CFR /  Title 40  /  Part 52  /  Sec. 52.170 Identification of plan.

(a) Purpose and scope. This section sets forth the applicable State Implementation Plan (SIP) for Arkansas under section 110 of the Clean Air Act, 42 U.S.C. 7410, and 40 CFR part 51 to meet national ambient air quality standards.

(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to December 1, 2005, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after December 1, 2005, will be incorporated by reference in the next update to the SIP compilation.

(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to December 1, 2005, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after December 1, 2005, will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 6 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations that have been approved as part of the State implementation plan as of December 1, 2005.

(3) Copies of the materials incorporated by reference may be inspected at the Region 6 EPA Office at 1445 Ross Avenue, Suite 700, Dallas, Texas, 75202-2733; the EPA, Air and Radiation Docket and Information Center, Air Docket (6102), 401 M St., SW., Washington, DC 20460; or at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal--register/code--of--federal--regulations/ibr--locations.html.

(c) EPA approved regulations.

EPA-Approved Regulations in the Arkansas SIP----------------------------------------------------------------------------------------------------------------

State

submittal/

State citation Title/subject effective EPA approval date Explanation

date----------------------------------------------------------------------------------------------------------------

Regulation No. 19: Regulations of the Arkansas Plan of Implementation for Air Pollution Control

Chapter 1: Title, Intent and Purpose----------------------------------------------------------------------------------------------------------------Reg. 19.101.................... Title............. 01/25/09 03/04/15 (80 FR

11573).Reg. 19.102.................... Applicability..... 02/03/05 04/12/07 (72 FR

18394).Reg. 19.103.................... Intent and 01/25/09 03/04/15 (80 FR

Construction. 11573).Reg. 19.104.................... Severability...... 11/18/12 03/04/15 (80 FR

11573).----------------------------------------------------------------------------------------------------------------

Chapter 2: Definitions----------------------------------------------------------------------------------------------------------------Chapter 2...................... Definitions....... 09/13/14 03/04/15 (80 FR The SIP-approved

11573). definition of ``CO2

equivalent emissions''

does not contain the GHG

Biomass Deferral

Provisions.----------------------------------------------------------------------------------------------------------------

Chapter 3: Protection of the National Ambient Air Quality Standards----------------------------------------------------------------------------------------------------------------Reg. 19.301.................... Purpose........... 02/03/05 04/12/07 (72 FR

18394).Reg. 19.302.................... Department 02/03/05 04/12/07 (72 FR

Responsibilities. 18394).Reg. 19.303.................... Regulated Sources 02/03/05 04/12/07 (72 FR

Responsibilities. 18394).Reg. 19.304.................... Delegated Federal 01/25/09 03/04/15 (80 FR

Programs. 11573).----------------------------------------------------------------------------------------------------------------

Chapter 4: Minor Source Review----------------------------------------------------------------------------------------------------------------Reg. 19.401.................... General 02/03/05 04/12/07 (72 FR

Applicability. 18394).Reg. 19.402.................... Approval Criteria. 02/03/05 04/12/07 (72 FR

18394).Reg. 19.403.................... Owner/Operator's 02/03/05 04/12/07 (72 FR

Responsibilities. 18394).Reg. 19.404.................... Required 02/03/05 04/12/07 (72 FR

Information. 18394).Reg. 19.405.................... Action on 02/03/05 04/12/07 (72 FR

Application. 18394).Reg. 19.406.................... Public 02/03/05 04/12/07 (72 FR

Participation. 18394).Reg. 19.407.................... Permit Amendments. 02/03/05 04/12/07 (72 FR

18394).Reg. 19.408.................... Exemption from 02/03/05 04/12/07 (72 FR

Permitting. 18394).Reg. 19.409.................... Transition........ 02/03/05 04/12/07 (72 FR

18394).Reg. 19.410.................... Permit Revocation 02/03/05 04/12/07 (72 FR

and Cancellation. 18394).Reg. 19.411.................... General Permits... 02/03/05 04/12/07 (72 FR

18394).Reg. 19.412.................... Dispersion 02/03/05 04/12/07 (72 FR

Modeling. 18394).Reg. 19.413.................... Confidentiality... 02/03/05 04/12/07 (72 FR

18394).----------------------------------------------------------------------------------------------------------------

Chapter 5: General Emission Limitations Applicability to Equipment----------------------------------------------------------------------------------------------------------------Reg. 19.501.................... Purpose........... 02/03/05 04/12/07 (72 FR

18394).Reg. 19.502.................... General 09/13/14 03/04/15 (80 FR

Regulations. 11573).Reg. 19.503.................... Visible Emission 01/25/09 03/04/15 (80 FR

Regulations. 11573).Reg. 19.504.................... Stack Height/ 01/25/09 03/04/15 (80 FR

Dispersion 11573).

Regulations.Reg. 19.505.................... Revised Emissions 01/25/09 03/04/15 (80 FR

Limitation. 11573).----------------------------------------------------------------------------------------------------------------

Chapter 6: Upset and Emergency Conditions----------------------------------------------------------------------------------------------------------------Reg. 19.601.................... Upset Conditions.. 01/25/09 03/04/15 (80 FR

11573).Reg. 19.602.................... Emergency 01/25/09 03/04/15 (80 FR

Conditions. 11573).----------------------------------------------------------------------------------------------------------------

Chapter 7: Sampling, Monitoring, and Reporting Requirements----------------------------------------------------------------------------------------------------------------Reg. 19.701.................... Purpose........... 02/03/05 04/12/07 (72 FR

18394).Reg. 19.702.................... Air Emissions 01/25/09 03/04/15 (80 FR

Sampling. 11573).Reg. 19.703.................... Continuous 01/25/09 03/04/15 (80 FR

Emissions 11573).

Monitoring.Reg. 19.704.................... Notice of 02/03/05 04/12/07 (72 FR

Completion. 18394).Reg. 19.705.................... Recordkeeping and 6/22/07 1/15/09 (74 FR

Reporting 2383).

Requirements.Reg. 19.706.................... Public 02/03/05 04/12/07 (72 FR

Availability of 18394).

Emissions Data.----------------------------------------------------------------------------------------------------------------

Chapter 9: Prevention of Significant Deterioration----------------------------------------------------------------------------------------------------------------Reg. 19.901.................... Title............. 02/03/05 04/12/07 (72 FR

18394).Reg. 19.902.................... Purposes.......... 1/25/2009 4/2/13 (78 FR

19596).Reg 19.903..................... Definitions....... 09/13/14 03/04/15 (80 FR

11573).

Reg 19.904..................... Adoption of 09/13/14 03/04/15 (80 FR The SIP-approved PSD

Regulations. 11573). program does not include

the new provisions

pertaining to GHG PSD PAL

permitting at Regulation

19.904(A)(1), effective

on July 27, 2013, and

submitted to EPA on

January 7, 2014.

The SIP-approved PSD

program does not include

the revisions to

Regulation 19.904(G)(1),

effective on July 27,

2013, and submitted to

EPA on January 7, 2014,

pertaining to GHG PSD PAL

permitting.

The Arkansas SIP continues

to include Regulation

19.904(G)(1) as approved

by EPA on April 12, 2007,

as submitted by the state

on February 3, 2005.----------------------------------------------------------------------------------------------------------------

Chapter 10: Regulations for the Control of Volatile Organic Compounds in Pulaski County----------------------------------------------------------------------------------------------------------------Reg. 19.1001................... Title............. 02/03/05 04/12/07 (72 FR

18394).Reg. 19.1002................... Purpose........... 01/25/09 03/04/15 (80 FR

11573).Reg. 19.1003................... Definitions....... 01/25/09 03/04/15 (80 FR

11573).Reg. 19.1004................... General Provisions 01/25/09 03/04/15 (80 FR

11573).Reg. 19.1005................... Provisions for 01/25/09 03/04/15 (80 FR

Specific 11573).

Processes.Reg. 19.1006................... Severability...... 02/03/05 04/12/07 (72 FR

18394).----------------------------------------------------------------------------------------------------------------

Chapter 11: Major Source Permitting Procedures----------------------------------------------------------------------------------------------------------------Chapter 11..................... Major Source 01/25/09 03/04/15 (80 FR

Permitting 11573).

Procedures.----------------------------------------------------------------------------------------------------------------

Chapter 13: Stage I Vapor Recovery----------------------------------------------------------------------------------------------------------------Reg. 19.1301................... Provisions for 01/25/09 03/04/15 (80 FR

Specific 11573).

Processes.Reg. 19.1302................... Applicability..... 02/03/05 04/12/07 (72 FR

18394).Reg. 19.1303................... Definitions....... 01/25/09 03/04/15 (80 FR

11573).Reg. 19.1304................... Exemptions........ 02/03/05 04/12/07 (72 FR

18394).Reg. 19.1305................... Prohibited 02/03/05 04/12/07 (72 FR

Activities. 18394).Reg. 19.1306................... Record Keeping.... 02/03/05 04/12/07 (72 FR

18394).Reg. 19.1307................... Inspections....... 02/03/05 04/12/07 (72 FR

18394).Reg. 19.1308................... Vapor Recovery 02/03/05 04/12/07 (72 FR

Systems. 18394).Reg. 19.1309................... Gasoline Delivery 02/03/05 04/12/07 (72 FR

Vessels. 18394).Reg. 19.1310................... Owner/Operator 02/03/05 04/12/07 (72 FR

Responsibility. 18394).Reg. 19.1311................... Test Methods...... 02/03/05 04/12/07 (72 FR

18394).Reg. 19.1312................... Effective Date.... 02/03/05 04/12/07 (72 FR

18394).----------------------------------------------------------------------------------------------------------------

Chapter 14--CAIR NOX Ozone Season Trading Program General Provisions----------------------------------------------------------------------------------------------------------------Reg. 19.1401................... Adoption of 9/16/2009 4/17/2014 (79 FR

Regulations. 21631).Reg. 19.1402................... State Trading 07/15/07 09/26/07 (72 FR

Budget. 54556).Reg. 19.1403................... Timing 07/15/07 09/26/07 (72 FR

Requirements for 54556).

CAIR NOX Ozone

Season Allowance

Allocations.Reg. 19.1404................... CAIR NOX Ozone 9/16/2009 4/17/2014 (79 FR

Season Allowance 21631).

Allocations.----------------------------------------------------------------------------------------------------------------

Chapter 15: Regional Haze----------------------------------------------------------------------------------------------------------------Reg. 19.1501................... Purpose........... 1/25/2009 3/12/2012 (77 FR ..........................

14604).Reg, 19.1502................... Definitions....... 1/25/2009 3/12/2012 (77 FR ..........................

14604).Reg. 19.1503................... BART Eligible 1/25/2009 3/12/2012 (77 FR ..........................

Sources. 14604).

Reg. 19.1504................... Facilities Subject- 1/25/2009 3/12/2012 (77 FR Under (A): The

to-BART. 14604). identification of sources

subject to BART is

approved, except for not

identifying the 6A and 9A

Boilers at the Georgia

Pacific Crossett Mill,

which we find are subject

to BART.

Under (B): The requirement

for BART installation and

operation as

expeditiously as

practicable, but no later

than 5 years after EPA

approval is partially

approved and partially

disapproved, such that

the partial approval is

for the BART

determinations we are

approving and the partial

disapproval is for the

BART determinations we

are disapproving; and the

requirement for BART

installation and

operation no later than 6

years after the effective

date of the State

regulation is

disapproved.Reg. 19.1505................... BART Requirements. 1/25/2009 3/12/2012 (77 FR The following portions of

14604). Reg. 19.1505 are

disapproved: (A)(1) and

(2), (B), (C), (D)(1) and

(2), (E), (F)(1) and (2),

(G)(1) and (2), (H),

(I)(1) and (2), (J)(1)

and (2), (K), (L),

(M)(1), and (N).Reg. 19.1506................... Compliance 1/25/2009 3/12/2012 (77 FR The requirement to

Provisions. 14604). demonstrate compliance

with the BART limits

listed in Reg. 19.1505

(A)(1) and (2), (B), (C),

(D)(1) and (2), (E),

(F)(1) and (2), (G)(1)

and (2), (H), (I)(1) and

(2), (J)(1) and (2), (K),

(L), (M)(1), and (N) is

disapproved.Reg. 19.1507................... Permit Reopening.. 1/25/2009 3/12/2012 (77 FR ..........................

14604).----------------------------------------------------------------------------------------------------------------

Appendix A: Insignificant Activities List----------------------------------------------------------------------------------------------------------------Appendix A..................... Insignificant 02/03/05 04/12/07 (72 FR

Activities List. 18394).----------------------------------------------------------------------------------------------------------------

Appendix B: National Ambient Air Quality Standards List----------------------------------------------------------------------------------------------------------------Appendix B..................... National Ambient 9/13/2014 3/4/2015 (80 FR

Air Quality 11573).

Standards List.----------------------------------------------------------------------------------------------------------------

Regulation 26: Regulations of the Arkansas Operating Permit Program----------------------------------------------------------------------------------------------------------------

Chapter 3: Requirements for Permit Applicability----------------------------------------------------------------------------------------------------------------Section 26.301................. Requirement for a 08/10/00 10/9/01 (66 FR

permit. 51312).Section 26.302................. Sources subject to 08/10/00 10/9/01 (66 FR

permitting. 51312).----------------------------------------------------------------------------------------------------------------

Chapter 4: Applications for Permits----------------------------------------------------------------------------------------------------------------Section 26.401................. Duty to apply..... 08/10/00 10/9/01 (66 FR

51312).Section 26.402................. Standard 08/10/00 10/9/01 (66 FR

application form 51312).

and required

information.Section 26.407................. Complete 08/10/00 10/9/01 (66 FR

application. 51312).Section 26.409................. Applicants duty to 08/10/00 10/9/01 (66 FR

supplement 51312).

correct

application.Section 26.410................. Certification by 08/10/00 10/9/01 (66 FR

responsible 51312).

official.----------------------------------------------------------------------------------------------------------------

Chapter 5: Action on Application----------------------------------------------------------------------------------------------------------------Section 26.501................. Action on part 70 08/10/00 10/9/01 (66 FR Subsection B Not in SIP.

permit 51312).

applications.Section 26.502................. Final action on 08/10/00 10/9/01 (66 FR

permit 51312).

application.----------------------------------------------------------------------------------------------------------------

Chapter 6: Permit Review by the Public, Affected States, and EPA----------------------------------------------------------------------------------------------------------------Section 26.601................. Untitled 08/10/00 10/9/01 (66 FR

introduction to 51312).

Chapter 6.Section 26.602................. Public 08/10/00 10/9/01 (66 FR Only Subsection A(1),

participation. 51312). A(2), A(5) and D in SIP.Section 26.603................. Transmission of 08/10/00 10/9/01 (66 FR

permit 51312).

information to

the Administrator.Section 26.604................. Review of draft 08/10/00 10/9/01 (66 FR

permit by 51312).

affected States.----------------------------------------------------------------------------------------------------------------

Regulation No. 31: Nonattainment New Source Review Requirements

Chapter 1: Title, Intent, and Purpose----------------------------------------------------------------------------------------------------------------Reg. 31.101.................... Title............. 07/03/06 04/12/07 (72 FR

18394).Reg. 31.102.................... Applicability..... 07/03/06 04/12/07 (72 FR

18394).Reg. 31.103.................... Severability...... 07/03/06 04/12/07 (72 FR

18394).----------------------------------------------------------------------------------------------------------------

Chapter 2: Definitions----------------------------------------------------------------------------------------------------------------Chapter 2...................... Definitions....... 07/03/06 04/12/07 (72 FR

18394).----------------------------------------------------------------------------------------------------------------

Chapter 3: Preconstruction review----------------------------------------------------------------------------------------------------------------Reg. 31.301.................... Requirement for a 07/03/06 04/12/07 (72 FR

Permit. 18394).Reg. 31.302.................... Required 07/03/06 04/12/07 (72 FR

Information. 18394).Reg. 31.303.................... Approval Criteria. 07/03/06 04/12/07 (72 FR

18394).Reg. 31.304.................... Offsets........... 07/03/06 04/12/07 (72 FR

18394).Reg. 31.305.................... Zones Targeted for 07/03/06 04/12/07 (72 FR

Economic 18394).

Development.Reg. 31.306.................... Control Technology 07/03/06 04/12/07 (72 FR

Information. 18394).Reg. 31.307.................... Approval to 07/03/06 04/12/07 (72 FR

Construct. 18394).Reg. 31.308.................... Applicability of 07/03/06 04/12/07 (72 FR

Nonattainment 18394).

Review.Reg. 31.309.................... Applicability of 07/03/06 04/12/07 (72 FR

Other Regulations. 18394).----------------------------------------------------------------------------------------------------------------

Chapter 4: Applicability Tests----------------------------------------------------------------------------------------------------------------Reg. 31.401.................... Actual-to- 07/03/06 04/12/07 (72 FR

Projected-Actual 18394).

Applicability

Test.Reg. 31.402.................... Actual-to- 07/03/06 04/12/07 (72 FR

Potential Test. 18394).Reg. 31.403.................... [Reserved]........ 07/03/06 04/12/07 (72 FR

18394).Reg. 31.404.................... [Reserved]........ 07/03/06 04/12/07 (72 FR

18394).Reg. 31.405.................... Emission Baseline 07/03/06 04/12/07 (72 FR

Credits. 18394).Reg. 31.406.................... Relaxation of 07/03/06 04/12/07 (72 FR

Limits. 18394).Reg. 31.407.................... Modifications to 07/03/06 04/12/07 (72 FR

Existing Units. 18394).Reg. 31.408.................... Public 07/03/06 04/12/07 (72 FR

Availability of 18394).

Information.Reg. 31.409.................... Applicability of 07/03/06 04/12/07 (72 FR

Nitrogen Oxides. 18394).Reg. 31.410.................... Offset 07/03/06 04/12/07 (72 FR

Requirements. 18394).Reg. 31.411.................... PM10 Precursors... 07/03/06 04/12/07 (72 FR

18394).----------------------------------------------------------------------------------------------------------------

Chapter 5: [Reserved]

Chapter 6: [Reserved]

Chapter 7: [Reserved]----------------------------------------------------------------------------------------------------------------

Chapter 8: Actual PALS----------------------------------------------------------------------------------------------------------------Reg. 31.801.................... Applicability..... 07/03/06 04/12/07 (72 FR

18394).

Reg. 31.802.................... Definitions....... 07/03/06 04/12/07 (72 FR

18394).Reg. 31.803.................... Permit Application 07/03/06 04/12/07 (72 FR

Requirements. 18394).Reg. 31.804.................... General 07/03/06 04/12/07 (72 FR

Requirements for 18394).

Establishing PALs.Reg. 31.805.................... Public 07/03/06 04/12/07 (72 FR

Participation 18394).

Requirement for

PALs.Reg. 31.806.................... Setting the 10- 07/03/06 04/12/07 (72 FR

year Actuals PAL 18394).

Level.Reg. 31.807.................... Contents of the 07/03/06 04/12/07 (72 FR

PAL Permit. 18394).Reg. 31.808.................... Reopening of the 07/03/06 04/12/07 (72 FR

PAL Permit. 18394).Reg. 31.809.................... PAL Effective 07/03/06 04/12/07 (72 FR

Period. 18394).Reg. 31.810.................... Expiration of a 07/03/06 04/12/07 (72 FR

PAL. 18394).Reg. 31.811.................... Renewal of a PAL.. 07/03/06 04/12/07 (72 FR

18394).Reg. 31.812.................... Increasing a PAL 07/03/06 04/12/07 (72 FR

During the PAL 18394).

Effective Period.Reg. 31.813.................... Monitoring 07/03/06 04/12/07 (72 FR

Requirements for 18394).

PALs.Reg. 31.814.................... Recordkeeping 07/03/06 04/12/07 (72 FR

Requirements. 18394).Reg. 31.815.................... Reporting and 07/03/06 04/12/07 (72 FR

Notification 18394).

Requirements.Reg. 31.816.................... Transition 07/03/06 04/12/07 (72 FR

Requirements. 18394).----------------------------------------------------------------------------------------------------------------

Chapter 9: Effective Date----------------------------------------------------------------------------------------------------------------Reg. 31.901.................... Effective Date.... 07/03/06 04/12/07 (72 FR

18394).----------------------------------------------------------------------------------------------------------------

Regulation No. 9: Fee Regulation----------------------------------------------------------------------------------------------------------------Chapter 1...................... Title............. 7/9/2012 4/30/2015, 80 FR

24216.Chapter 2...................... Definitions....... 7/9/2012 4/30/2015, 80 FR The following definitions

24216. do not relate to the air

program and are not being

approved into the SIP:

``Category'',

``Certificate'',

``Confined Animal

Operation'',

``Discretionary Major

Facility'',

``Evaluation'',

``Laboratory``, ``Major

Municipal Facility'',

``Non-Municipal Major

Facility'',

``Parameter'',

``Program''.Chapter 3...................... Permit Fee Payment 7/9/2012 4/30/2015, 80 FR

24216.Chapter 5...................... Air Permit Fees... 7/9/2012 4/30/2015, 80 FR

24216.Chapter 9...................... Administrative 7/9/2012 4/30/2015, 80 FR

Procedures. 24216.----------------------------------------------------------------------------------------------------------------

(d) EPA-approved State source-specific requirements.

EPA-Approved Arkansas Source-Specific Requirements----------------------------------------------------------------------------------------------------------------

State

approval/ EPA

Name of source Permit No. effective approval Comments

date date----------------------------------------------------------------------------------------------------------------None.----------------------------------------------------------------------------------------------------------------

(e) EPA-approved nonregulatory provisions and quasi-regulatory measures.

EPA-Approved Statutes in the Arkansas SIP----------------------------------------------------------------------------------------------------------------

State

submittal/

State citation Title/subject effective EPA approval date Explanation

date----------------------------------------------------------------------------------------------------------------

Arkansas Water and Air Pollution Control Act--Part I----------------------------------------------------------------------------------------------------------------82.1901........................ Title of Act...... 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

10841).82.1902........................ Definitions....... 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

10841).82.1903........................ Pollution Control 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Commission. 10841).

82.1904........................ Powers and Duties 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

of Commission. 10841).82.1905........................ Persons Operating 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Disposal System-- 10841).

Furnishing

Information and

Permitting

Examinations and

Surveys.82.1906........................ Hearing Before 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Commission or 10841).

Member--Appeal

Procedure.82.1907........................ Co-operation with 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Agency of Another 10841).

State or United

States.82.1908........................ Actions Declared 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Public Nuisance-- 10841).

Permit to

Construct, Make

Changes in or

Operate Disposal

System--Submissio

n of Plans.82.1909........................ Violation of Act a 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Misdemeanor--Poll 10841).

ution a Nuisance--

Abatement.----------------------------------------------------------------------------------------------------------------

Arkansas Environmental Permit Fees Act (Act 817 of 1983)----------------------------------------------------------------------------------------------------------------82-1916 thru 82-1921........... Permit Fees Act... 12/16/85 11/12/86 (51 FR Ref 522.200(c)(24).

40975).----------------------------------------------------------------------------------------------------------------

Arkansas Water and Air Pollution Control Act--Part II----------------------------------------------------------------------------------------------------------------82-1931........................ Air Pollution- 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

State Policy. 10841).82-1932........................ Purpose of Act.... 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

10841).82-1933........................ Definitions....... 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

10841).82-1934........................ Exemptions........ 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

10841).82-1935........................ Powers of 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Commission. 10841).82-1936........................ Factors in 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Exercise of 10841).

Commission Powers.82-1937........................ Industrial Secrets 11/25/85 08/04/86 (51 FR Ref 52.200(c)(23).

Confidential--Rev 27840).

ealing a

Misdemeanor.82-1938........................ Unlawful Acts..... 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

10841).82-1939........................ Variance from 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Regulations. 10841).82-1940........................ Application of 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Water Pollution 10841).

Provisions.82-1941........................ Political 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Subdivision 10841).

Forbidden to

Legislate on Air

Pollution.82-1942........................ Radiation Control 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Law Not Amended 10841).

or Repealed--No

Authority to

Commission Over

Employer-Employee

Relationships.82-1943........................ Private Rights 01/28/72 05/31/72 (37 FR Ref 52.200(a) & (b).

Unchanged. 10841).----------------------------------------------------------------------------------------------------------------

Small Business Assistance Program Act (Act 251 of 1993)----------------------------------------------------------------------------------------------------------------Act 251........................ SBAP Act.......... 02/26/93 03/08/95 (60 FR Ref 52.200(c)(31).

12691).----------------------------------------------------------------------------------------------------------------

EPA-Approved Control Measures in the Arkansas SIP----------------------------------------------------------------------------------------------------------------

State

Applicable submittal/

Control measures geographic or effective EPA approval date Explanation

nonattainment area date----------------------------------------------------------------------------------------------------------------Air Quality Surveillance....... Statewide......... 04/24/80 08/06/81 (46 FR Ref 52.200(c)(6) & (20).

40005).Lead SIP....................... Statewide......... 12/10/79 04/16/82 (47 FR Ref 52.200(c)(17).

16328).

Protection of Visibility in Statewide......... 06/12/85 02/10/86 (51 FR Ref 52.200(c)(22).

Mandatory Class I Federal 4910).

Areas.Part II of the Visibility Statewide......... 10/09/87 07/21/88 (53 FR Ref 52.200(c)(25).

Protection Plan. 27514).Good Engineering Practice Stack Statewide......... 06/1/87 02/23/89 (54 FR Ref 52.200(c)(26).

Height Regulations. 7764).Small Business Stationary Statewide......... 11/06/92 03/08/95 (60 FR Ref 52.200(c)(31).

Source Technical and 12691).

Environmental Compliance

Assistance Program.----------------------------------------------------------------------------------------------------------------

EPA-Approved Non-Regulatory Provisions and Quasi-Regulatory Measures in the Arkansas SIP----------------------------------------------------------------------------------------------------------------

State

Applicable submittal/

Name of SIP provision geographic or effective EPA approval date Explanation

nonattainment area date----------------------------------------------------------------------------------------------------------------Emissions Inventory for Crittenden County... 6/22/07 1/15/09 (74 FR

Crittenden County. 2383).8-Hour Ozone Maintenance plan for Crittenden, Shelby 2/26/09 3/24/10 (75 FR

the Crittenden County, Arkansas County. 14077).

Area.Interstate Transport for the 1997 Statewide........... 3/28/08 3/12/12 (77 FR Noninterference with

ozone and PM2.5 NAAQS 14604). measures required

(Noninterference with measures to protect

required to protect visibility visibility in any

in any other State). other State

partially approved

3/12/12.Regional Haze SIP................ Statewide........... 9/23/08, 8/3/ 3/12/12 (77 FR The following

10 14604). portions are

partially approved

and partially

disapproved:

(a) Identification of (a) Identification

affected Class I areas. of best available

retrofit technology

(BART) eligible

sources and subject

to BART sources;

(b) Determination of baseline (b) requirements for

and natural visibility best available

conditions. retrofit technology

(BART);

(c) Determination of the (c) the Arkansas

Uniform Rate of Progress. Regional Haze Rule;

and

(d) Reasonable progress goal (d) Long Term

consultation and long term Strategy. (See Sec.

strategy consultation. 52.173(a)).

(e) Coordination regional

haze and reasonably

attributable visibility

impairment.

(f) Monitoring Strategy and

other implementation

requirements.

(g) Commitment to submit

periodic Regional Haze SIP

revisions and periodic

progress reports describing

progress towards the

reasonable progress goals.

(h) Commitment to make a

determination of the

adequacy of the existing SIP

at the time a progress

report is submitted.

(i) Coordination with States

and Federal Land Managers.

(j) The following best

available retrofit

technology (BART)

determinations: PM BART

determination for the AEP

Flint Creek Plant Boiler No.

1; SO2 and PM BART

determinations for the

natural gas firing scenario

for the Entergy Lake

Catherine Plant Unit 4; PM

BART determinations for both

the bituminous and sub-

bituminous coal firing

scenarios for the Entergy

White Bluff Plant Units 1

and 2; and PM BART

determination for the Domtar

Ashdown Mill Power Boiler

No. 1.Infrastructure for the 1997 Ozone Statewide........... 12/17/07 8/20/12 (77 FR Approval for CAA

NAAQS. 3/28/08 50033). elements

110(a)(2)(A), (B),

(E), (F), (G), (H),

(K), (L), and (M).

Approval for CAA

elements

110(a)(2)(C),

(D)(i)(II)

(interfere with

measures in any

other state to

prevent significant

deterioration of

air quality),

(D)(ii), and (J)

for the 1997 ozone

NAAQS, except as it

relates to

Greenhouse Gas

(GHG) emissions.Infrastructure for the 1997 and Statewide........... 3/28/08 3/4/2015 (80 FR Approval for CAA

2006 PM2.5 NAAQS. 9/16/09 11573). elements

9/13/2014 110(a)(2)(A), (B),

(E), (F), (G), (H),

(K), (L), and (M)

on 8/20/2012 (77 FR

50033). Approval

for PSD elements

(C), (D)(i)(II)

(interfere with

measures in any

other state to

prevent significant

deterioration of

air quality) and

(J) on March 4,

2015 (80 FR 11573)Interstate transport for the 1997 Statewide........... 4/5/11 8/20/12 (77 FR Approved except as

ozone NAAQS (Noninterference 50033). it relates to GHGs.

with measures required to

prevent significant

deterioration of air quality in

any other State).

Interstate transport for the 1997 Statewide........... 12/17/2007 8/29/2013 (78 FR ....................

and 2006 PM2.5 NAAQS (contribute 9/16/2009 53269).

to nonattainment or interfere

with maintenance).---------------------------------------------------------------------------------------------------------------- [63 FR 56927, Oct. 23, 1998, as amended at 65 FR 61107, Oct. 16, 2000; 66 FR 51316, Oct. 9, 2001; 71 FR 13545, Mar. 16, 2006; 72 FR 18396, Apr. 12, 2007; 72 FR 54561, Sept. 26, 2007; 74 FR 2386, Jan. 15, 2009; 75 FR 14080, Mar. 24, 2010; 77 FR 14675, 14676, Mar. 12, 2012; 77 FR 50037, Aug. 20, 2012; 78 FR 19598, Apr. 2, 2013; 78 FR 53270, Aug. 29, 2013; 80 FR 11574, Mar. 4, 2015; 80 FR 24218, Apr. 30, 2015]