(a) This subpart can be implemented and enforced by the U.S. EPA or a delegated authority such as a State, local, or tribal agency. If the U.S. EPA Administrator has delegated authority to a State, local, or tribal agency, then that Agency has the authority to implement and enforce this subpart. You should contact your U.S. EPA Regional Office to find out if this subpart is delegated to your State, local, or tribal agency.
(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under 40 CFR part 63, subpart E, the authorities contained in paragraphs (c) and (d) of this section are retained by the Administrator of the U.S. EPA and are not transferred to the State, local, or tribal agency.
(c) For primary zinc production facilities subject to this subpart, the authorities that will not be delegated to State, local, or tribal agencies are listed in paragraphs (c)(1) through (5) of this section.
(1) Approval of an alternative non-opacity emissions standard under Sec. 63.6(g).
(2) Approval of an alternative opacity emissions standard under Sec. 63.6(h)(9).
(3) Approval of a major change to test methods under Sec. 63.7(e)(2)(ii) and (f). A ``major change to test method'' is defined in Sec. 63.90
(4) Approval of a major change to monitoring under Sec. 63.8(f). A ``major change to monitoring'' is defined in Sec. 63.90.
(5) Approval of a major change to recordkeeping/reporting under Sec. 63.10(f). A ``major change to recordkeeping/reporting'' is defined in Sec. 63.90.
(d) For primary beryllium manufacturing facilities subject to this subpart, the authorities that will not be delegated to State, local, or tribal agencies are listed in paragraphs (d)(1) through (4) of this section.
(1) Approval of an alternative non-opacity emissions standard under 40 CFR 61.12(d).
(2) Approval of a major change to test methods under 40 CFR 61.13(h). A ``major change to test method'' is defined in Sec. 63.90.
(3) Approval of a major change to monitoring under 40 CFR 61.14(g). A ``major change to monitoring'' is defined in Sec. 63.90.
(4) Approval of a major change to recordkeeping/reporting under 40 CFR 61.10. A ``major change to recordkeeping/reporting'' is defined in Sec. 63.90.
Sec. Table 1 to Subpart GGGGGG of Part 63--Applicability of General
Provisions to Primary Zinc Production Area Sources
As required in Sec. 63.11164(a) and (b), you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as shown in the following table. ----------------------------------------------------------------------------------------------------------------
Citation Subject Applies to subpart GGGGGG Explanation----------------------------------------------------------------------------------------------------------------63.1(a)(1), (a)(2), (a)(3), (a)(4), Applicability......... Yes.
(a)(6), (a)(10)-(a)(12), (b)(1),
(6), (a)(10)-(a)(12), (b)(1),
(b)(3), (c)(1), (c)(2), (c)(5),
(3), (c)(1), (c)(2), (c)(5),
(e).63.1(a)(5), (a)(7)-(a)(9), (b)(2), Reserved.............. No.
(c)(3), (c)(4), (d).63.2............................... Definitions........... Yes.63.3............................... Units and Yes.
(3), (c)(4), (d).63.2............................... Definitions........... Yes.63.3............................... Units and Yes.
Abbreviations.63.4............................... Prohibited Activities Yes.
and Circumvention.63.5............................... Preconstruction Review No.
and Notification
Requirements.63.6(a), (b)(1)-(b)(5), (b)(7), Compliance with Yes.
(c)(1), (c)(2), (c)(5). Standards and
(1), (c)(2), (c)(5). Standards and
Maintenance
Requirements--Applica
bility Compliance
Dates.63.6(e)............................ Operation and Yes/No..................... Operation and
Maintenance maintenance
Requirements. requirements do not
apply to existing
sources except that
the startup,
shutdown, and
malfunction
requirements in Sec.
63.6(e)(3) are
allowed as an
alternative to the
rule requirements for
emergency situations.
Operation and
maintenance
requirements apply to
new sources except
that the rule
requirements for
emergency situations
are allowed as an
alternative to the
startup, shutdown,
and malfunction
requirements in Sec.
63.6(e)(3).63.6(f), (g), (i), (j)............. Compliance with Yes.
Nonopacity Emission
Standards.63.6(b)(6), (c)(3), (c)(4), (d), Reserved.............. No.
(e)(2), (e)(3)(ii), (h)(3),
(2), (e)(3)(ii), (h)(3),
(h)(5)(iv).63.6(h)(1)-(h)(4), (h)(5)(i)- ...................... Yes.
(5)(iv).63.6(h)(1)-(h)(4), (h)(5)(i)- ...................... Yes.
(iv).63.6(h)(1)-(h)(4), (h)(5)(i)- ...................... Yes.
(h)(5)(iii), (h)(6)-(h)(9).63.7(a), (e), (f), (g), (h)........ Performance Testing Yes.
(5)(iii), (h)(6)-(h)(9).63.7(a), (e), (f), (g), (h)........ Performance Testing Yes.
(iii), (h)(6)-(h)(9).63.7(a), (e), (f), (g), (h)........ Performance Testing Yes.
Requirements.63.7(b), (c)....................... ...................... Yes/No..................... Notification of
performance tests and
quality assurance
program apply to new
sources but not
existing sources.
63.8(a)(1), (a)(2), (b), (c), (f), Monitoring Yes........................ Requirements in Sec.
(g). Requirements. 63.6(c)(4)(i)-(ii),
(c)(5), (c)(6), (d),
(5), (c)(6), (d),
(e), (f)(6), and (g)
apply if a COMS is
used.63.8(a)(3)......................... Reserved.............. No.63.8(a)(4)......................... ...................... No......................... Subpart GGGGGG does
not require flares.63.8(d), (e)....................... ...................... Yes/No..................... Requirements for
quality control
program and
performance
evaluations apply to
new sources but not
existing sources.63.9(a), (b)(1), (b)(2), (b)(5), Notification Yes/No..................... Notification of
(c), (d), (f), (g), (h)(1)-(h)(3), Requirements. performance tests and
(h)(5), (h)(6), (i), (j). opacity or visible
(5), (h)(6), (i), (j). opacity or visible
emissions
observations apply to
new sources but not
existing sources.63.9(b)(3), (h)(4)................. Reserved.............. No.63.9(b)(4)......................... ...................... No.63.10(a), (b)(1), (b)(2)(i)-(v), Recordkeeping and Yes.
(d)(4), (d)(5)(i), (f). Reporting
(4), (d)(5)(i), (f). Reporting
Requirements.63.10(b)(2), (b)(3), (c)(1), (c)(5)- ...................... Yes/No..................... Recordkeeping and
(c)(8), (c)(10)-(c)(15), (d)(1)- reporting
(8), (c)(10)-(c)(15), (d)(1)- reporting
(d)(3), (d)(5)(ii), (e)(1), requirements apply to
(3), (d)(5)(ii), (e)(1), requirements apply to
(e)(2), (e)(4). new sources but not
(2), (e)(4). new sources but not
existing sources.63.10(c)(2)-(c)(4), (c)(9)......... Reserved.............. No.63.10(e)(3)........................ ...................... Yes/No..................... Reporting requirements
apply to new sources
but not existing
sources.63.11.............................. Control Device No......................... Subpart GGGGGG does
Requirements. not require flares.63.12.............................. State Authorities and Yes.
Delegations.63.13.............................. Addresses............. Yes.63.14.............................. Incorporations by Yes.
Reference.63.15.............................. Availability of Yes.
Information and
Confidentiality.63.16.............................. Performance Track Yes.
Provisions.---------------------------------------------------------------------------------------------------------------- Subpart HHHHHH_National Emission Standards for Hazardous Air Pollutants:
Paint Stripping and Miscellaneous Surface Coating Operations at Area
Sources
Source: 73 FR 1759, Jan. 9, 2008, unless otherwise noted.
What This Subpart Covers