(a) This subpart can be implemented and enforced by the U.S. EPA or a delegated authority such as a State, local, or tribal agency. If the U.S. EPA Administrator has delegated authority to a State, local, or Tribal agency pursuant to 40 CFR part 63, subpart E, then that Agency has the authority to implement and enforce this subpart. You should contact your U.S. EPA Regional Office to find out if this subpart is delegated to a State, local, or tribal agency within your State.
(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under 40 CFR part 63, subpart E, the approval authorities contained in paragraphs (b)(1) through (4) of this section are retained by the Administrator of the U.S. EPA and are not transferred to the State, local, or tribal agency.
(1) Approval of an alternative non-opacity emissions standard under Sec. 63.6(g).
(2) Approval of a major change to a test method under Sec. 63.7(e)(2)(ii) and (f). A ``major change to test method'' is defined in Sec. 63.90.
(3) Approval of a major change to monitoring under Sec. 63.8(f). A ``major change to monitoring'' is defined in Sec. 63.90.
(4) Approval of a major change to recordkeeping/ reporting under Sec. 63.10(f). A ``major change to recordkeeping/reporting'' is defined in Sec. 63.90.
As required in Sec. 63.11397(a), you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as shown in the following table. [72 FR 38899, July 16, 2007, as amended at 73 FR 15928, Mar. 26, 2008]
Sec. Table 1 to Subpart LLLLLL of Part 63--Applicability of General
Provisions to Subpart LLLLLL ----------------------------------------------------------------------------------------------------------------
Citation Subject Applies to subpart LLLLLL? Explanation----------------------------------------------------------------------------------------------------------------63.1(a)(1), (a)(2), (a)(3), (a)(4), Applicability......... Yes........................
(a)(6), (a)(10)-(a)(12) (b)(1),
(6), (a)(10)-(a)(12) (b)(1),
(b)(3), (c)(1), (c)(2), (c)(5),
(3), (c)(1), (c)(2), (c)(5),
(e).63.1(a)(5), (a)(7)-(a)(9), (b)(2), Reserved.............. No.........................
(c)(3), (c)(4), (d).63.2............................... Definitions........... Yes........................63.3............................... Units and Yes........................
(3), (c)(4), (d).63.2............................... Definitions........... Yes........................63.3............................... Units and Yes........................
Abbreviations.63.4............................... Prohibited Activities Yes........................
and Circumvention.63.5............................... Preconstruction Review No.........................
and Notification
Requirements.63.6(a), (b)(1)-(b)(5), (b)(7), Compliance with Yes........................ Subpart LLLLLL
(c)(1), (c)(2), (c)(5), (e)(1), Standards and requires new and
(1), (c)(2), (c)(5), (e)(1), Standards and requires new and
(e)(3)(i), (e)(3)(iii)-(e)(3)(ix), Maintenance existing sources to
(3)(i), (e)(3)(iii)-(e)(3)(ix), Maintenance existing sources to
(i), (e)(3)(iii)-(e)(3)(ix), Maintenance existing sources to
(f) (g), (i), (j). Requirements. comply with
requirements for
startups, shutdowns,
and malfunctions in
Sec. 63.6(e)(3).63.6(b)(6), (c)(3), (c)(4), (d), Reserved.............. No.........................
(e)(2), (e)(3)(ii), (h)(3),
(2), (e)(3)(ii), (h)(3),
(h)(5)(iv).63.6(h)(1)-(h)(4), (h)(5)(i)- ...................... No......................... Subpart LLLLLL does
(5)(iv).63.6(h)(1)-(h)(4), (h)(5)(i)- ...................... No......................... Subpart LLLLLL does
(iv).63.6(h)(1)-(h)(4), (h)(5)(i)- ...................... No......................... Subpart LLLLLL does
(h)(5)(iii), (h)(6)-(h)(9). not include opacity
(5)(iii), (h)(6)-(h)(9). not include opacity
(iii), (h)(6)-(h)(9). not include opacity
or visible emissions
standards or require
a continuous opacity
monitoring system.63.7(a), (e), (f), (g), (h)........ Performance Testing Yes/No..................... Subpart LLLLLL
Requirements. requires performance
tests for new and
existing sources; a
test for an existing
source is not
required if a prior
test meets the
conditions in Sec.
63.11395(h).63.7(b), (c)....................... ...................... Yes/No..................... Requirements for
notification of
performance test and
for quality assurance
program apply to new
sources but not
existing sources.63.8(a)(1), (a)(2), (b), (c)(1)- Monitoring Yes........................
(c)(3), (f)(1)-(5). Requirements.63.8(a)(3)......................... Reserved.............. No.........................
(3), (f)(1)-(5). Requirements.63.8(a)(3)......................... Reserved.............. No.........................
63.8(a)(4)......................... ...................... Yes........................ Requirements apply to
new sources if flares
are the selected
control option.63.8(c)(4)-(c)(8), (d), (e), ...................... Yes........................ Requirements apply to
(f)(6), (g). new sources but not
(6), (g). new sources but not
to existing sources.63.9(a), (b)(1), (b)(5), (c), (d), Notification Yes........................
(i), (j). Requirements.63.9(e)............................ ...................... Yes/No..................... Notification of
performance test is
required for new area
sources.63.9(b)(2)......................... ...................... Yes........................ Initial notification
of applicability is
required for new and
existing area
sources.63.9(b)(3), (h)(4)................. Reserved.............. No.........................63.9(b)(4), (h)(5)................. ...................... No.........................63.9(f), (g)....................... ...................... No......................... Subpart LLLLLL does
not require a
continuous opacity
monitoring system or
continuous emissions
monitoring system.63.9(h)(1)-(h)(3), (h)(6).......... ...................... Yes........................ Notification of
compliance status is
required for new and
existing area
sources.63.10(a)........................... Recordkeeping Yes........................
Requirements.63.10(b)(1)........................ ...................... Yes/No..................... Record retention
requirement applies
to new area sources
but not existing area
sources. Subpart
LLLLLL establishes 2-
year retention period
for existing area
sources.63.10(b)(2)........................ ...................... Yes........................ Recordkeeping
requirements for
startups, shutdowns,
and malfunctions
apply to new and
existing area
sources.63.10(b)(3)........................ ...................... Yes........................ Recordkeeping
requirements for
applicability
determinations apply
to new area sources.63.10(c)(1), (c)(5)-(c)(14)........ ...................... Yes/No..................... Recordkeeping
requirements for
continuous parameter
monitoring systems
apply to new sources
but not existing
sources.63.10(c)(2)-(c)(4), (c)(9)......... Reserved.............. No.........................63.10(d)(1), (d)(4), (e)(1), Reporting Requirements Yes........................
(e)(2), (f).63.10(d)(2)........................ ...................... Yes........................ Report of performance
(2), (f).63.10(d)(2)........................ ...................... Yes........................ Report of performance
test results applies
to each area source
required to conduct a
performance test.63.10(d)(3)........................ ...................... No......................... Subpart LLLLLL does
not include opacity
or visible emissions
limits.63.10(d)(5)........................ ...................... Yes........................ Requirements for
startup, shutdown,
and malfunction
reports apply to new
and existing area
(1)-(e)(2), (e)(4).............. ...................... No......................... Subpart LLLLLL does
not require a
continuous emissions
monitoring system or
continuous opacity
monitoring system.63.10(e)(3)........................ ...................... Yes/No..................... Semiannual reporting
requirements for
excess emissions and
parameter monitoring
exceedances apply to
new area sources but
not existing area
sources.63.11.............................. Control Device Yes........................ Requirements apply to
Requirements. new sources if flares
are the selected
control option.63.12.............................. State Authorities and Yes........................
Delegations.63.13.............................. Addresses............. Yes........................63.14.............................. Incorporations by Yes........................
Reference.63.15.............................. Availability of Yes........................
Information and
Confidentiality.63.16.............................. Performance Track Yes........................
Provisions..---------------------------------------------------------------------------------------------------------------- Subpart MMMMMM_National Emission Standards for Hazardous Air Pollutants
for Carbon Black Production Area Sources
Source: 72 FR 38904, July 16, 2007, unless otherwise noted.
Applicability and Compliance Dates