 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Commission or 10841).
Member--Appeal
Procedure.82.1907........................ Co-operation with 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Agency of Another 10841).
State or United
States.82.1908........................ Actions Declared 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Public Nuisance-- 10841).
Permit to
Construct, Make
Changes in or
Operate Disposal
System--Submissio
n of Plans.82.1909........................ Violation of Act a 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Misdemeanor--Poll 10841).
ution a Nuisance--
Abatement.----------------------------------------------------------------------------------------------------------------
Arkansas Environmental Permit Fees Act (Act 817 of 1983)----------------------------------------------------------------------------------------------------------------82-1916 thru 82-1921........... Permit Fees Act... 12/16/85 11/12/86 (51 FR Ref 522.200(c)(24).
40975).----------------------------------------------------------------------------------------------------------------
Arkansas Water and Air Pollution Control Act--Part II----------------------------------------------------------------------------------------------------------------82-1931........................ Air Pollution- 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
State Policy. 10841).82-1932........................ Purpose of Act.... 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
10841).82-1933........................ Definitions....... 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
10841).82-1934........................ Exemptions........ 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
10841).82-1935........................ Powers of 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Commission. 10841).82-1936........................ Factors in 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Exercise of 10841).
Commission Powers.82-1937........................ Industrial Secrets 11/25/85 08/04/86 (51 FR Ref 52.200(c)(23).
Confidential--Rev 27840).
ealing a
Misdemeanor.82-1938........................ Unlawful Acts..... 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
10841).82-1939........................ Variance from 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Regulations. 10841).82-1940........................ Application of 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Water Pollution 10841).
Provisions.82-1941........................ Political 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Subdivision 10841).
Forbidden to
Legislate on Air
Pollution.82-1942........................ Radiation Control 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Law Not Amended 10841).
or Repealed--No
Authority to
Commission Over
Employer-Employee
Relationships.82-1943........................ Private Rights 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).
Unchanged. 10841).----------------------------------------------------------------------------------------------------------------
Small Business Assistance Program Act (Act 251 of 1993)----------------------------------------------------------------------------------------------------------------Act 251........................ SBAP Act.......... 02/26/93 03/08/95 (60 FR Ref 52.200(c)(31).
12691).----------------------------------------------------------------------------------------------------------------
EPA-Approved Control Measures in the Arkansas SIP----------------------------------------------------------------------------------------------------------------
State
Applicable submittal/
Control measures geographic or effective EPA approval date Explanation
nonattainment area date----------------------------------------------------------------------------------------------------------------Air Quality Surveillance....... Statewide......... 04/24/80 08/06/81 (46 FR Ref 52.200(c)(6) & (20).
40005).Lead SIP....................... Statewide......... 12/10/79 04/16/82 (47 FR Ref 52.200(c)(17).
16328).
Protection of Visibility in Statewide......... 06/12/85 02/10/86 (51 FR Ref 52.200(c)(22).
Mandatory Class I Federal 4910).
Areas.Part II of the Visibility Statewide......... 10/09/87 07/21/88 (53 FR Ref 52.200(c)(25).
Protection Plan. 27514).Good Engineering Practice Stack Statewide......... 06/1/87 02/23/89 (54 FR Ref 52.200(c)(26).
Height Regulations. 7764).Small Business Stationary Statewide......... 11/06/92 03/08/95 (60 FR Ref 52.200(c)(31).
Source Technical and 12691).
Environmental Compliance
Assistance Program.----------------------------------------------------------------------------------------------------------------
EPA-Approved Non-Regulatory Provisions and Quasi-Regulatory Measures in the Arkansas SIP----------------------------------------------------------------------------------------------------------------
State
Applicable submittal/
Name of SIP provision geographic or effective EPA approval date Explanation
nonattainment area date----------------------------------------------------------------------------------------------------------------Emissions Inventory for Crittenden County... 6/22/07 1/15/09 (74 FR
Crittenden County. 2383).8-Hour Ozone Maintenance plan for Crittenden, Shelby 2/26/09 3/24/10 (75 FR
the Crittenden County, Arkansas County. 14077).
Area.Interstate Transport for the 1997 Statewide........... 3/28/08 3/12/12 (77 FR Noninterference with
ozone and PM2.5 NAAQS 14604). measures required
(Noninterference with measures to protect
required to protect visibility visibility in any
in any other State). other State
partially approved
3/12/12.Regional Haze SIP................ Statewide........... 9/23/08, 8/3/ 3/12/12 (77 FR The following
10 14604). portions are
partially approved
and partially
disapproved:
(a) Identification of (a) Identification
affected Class I areas. of best available
retrofit technology
(BART) eligible
sources and subject
to BART sources;
(b) Determination of baseline (b) requirements for
and natural visibility best available
conditions. retrofit technology
(BART);
(c) Determination of the (c) the Arkansas
Uniform Rate of Progress. Regional Haze Rule;
and
(d) Reasonable progress goal (d) Long Term
consultation and long term Strategy. (See Sec.
strategy consultation. 52.173(a)).
(e) Coordination regional
haze and reasonably
attributable visibility
impairment.
(f) Monitoring Strategy and
other implementation
requirements.
(g) Commitment to submit
periodic Regional Haze SIP
revisions and periodic
progress reports describing
progress towards the
reasonable progress goals.
(h) Commitment to make a
determination of the
adequacy of the existing SIP
at the time a progress
report is submitted.
(i) Coordination with States
and Federal Land Managers.
(j) The following best
available retrofit
technology (BART)
determinations: PM BART
determination for the AEP
Flint Creek Plant Boiler No.
1; SO2 and PM BART
determinations for the
natural gas firing scenario
for the Entergy Lake
Catherine Plant Unit 4; PM
BART determinations for both
the bituminous and sub-
bituminous coal firing
scenarios for the Entergy
White Bluff Plant Units 1
and 2; and PM BART
determination for the Domtar
Ashdown Mill Power Boiler
No. 1.Infrastructure for the 1997 Ozone Statewide........... 12/17/07 8/20/12 (77 FR Approval for CAA
NAAQS. 3/28/08 50033). elements
110(a)(2)(A), (B),
(E), (F), (G), (H),
(K), (L), and (M).
Approval for CAA
elements
110(a)(2)(C),
(D)(i)(II)
(interfere with
measures in any
other state to
prevent significant
deterioration of
air quality),
(D)(ii), and (J)
for the 1997 ozone
NAAQS, except as it
relates to
Greenhouse Gas
(GHG) emissions.Infrastructure for the 1997 and Statewide........... 3/28/08 3/4/2015 (80 FR Approval for CAA
2006 PM2.5 NAAQS. 9/16/09 11573). elements
9/13/2014 110(a)(2)(A), (B),
(E), (F), (G), (H),
(K), (L), and (M)
on 8/20/2012 (77 FR
50033). Approval
for PSD elements
(C), (D)(i)(II)
(interfere with
measures in any
other state to
prevent significant
deterioration of
air quality) and
(J) on March 4,
2015 (80 FR 11573)Interstate transport for the 1997 Statewide........... 4/5/11 8/20/12 (77 FR Approved except as
ozone NAAQS (Noninterference 50033). it relates to GHGs.
with measures required to
prevent significant
deterioration of air quality in
any other State).
Interstate transport for the 1997 Statewide........... 12/17/2007 8/29/2013 (78 FR ....................
and 2006 PM2.5 NAAQS (contribute 9/16/2009 53269).
to nonattainment or interfere
with maintenance).---------------------------------------------------------------------------------------------------------------- [63 FR 56927, Oct. 23, 1998, as amended at 65 FR 61107, Oct. 16, 2000; 66 FR 51316, Oct. 9, 2001; 71 FR 13545, Mar. 16, 2006; 72 FR 18396, Apr. 12, 2007; 72 FR 54561, Sept. 26, 2007; 74 FR 2386, Jan. 15, 2009; 75 FR 14080, Mar. 24, 2010; 77 FR 14675, 14676, Mar. 12, 2012; 77 FR 50037, Aug. 20, 2012; 78 FR 19598, Apr. 2, 2013; 78 FR 53270, Aug. 29, 2013; 80 FR 11574, Mar. 4, 2015; 80 FR 24218, Apr. 30, 2015]