(a) This subpart can be implemented and enforced by the U.S. EPA, or a delegated authority such as the applicable State, local, or Tribal agency. If the U.S. EPA Administrator has delegated authority to a State, local, or Tribal agency, then that agency, in addition to the U.S. EPA, has the authority to implement and enforce this subpart. Contact the applicable U.S. EPA Regional Office to find out if this subpart is delegated to a State, local, or Tribal agency.
(b) In delegating implementation and enforcement authority of this subpart to a State, local, or Tribal agency under subpart E of this part, the authorities contained in paragraph (c) of this section are retained by the Administrator of U.S. EPA and cannot be transferred to the State, local, or Tribal agency.
(c) The authorities that cannot be delegated to State, local, or Tribal agencies are as specified in paragraphs (c)(1) through (4) of this section.
(1) Approval of alternatives to the requirements in Sec. Sec. 63.1340, 63.1342 through 63.1348, and 63.1351.
(2) Approval of major alternatives to test methods under Sec. 63.7(e)(2)(ii) and (f), as defined in Sec. 63.90, and as required in this subpart.
(3) Approval of major alternatives to monitoring under Sec. 63.8(f), as defined in Sec. 63.90, and as required in this subpart.
(4) Approval of major alternatives to recordkeeping and reporting under Sec. 63.10(f), as defined in Sec. 63.90, and as required in this subpart.[68 FR 37359, June 23, 2003] Sec. 63.1359 [Reserved]
Sec. Table 1 to Subpart LLL of Part 63--Applicability of General
Provisions ----------------------------------------------------------------------------------------------------------------
Citation Requirement Applies to subpart LLL Explanation----------------------------------------------------------------------------------------------------------------63.1(a)(1)-(4)..................... Applicability......... Yes...................63.1(a)(5)......................... ...................... No.................... [Reserved]63.1(a)(6)-(8)..................... Applicability......... Yes...................63.1(a)(9)......................... ...................... No.................... [Reserved]63.1(a)(10)-(14)................... Applicability......... Yes...................63.1(b)(1)......................... Initial Applicability No.................... Sec. 63.1340 specifies
Determination. applicability.63.1(b)(2)-(3)..................... Initial Applicability Yes...................
Determination.63.1(c)(1)......................... Applicability After Yes...................
Standard Established.63.1(c)(2)......................... Permit Requirements... Yes................... Area sources must obtain
Title V permits.63.1(c)(3)......................... ...................... No.................... [Reserved]63.1(c)(4)-(5)..................... Extensions, Yes.
Notifications.63.1(d)............................ ...................... No.................... [Reserved]63.1(e)............................ Applicability of Yes...................
Permit Program.63.2............................... Definitions........... Yes................... Additional definitions in
Sec. 63.1341.63.3(a)-(c)........................ Units and Yes...................
Abbreviations.63.4(a)(1)-(3)..................... Prohibited Activities. Yes...................63.4(a)(4)......................... ...................... No.................... [Reserved]63.4(a)(5)......................... Compliance date....... Yes...................
63.4(b)-(c)........................ Circumvention, Yes...................
Severability.63.5(a)(1)-(2)..................... Construction/ Yes...................
Reconstruction.63.5(b)(1)......................... Compliance Dates...... Yes...................63.5(b)(2)......................... ...................... No.................... [Reserved]63.5(b)(3)-(6)..................... Construction Approval, Yes...................
Applicability.63.5(c)............................ ...................... No.................... [Reserved]63.5(d)(1)-(4)..................... Approval of Yes...................
Construction/
Reconstruction.63.5(e)............................ Approval of Yes...................
Construction/
Reconstruction.63.5(f)(1)-(2)..................... Approval of Yes...................
Construction/
Reconstruction.63.6(a)............................ Compliance for Yes...................
Standards and
Maintenance.63.6(b)(1)-(5)..................... Compliance Dates...... Yes...................63.6(b)(6)......................... ...................... No.................... [Reserved]63.6(b)(7)......................... Compliance Dates...... Yes...................63.6(c)(1)-(2)..................... Compliance Dates...... Yes...................63.6(c)(3)-(4)..................... ...................... No.................... [Reserved]63.6(c)(5)......................... Compliance Dates...... Yes...................63.6(d)............................ ...................... No.................... [Reserved]63.6(e)(1)-(2)..................... Operation & No.................... See Sec. 63.1348(d) for
Maintenance. general duty requirement.
Any reference to Sec.
63.6(e)(1)(i) in other
General Provisions or in
this subpart is to be
treated as a cross-
reference to Sec.
63.1348(d).63.6(e)(3)......................... Startup, Shutdown No.................... Your operations and
Malfunction Plan. maintenance plan must
address periods of startup
and shutdown. See Sec.
63.1347(a)(1).63.6(f)(1)......................... Compliance with No.................... Compliance obligations
Emission Standards. specified in subpart LLL.63.6(f)(2)-(3)..................... Compliance with Yes...................
Emission Standards.63.6(g)(1)-(3)..................... Alternative Standard.. Yes...................63.6(h)(1)......................... Opacity/VE Standards.. No.................... Compliance obligations
specified in subpart LLL.63.6(h)(2)......................... Opacity/VE Standards.. Yes...................63.6(h)(3)......................... ...................... No.................... [Reserved]63.6(h)(4)-(h)(5)(i)............... Opacity/VE Standards.. Yes...................63.6(h)(5)(ii)-(iv)................ Opacity/VE Standards.. No.................... Test duration specified in
subpart LLL.63.6(h)(6)......................... Opacity/VE Standards.. Yes...................63.6(h)(7)......................... Opacity/VE Standards.. Yes...................63.6(i)(1)-(14).................... Extension of Yes...................
Compliance.63.6(i)(15)........................ ...................... No.................... [Reserved]63.6(i)(16)........................ Extension of Yes...................
Compliance.63.6(j)............................ Exemption from Yes...................
Compliance.63.7(a)(1)-(3)..................... Performance Testing Yes................... Sec. 63.1349 has specific
Requirements. requirements.63.7(b)............................ Notification period... Yes................... Except for repeat
performance test caused by
an exceedance. See Sec.
63.1353(b)(6)63.7(c)............................ Quality Assurance/Test Yes...................
Plan.63.7(d)............................ Testing Facilities.... Yes...................63.7(e)(1)......................... Conduct of Tests...... No.................... See Sec. 63.1349(e). Any
reference to 63.7(e)(1) in
other General Provisions
or in this subpart is to
be treated as a cross-
reference to Sec.
63.1349(e).63.7(e)(2)-(4)..................... Conduct of tests...... Yes...................63.7(f)............................ Alternative Test Yes...................
Method.63.7(g)............................ Data Analysis......... Yes...................63.7(h)............................ Waiver of Tests....... Yes...................63.8(a)(1)......................... Monitoring Yes...................
Requirements.63.8(a)(2)......................... Monitoring............ No.................... Sec. 63.1350 includes
CEMS requirements.63.8(a)(3)......................... ...................... No.................... [Reserved]63.8(a)(4)......................... Monitoring............ No.................... Flares not applicable.63.8(b)(1)-(3)..................... Conduct of Monitoring. Yes...................63.8(c)(1)-(8)..................... CMS Operation/ Yes................... Temperature and activated
Maintenance. carbon injection
monitoring data reduction
requirements given in
subpart LLL.
63.8(d)............................ Quality Control....... Yes, except for the
reference to the SSM
Plan in the last
sentence.63.8(e)............................ Performance Evaluation Yes...................
for CMS.63.8(f)(1)-(5)..................... Alternative Monitoring Yes................... Additional requirements in
Method. Sec. 63.1350(l).63.8(f)(6)......................... Alternative to RATA Yes...................
Test.63.8(g)............................ Data Reduction........ Yes...................63.9(a)............................ Notification Yes...................
Requirements.63.9(b)(1)-(5)..................... Initial Notifications. Yes...................63.9(c)............................ Request for Compliance Yes...................
Extension.63.9(d)............................ New Source Yes...................
Notification for
Special Compliance
Requirements.63.9(e)............................ Notification of Yes................... Except for repeat
performance test. performance test caused by
an exceedance. See Sec.
63.1353(b)(6)63.9(f)............................ Notification of VE/ Yes................... Notification not required
Opacity Test. for VE/opacity test under
Sec. 63.1350(e) and (j).63.9(g)............................ Additional CMS Yes...................
Notifications.63.9(h)(1)-(3)..................... Notification of Yes...................
Compliance Status.63.9(h)(4)......................... ...................... No.................... [Reserved]63.9(h)(5)-(6)..................... Notification of Yes...................
Compliance Status.63.9(i)............................ Adjustment of Yes...................
Deadlines.63.9(j)............................ Change in Previous Yes...................
Information.63.10(a)........................... Recordkeeping/ Yes...................
Reporting.63.10(b)(1)........................ General Recordkeeping Yes...................
Requirements.63.10(b)(2)(i)-(ii)................ General Recordkeeping No.................... See Sec. 63.1355(g) and
Requirements. (h).63.10(b)(2)(iii)................... General Recordkeeping Yes...................
Requirements.63.10(b)(2)(iv)-(v)................ General Recordkeeping No....................
Requirements.63.10(b)(2)(vi)-(ix)............... General Recordkeeping Yes...................
Requirements.63.10(c)(1)........................ Additional CMS Yes................... PS-8A supersedes
Recordkeeping. requirements for THC CEMS.63.10(c)(1)........................ Additional CMS Yes................... PS-8A supersedes
Recordkeeping. requirements for THC CEMS.63.10(c)(2)-(4).................... ...................... No.................... [Reserved]63.10(c)(5)-(8).................... Additional CMS Yes................... PS-8A supersedes
Recordkeeping. requirements for THC CEMS.63.10(c)(9)........................ ...................... No.................... [Reserved]63.10(c)(10)-(15).................. Additional CMS Yes................... PS-8A supersedes
Recordkeeping. requirements for THC CEMS.63.10(d)(1)........................ General Reporting Yes...................
Requirements.63.10(d)(2)........................ Performance Test Yes...................
Results.63.10(d)(3)........................ Opacity or VE Yes...................
Observations.63.10(d)(4)........................ Progress Reports...... Yes...................63.10(d)(5)........................ Startup, Shutdown, No.................... See Sec. 63.1354(c) for
Malfunction Reports. reporting requirements.
Any reference to Sec.
63.10(d)(5) in other
General Provisions or in
this subpart is to be
treated as a cross-
reference to Sec.
63.1354(c).63.10(e)(1)-(2).................... Additional CMS Reports Yes...................63.10(e)(3)........................ Excess Emissions and Yes................... Exceedances are defined in
CMS Performance subpart LLL.
Reports.63.10(f)........................... Waiver for Yes...................
Recordkeeping/
Reporting.63.11(a)-(b)....................... Control Device No.................... Flares not applicable.
Requirements.63.12(a)-(c)....................... State Authority and Yes...................
Delegations.
63.13(a)-(c)....................... State/Regional Yes...................
Addresses.63.14(a)-(b)....................... Incorporation by Yes...................
Reference.63.15(a)-(b)....................... Availability of Yes...................
Information.---------------------------------------------------------------------------------------------------------------- [75 FR 55064, Sept. 9, 2010, as amended at 78 FR 10054, Feb. 12, 2013] Subpart MMM_National Emission Standards for Hazardous Air Pollutants for
Pesticide Active Ingredient Production
Source: 64 FR 33589, June 23, 1999, unless otherwise noted.