Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 52  /  Sec. 52.50 Identification of plan.

(a) Purpose and scope. This section sets forth the applicable State implementation plan for Alabama under section 110 of the Clean Air Act, 42 U.S.C. 7401, and 40 CFR part 51 to meet national ambient air quality standards.

(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to August 1, 2008, for Alabama was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after August 1, 2008, for Alabama will be incorporated by reference in the next update to the SIP compilation.

(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to August 1, 2008, for Alabama was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with EPA approval dates after August 1, 2008, for Alabama will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1).

(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street, SW., Atlanta, GA 30303 the Air and Radiation Docket and Information Center, EPA Headquarters Library, Infoterra Room (Room Number 3334), EPA West Building, 1301 Constitution Ave., NW., Washington, DC 20460, and the National Archives and Records Administration. If you wish to obtain materials from a docket in the EPA Headquarters Library, please call the Office of Air and Radiation (OAR) Docket/Telephone number: (202) 566-1742. For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

(c) EPA Approved Alabama Regulations.

EPA Approved Alabama Regulations----------------------------------------------------------------------------------------------------------------

State

State citation Title/subject effective EPA approval date Explanation

date----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-1 General Provision----------------------------------------------------------------------------------------------------------------Section 335-3-1-.01............... Purpose.............. 6/22/89 3/19/90; 55 FR 10062Section 335-3-1-.02............... Definitions.......... 9/24/13 6/10/14; 79 FR 33116Section 335-3-1-.03............... Ambient Air Quality 10/13/98 3/01/99; 64 FR 9918.

Standards.Section 335-3-1-.04............... Monitoring, Records, 10/15/96 6/06/97; 62 FR 30991

and Reporting.Section 335-3-1-.05............... Sampling and Test 6/22/89 3/19/90; 55 FR 10062

Methods.

Section 335-3-1-.06............... Compliance Schedule.. 10/15/96 6/06/97; 62 FR 30991Section 335-3-1-.07............... Maintenance and 10/15/89 3/19/90; 55 FR 10062

Malfunctioning of

Equipment; Reporting.Section 335-3-1-.08............... Prohibition of Air 8/10/00 12/8/00; 65 FR 76940

Pollution.Section 335-3-1-.09............... Variances............ 10/15/96 6/6/97; 62 FR 30991.Section 335-3-1-.10............... Circumvention........ 6/22/89 3/19/90; 55 FR 10062Section 335-3-1-.11............... Severability......... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-1-.12............... Bubble Provision..... 6/22/89 3/19/90; 55 FR 10062Section 335-3-1-.13............... Credible Evidence.... 4/13/99 11/3/99; 64 FR 59633Section 335-3-1-.14............... Emissions Reporting 4/6/01 7/16/01; 66 FR 36921

Requirements

Relating to Budgets

for NOX Emissions.Section 335-3-1-.15............... Emissions Inventory 4/3/03 4/24/03; 68 FR 20077

Reporting

Requirements.----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-2 Air Pollution Emergency----------------------------------------------------------------------------------------------------------------Section 335-3-2-.01............... Air Pollution 6/22/89 3/19/90; 55 FR 10062

Emergency.Section 335-3-2-.02............... Episode Criteria..... 8/10/00 12/8/00; 65 FR 76940Section 335-3-2-.03............... Special Episode 6/22/89 3/19/90; 55 FR 10062

Criteria.Section 335-3-2-.04............... Emission Reduction 6/22/89 3/19/90; 55 FR 10062

Plans.Section 335-3-2-.05............... Two Contaminant 6/22/89 3/19/90; 55 FR 10062

Episode.Section 335-3-2-.06............... General Episodes..... 6/22/89 3/19/90; 55 FR 10062Section 335-3-2-.07............... Local Episodes....... 6/22/89 3/19/90; 55 FR 10062Section 335-3-2-.08............... Other Sources........ 10/15/96 6/6/97; 62 FR 30991.Section 335-3-2-.09............... Other Authority Not 6/22/89 3/19/90; 55 FR 10062

Affected.----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-3 Control of Open Burning and Incineration----------------------------------------------------------------------------------------------------------------Section 335-3-3-.01............... Open Burning......... 4/4/06 6/22/06; 71 FR 35801Section 335-3-3-.02............... Incinerators......... 6/22/89 3/19/90; 55 FR 10062Section 335-3-3-.03............... Incineration of Wood, 8/10/00 12/8/00; 65 FR 76940

Peanut, and Cotton

Ginning Waste.----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-4 Control of Particulate Emissions----------------------------------------------------------------------------------------------------------------Section 335-3-4-.01............... Visible Emissions.... 10/15/96 4/6/2011; 76 FR

18870.Section 335-3-4-.02............... Fugitive Dust and 10/15/96 6/6/97; 62 FR 30991.

Fugitive Emissions.Section 335-3-4-.03............... Fuel Burning 10/15/96 6/6/97; 62 FR 30991.

Equipment.Section 335-3-4-.04............... Process Industries-- 10/15/96 6/6/97; 62 FR 30991.

General.Section 335-3-4-.05............... Small Foundry Cupola. 6/22/89 3/19/90; 55 FR 10062Section 335-3-4-.06............... Cotton Gins.......... 6/22/89 3/19/90; 55 FR 10062Section 335-3-4-.07............... Kraft Pulp Mills..... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-4-.08............... Wood Waste Boilers... 8/10/00 12/8/00; 65 FR 76940Section 335-3-4-.09............... Coke Ovens........... 8/10/00 12/8/00; 65 FR 76940Section 335-3-4-.10............... Primary Aluminum 6/22/89 3/19/90; 55 FR 10062

Plants.Section 335-3-4-.11............... Cement Plants........ 10/15/96 6/6/97; 62 FR 30991.Section 335-3-4-.12............... Xylene Oxidation 6/22/89 3/19/90; 55 FR 10062

Process.Section 335-3-4-.13............... Sintering Plants..... 6/22/89 3/19/90; 55 FR 10062Section 335-3-4-.14............... Grain Elevators...... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-4-.15............... Secondary Lead 10/15/96 6/6/97; 62 FR 30991.

Smelters.Section 335-3-4-.16............... Reserved.............Section 335-3-4-.17............... Steel Mills Located 10/15/96 6/6/97; 62 FR 30991.

in Etowah County.----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-5 Control of Sulfur Compound Emissions----------------------------------------------------------------------------------------------------------------Section 335-3-5-.01............... Fuel Combustions..... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-5-.02............... Sulfuric Acid Plants. 10/15/96 6/6/97; 62 FR 30991.Section 335-3-5-.03............... Petroleum Production. 8/10/00 12/8/00; 65 FR 76940Section 335-3-5-.04............... Kraft Pulp Mills..... 8/10/00 12/8/00; 65 FR 76940Section 335-3-5-.05............... Process Industries-- 6/22/89 3/19/90; 55 FR 10062

General.Section 335-3-5-.06............... State Clean Air 4/3/07 10/1/07; 72 FR 55659

Interstate Rule

(CAIR) SO2 Trading

Program General

Provisions.Section 335-3-5-.07............... CAIR Designated 4/3/07 10/1/07; 72 FR 55659

Representative for

CAIR SO2 Sources.Section 335-3-5-.08............... Permits.............. 04/3/07 10/1/07; 72 FR 55659Section 335-3-5-.11............... CAIR SO2 Allowance 04/3/07 10/1/07; 72 FR 55659

Tracking System.Section 335-3-5-.12............... CAIR SO2 Allowance 4/3/07 10/1/07; 72 FR 55659

Transfers.Section 335-3-5-.13............... Monitoring and 4/3/07 10/1/07; 72 FR 55659

Reporting.Section 335-3-5-.14............... CAIR SO2 Opt-in Units 4/3/07 10/1/07; 72 FR 55659----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-6 Control of Organic Emissions----------------------------------------------------------------------------------------------------------------Section 335-3-6-.01............... Applicability........ 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.02............... VOC Water Separation. 6/22/89 3/19/90; 55 FR 10062Section 335-3-6-.03............... Loading and Storage 6/22/89 3/19/90; 55 FR 10062

of VOC.Section 335-3-6-.04............... Fixed-Roof Petroleum 10/15/96 6/6/97; 62 FR 30991.

Liquid Storage

Vessels.Section 335-3-6-.05............... Bulk Gasoline Plants. 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.06............... Bulk Gasoline 8/10/00 12/8/00; 65 FR 76940

Terminals.Section 335-3-6-.07............... Gasoline Dispensing 10/15/96 6/6/97; 62 FR 30991.

Facilities--Stage I.Section 335-3-6-.08............... Petroleum Refinery 6/22/89 3/19/90; 55 FR 10062

Sources.Section 335-3-6-.09............... Pumps and Compressors 6/22/89 3/19/90; 55 FR 10062Section 335-3-6-.10............... Ethylene Producing 6/22/89 3/19/90; 55 FR 10062

Plants.Section 335-3-6-.11............... Surface Coating...... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.12............... Solvent Metal 10/15/96 06/6/97; 62 FR 30991

Cleaning.Section 335-3-6-.13............... Cutback Asphalt...... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.14............... Petition for 6/22/89 3/19/90; 55 FR 10062

Alternative Controls.Section 335-3-6-.15............... Compliance Schedules. 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.16............... Test Methods and 8/10/00 12/8/00; 65 FR 76940

Procedures.Section 335-3-6-.17............... Manufacture of 10/15/96 6/6/97; 62 FR 30991.

Pneumatic Tires.Section 335-3-6-.18............... Manufacture of 10/15/96 6/6/97; 62 FR 30991.

Synthesized

Pharmaceutical

Products.Section 335-3-6-.19............... Reserved.............Section 335-3-6-.20............... Leaks from Gasoline 10/15/96 6/6/97; 62 FR 30991.

Tank Trucks and

Vapor Collection

Systems.Section 335-3-6-.21............... Leaks from Petroleum 10/15/96 6/6/97; 62 FR 30991.

Refinery Equipment.Section 335-3-6-.22............... Graphic Arts......... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.23............... Petroleum Liquid 10/15/96 6/6/97; 62 FR 30991.

Storage in External

Floating Roof Tanks.Section 335-3-6-.24............... Applicability........ 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.25............... VOC Water Separation. 6/22/89 3/19/90; 55 FR 10062Section 335-3-6-.26............... Loading and Storage 6/22/89 3/19/90; 55 FR 10062

of VOC.Section 335-3-6-.27............... Fixed-Roof Petroleum 10/15/96 6/6/97; 62 FR 30991.

Liquid Storage

Vessels.Section 335-3-6-.28............... Bulk Gasoline Plants. 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.29............... Gasoline Terminals... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.30............... Gasoline Dispensing 10/15/96 6/6/97; 62 FR 30991.

Facilities Stage 1.Section 335-3-6-.31............... Petroleum Refinery 6/22/89 3/19/90; 55 FR 10062

Sources.Section 335-3-6-.32............... Surface Coating...... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.33............... Solvent Metal 6/22/89 3/19/90; 55 FR 10062

Cleaning.Section 335-3-6-.34............... Cutback Asphalt...... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.35............... Petition for 6/22/89 3/19/90; 55 FR 10062

Alternative Controls.Section 335-3-6-.36............... Compliances Schedules 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.37............... Test Methods and 10/15/96 6/6/97; 62 FR 30991.

Procedures.Section 335-3-6-.38............... Manufacture of 6/22/89 3/19/90; 55 FR 10062

Pneumatic Tires.Section 335-3-6-.39............... Manufacture of 10/15/96 6/6/97; 62 FR 30991.

Synthesized

Pharmaceutical

Products.Section 335-3-6-.40............... Reserved.............Section 335-3-6-.41............... Leaks from Gasoline 10/15/96 6/6/97; 62 FR 30991.

Tank Trucks and

Vapor Collection

Systems.Section 335-3-6-.42............... Leaks from Petroleum 10/15/96 6/6/97; 62 FR 30991.

Refinery Equipment.Section 335-3-6-.43............... Graphic Arts......... 6/22/89 3/19/90; 55 FR 10062Section 335-3-6-.44............... Petroleum Liquid 10/15/96 6/6/97; 62 FR 30991.

Storage in External

Floating Roof Tanks.Section 335-3-6-.45............... Large Petroleum Dry 10/15/96 6/6/97; 62 FR 30991.

Cleaners.Section 335-3-6-.46............... Aerospace Assembly 6/22/89 6/6/97; 62 FR 30991.

and Component and

Component Coatings

Operation.Section 335-3-6-.47............... Leaks from Coke by- 10/15/96 6/6/97; 62 FR 30991.

Product Recovery

Plant Equipment.Section 335-3-6-.48............... Emissions from Coke 10/15/96 6/6/97; 62 FR 30991.

by-Product Recovery

Plant Coke Oven Gas

Bleeder.Section 335-3-6-.49............... Manufacture of 6/22/89 3/19/90; 55 FR 10062

Laminated

Countertops.Section 335-3-6-.50............... Paint Manufacture.... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-6-.53............... List of EPA Approved 6/26/91 9/27/91; 58 FR 50262

and Equivalent Test

Methods and

Procedures for the

Purpose of

Determining VOC

Emissions.----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-7 Carbon Monoxide Emissions----------------------------------------------------------------------------------------------------------------Section 335-3-7-.01............... Metals Productions... 6/22/89 3/19/90; 55 FR 10062Section 335-3-7-.02............... Petroleum Processes.. 6/22/89 3/19/90; 55 FR 10062----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-8 Nitrogen Oxides Emissions----------------------------------------------------------------------------------------------------------------Section 335-3-8-.01............... Standards for 4/6/01 7/17/01; 66 FR 36921

Portland Cement

Kilns.Section 335-3-8-.02............... Nitric Acid 10/15/96 6/6/97; 62 FR 30991.

Manufacturing.Section 335-3-8-.03............... NOX Emissions from 10/24/00 11/7/01; 66 FR 56223

Electric Utility

Generating Units.Section 335-3-8-.04............... Standards for 3/22/05 12/28/05; 70 FR

Stationary 76694.

Reciprocating

Internal Combustion

Engines (Reserved).Section 335-3-8-.05............... NOX Budget Trading 4/3/07 10/1/07; 72 FR 55659

Program.Section 335-3-8-.06............... Authorized Account 4/6/01 7/16/01; 66 FR 36921

Representative for

NOX Budget Sources.Section 335-3-8-.07............... Permits.............. 4/6/01 7/16/01; 66 FR 36921Section 335-3-8-.08............... Compliance 4/6/01 7/16/01; 66 FR 36921

Certification.Section 335-3-8-.09............... NOX Allowance 4/6/01 7/16/01; 66 FR 36921

Allocations.Section 335-3-8-.10............... NOX Allowance 4/3/07 10/1/07; 72 FR 55659

Tracking System.Section 335-3-8-.11............... NOX Allowance 4/6/01 7/16/01; 66 FR 36921

Transfers.Section 335-3-8-.12............... Monitoring and 4/6/01 7/16/01; 66 FR 36921

Reporting.Section 335-3-8-.13............... Individual Unit Opt- 4/6/01 7/16/01; 66 FR 36921

ins.Section 335-3-8-.14............... New Combustion 4/6/01 7/16/01; 66 FR 36921

Sources.Section 335-3-8-.16............... CAIR NOX Annual 4/3/07 10/1/07; 72 FR 55659

Budget Trading

Program.Section 335-3-8-.17............... CAIR Designated 4/3/07 10/1/07; 72 FR 55659

Representative for

CAIR NOX Sources.Section 335-3-8-.18............... CAIR Permits......... 4/3/07 10/1/07; 72 FR 55659Section 335-3-8-.20............... CAIR NOX Allowance 4/3/07 10/1/07; 72 FR 55659

Allocations.Section 335-3-8-.21............... CAIR NOX Allowance 4/3/07 10/1/07; 72 FR 55659

Tracking System.Section 335-3-8-.23............... CAIR Monitoring and 4/3/07 10/1/07; 72 FR 55659

Reporting.Section 335-3-8-.24............... CAIR NOX Opt-in Units 4/3/07 10/1/07; 72 FR 55659Section 335-3-8-.25............... CAIR NOX Ozone Season 4/3/07 10/1/07; 72 FR 55659

Trading Program.Section 335-3-8-.26............... CAIR Designated 4/3/07 10/1/07; 72 FR 55659

Representative for

CAIR NOX Ozone

Season Sources.Section 335-3-8-.27............... CAIR NOX Ozone Season 4/3/07 10/1/07; 72 FR 55659

Permits.Section 335-3-8-.29............... CAIR NOX Ozone Season 4/3/07 10/1/07; 72 FR 55659

Allowance

Allocations.Section 335-3-8-.30............... CAIR NOX Ozone Season 4/3/07 10/1/07; 72 FR 55659

Allowance Tracking

System.Section 335-3-8-.32............... CAIR NOX Ozone Season 4/3/07 10/1/07; 72 FR 55659

Monitoring and

Reporting.Section 335-3-8-.33............... CAIR NOX Ozone Season 4/3/07 10/1/07; 72 FR 55659

Opt-in Units.----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-9 Control of Emissions from Motor Vehicles----------------------------------------------------------------------------------------------------------------Section 335-3-9-.01............... Visible Emission 10/15/96 6/6/97; 62 FR 30991.

Restriction for

Motor Vehicles.Section 335-3-9-.02............... Ignition System and 8/10/00 12/8/00; 65 FR 76940

Engine Speed.Section 335-3-9-.03............... Crankcase Ventilation 8/10/00 12/8/00; 65 FR 76940

Systems.Section 335-3-9-.04............... Exhaust Emission 6/22/89 3/19/90; 55 FR 10062

Control Systems.Section 335-3-9-.05............... Evaporative Loss 6/22/89 3/19/90; 55 FR 10062

Control Systems.Section 335-3-9-.06............... Other Prohibited Acts 8/10/00 12/8/00; 65 FR 76940Section 335-3-9-.07............... Effective Date....... 10/15/96 6/6/97; 62 FR 30991.----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-12 Continuous Monitoring Requirements for Existing Sources----------------------------------------------------------------------------------------------------------------Section 335-3-12-.01.............. General.............. 6/22/89 3/19/90; 55 FR 10062Section 335-3-12-.02.............. Emission Monitoring 2/17/98 9/14/98; 63 FR 49005

and Reporting

Requirements.Section 335-3-12-.03.............. Monitoring System 6/22/89 3/19/90; 55 FR 10062

Malfunction.Section 335-3-12-.04.............. Alternate Monitoring 6/22/89 3/19/90; 55 FR 10062

and Reporting

Requirements.Section 335-3-12-.05.............. Exemptions and 6/22/89 3/19/90; 55 FR 10062

Extensions.----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-13 Control of Fluoride Emissions----------------------------------------------------------------------------------------------------------------Section 335-3-13-.01.............. General.............. 10/15/96 6/6/97; 62 FR 30991.

Section 335-3-13-.02.............. Superphosphoric Acid 10/15/96 06/6/97; 62 FR 30991

Plants.Section 335-3-13-.03.............. Diammonium Phosphate 10/15/96 6/6/97; 62 FR 30991.

Plants.Section 335-3-13-.04.............. Triple 10/15/96 6/6/97; 62 FR 30991.

Superphosphoric

Plants.Section 335-3-13-.05.............. Granular Triple 10/15/96 6/6/97; 62 FR 30991.

Superphosphoric

Storage Facilities.Section 335-3-13-.06.............. Wet Process 10/15/96 6/6/97; 62 FR 30991.

Phosphoric Acid

Plants.----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-14 Air Permits----------------------------------------------------------------------------------------------------------------Section 335-3-14-.01.............. General Provisions... 2/17/98 9/14/98; 63 FR 49008Section 335-3-14-.02.............. Permit Procedures.... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-14-.03.............. Standards for 5/23/11 9-26-12; 77 FR

Granting Permits. 59100..Section 335-3-14-.04.............. Air Permits 5/23/11 9-26-12; 77 FR As of Sept. 26, 2012

Authorizing 59100.. Section 335-3-14-

Construction in .04 does not

Clean Air Areas include Alabama's

[:prevention of revision to adopt

Significant the PM2.5 SILs

Deterioration (PSD)]. threshold and

provisions (as

promulgated in the

October 20, 2010

PM2.5 PSD Increment-

SILs-SMC Rule at 40

CFR 1.166(k)(2) and

the term

``particulate

matter emissions''

(as promulgated in

the May 16, 2008

NSR PM2.5 Rule (at

40 CFR

51.166(b)(49)(vi)).Section 335-3-14-.05.............. Air Permits 8/10/00 12/8/00; 65 FR 76940

Authorizing

Construction in or

Near Nonattainment

Areas.----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-15 Synthetic Minor Operating Permits----------------------------------------------------------------------------------------------------------------Section 335-3-15-.01.............. Definitions.......... 10/15/96 6/6/97; 62 FR 30991.Section 335-3-15-.02.............. General Provisions... 8/10/00 12/8/00; 65 FR 76940Section 335-3-15-.03.............. Applicability........ 11/23/93 10/20/94; 59 FR

52916.Section 335-3-15-.04.............. Synthetic Minor 10/15/96 6/6/97; 62 FR 30991.

Operating Permit

Requirements.Section 335-3-15-.05.............. Public Participation. 10/15/96 6/6/97; 62 FR 30991.----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-17 Conformity of Federal Actions to State Implementation Plans----------------------------------------------------------------------------------------------------------------Section 335-3-17.01............... Transportation 5/23/11 9-26-12; 77 FR

Conformity. 59100..Section 335-3-17-.02.............. General Conformity... 5/23/11 9-26-12; 77 FR

59100..----------------------------------------------------------------------------------------------------------------

Chapter No. 335-3-20 Reserved----------------------------------------------------------------------------------------------------------------Section 335-3-20-.01.............. Reserved............. 4/3/12 4/20/12; 77 FR ....................

23619.Section 335-3-20-.02.............. Reserved............. 4/3/12 4/20/12; 77 FR ....................

23619.Section 335-3-20-.03.............. Reserved............. 4/3/12 4/20/12; 77 FR ....................

23619.----------------------------------------------------------------------------------------------------------------

(d) EPA approved Alabama source specific requirements.

EPA Approved Alabama Source-Specific Requirements----------------------------------------------------------------------------------------------------------------

State effective

Name of source Permit No. date EPA approval date Explanation----------------------------------------------------------------------------------------------------------------Lafarge Cement Kiln.......... AB70004--1--01.. 2/6/2008 7/30/2009; 74 FR 37945 Certain provisions

of the permit.Lehigh Cement Kiln........... 4-07-0290-03.... 2/6/2008 7/30/2009; 74 FR 37945 Certain provisions

of the permit.----------------------------------------------------------------------------------------------------------------

(e) EPA Approved Alabama Non-Regulatory Provisions.

EPA Approved Alabama Non-Regulatory Provisions----------------------------------------------------------------------------------------------------------------

Applicable State submittal

Name of nonregulatory SIP geographic or date/effective EPA approval date Explanation

provision nonattainment area date----------------------------------------------------------------------------------------------------------------Attainment Plan for the Alabama A portion of 10/07/09 10/05/12; 77 FR

Portion of the Chattanooga 1997 Jackson County, 60904.

Annual PM2.5 Nonattainment Area. Alabama.Birmingham 1990 Baseline Birmingham Ozone 11/13/92 6/4/99; 64 FR

Emissions Inventory. Nonattainment Area. 29961.Alabama Interagency 1/20/00 5/11/00; 65 FR

Transportation Conformity 30362.

Memorandum of Agreement.Alabama Fuel Waiver Request-- Birmingham Ozone 12/1/00 11/7/01; 66 FR

Appendix II of Attainment Nonattainment Area. 56220.

Demonstration of the 1-hour

NAAQS for Ozone for the

Birmingham Nonattainment Area.Attainment Demonstration of the Birmingham Ozone 12/1/00 11/7/01; 66 FR

1-hour NAAQS for Ozone for the Nonattainment Area. 56224.

Birmingham Nonattainment Area.Maintenance Plan for the Jefferson County 1/30/04 3/12/04; 69 FR

Birmingham area. and Shelby County. 11800.8-Hour Ozone Maintenance plan Jefferson County 1/26/06 5/12/06...........

for the Birmingham area. and Shelby County.Conformity SIP for Birmingham Jefferson County, 12/12/08 3/26/09; 74 FR

and Jackson County. Shelby County, 13118.

Jackson County.110(a)(1) and (2) Infrastructure Alabama............ 12/10/07 7/13/11; 76 FR For the 1997 8-

Requirements for the 1997 8- 41088. hour ozone NAAQS.

Hour Ozone National Ambient Air

Quality Standards.Chattanooga; Fine Particulate Jackson County..... 7/31/09 2/8/12; 77 FR 6467

Matter 2002 Base Year Emissions

Inventory.Regional haze plan.............. Statewide.......... 7/15/08 6/28/12........... 77 FR 38515.110(a)(1) and (2) Infrastructure Alabama............ 7/25/08 10/1/12; 77 FR With the exception

Requirements for 1997 Fine 59755. of sections

Particulate Matter National 110(a)(2)(D)(i)

Ambient Air Quality Standards. and

110(a)(2)(E)(ii).110(a)(1) and (2) Infrastructure Alabama............ 9/23/09 10/1/12; 77 FR With the exception

Requirements for 2006 Fine 59755. of sections

Particulate Matter National 110(a)(2)(D)(i)

Ambient Air Quality Standards. and

110(a)(2)(E)(ii).1997 Annual PM2.5 Maintenance Birmingham PM2.5 5/2/11 1/22/13, 78 FR

Plan for the Birmingham Area. Nonattainment Area. 4341.2006 24-hour PM2.5 Maintenance Birmingham PM2.5 6/17/10 1/25/13, 78 FR

Plan for the Birmingham Area. Nonattainment Area. 5306.110(a)(1) and (2) Infrastructure Alabama............ 7/25/08 4/12/13, 78 FR Addressing element

Requirements for 1997 Fine 21841. 110(a)(2)(D)(i)(I

Particulate Matter National I) prong 3 only

Ambient Air Quality Standards.110(a)(1) and (2) Infrastructure Alabama............ 9/23/09 4/12/13, 78 FR Addressing element

Requirements for 2006 Fine 21841. 110(a)(2)(D)(i)(I

Particulate Matter National I) prong 3 only

Ambient Air Quality Standards.2008 Lead Attainment Troy Area.......... 11/9/12 1/28/14, 79 FR

Demonstration for Troy Area. 4407.

110(a)(1) and (2) Infrastructure Alabama............ 7/25/2008 5/7/2014, 79 FR Addressing prong 4

Requirements for 1997 Fine 26143. of section

Particulate Matter National 110(a)(2)(D)(i)

Ambient Air Quality Standards. only.110(a)(1) and (2) Infrastructure Alabama............ 9/23/2009 5/7/2014, 79 FR Addressing prong 4

Requirements for 2006 Fine 26143. of section

Particulate Matter National 110(a)(2)(D)(i)

Ambient Air Quality Standards. only.1997 Annual PM2.5 Maintenance Portion of Jackson 04/23/13 12/22/14, 79 FR

Plan for the Alabama portion of County in the 76235.

the Chattanooga TN-GA-AL Area. Chattanooga TN-GA-

AL Area.110(a)(1) and (2) Infrastructure Alabama............ 11/4/2011 3/18/2015, 80 FR Addressing the PSD

Requirements for the 2008 Lead 14019. permitting

NAAQS. requirements of

sections

110(a)(2)(C),

110(a)(2)(D)(i)(I

I) (prong 3) and

110(a)(2)(J)

only.110(a)(1) and (2) Infrastructure Alabama............ 8/20/2012 3/18/2015, 80 FR Addressing the PSD

Requirements for the 2008 Ozone 14019. permitting

NAAQS. requirements of

sections

110(a)(2)(C),

110(a)(2)(D)(i)(I

I) (prong 3) and

110(a)(2)(J)

only.110(a)(1) and (2) Infrastructure Alabama............ 4/23/2013 3/18/2015, 80 FR Addressing the PSD

Requirements for the 2010 NO2 14019. permitting

NAAQS. requirements of

sections

110(a)(2)(C),

110(a)(2)(D)(i)(I

I) (prong 3) and

110(a)(2)(J)

only.Non-interference Demonstration Jefferson and 11/14/2014 4/17/2015, 80 FR ..................

for Federal Low-Reid Vapor Shelby Counties. 21170.

Pressure Requirement for the

Birmingham Area.110(a)(1) and (2) Infrastructure 7/17/2012.......... 4/2/2015 80 FR 17689....... With the exception

Requirements for the 2008 8- of PSD permitting

Hour Ozone National Ambient Air requirements for

Quality Standards. major sources of

sections

110(a)(2)(C) and

(J); interstate

transport

requirements of

section

110(a)(2)(D)(i)(I

) and (II),

110(a)(2)(E)(ii),

and the

visibility

requirements of

section

110(a)(2)(J).---------------------------------------------------------------------------------------------------------------- [63 FR 70672, Dec. 22, 1998]

Editorial Note: For Federal Register citations affecting Sec. 52.50, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.fdsys.gov.