Code of Federal Regulations (alpha)

CFR /  Title 40  /  Part 63  /  Sec. 63.2150 What are my general requirements for complying with

(a) You must be in compliance with the emission limitations in Table 1 to this subpart at all times, except during periods of malfunction.

(b) You must always operate and maintain your affected source, including monitoring equipment, according to the provisions in Sec. 63.6(e)(1)(i). If the date upon which you must demonstrate initial compliance as specified in Sec. 63.2160 falls after the compliance date specified for your affected source in Sec. 63.2133, then you must maintain a log detailing the operation and maintenance of the continuous monitoring systems and the process and emissions control equipment during the period between those dates.

(c) You must develop a written malfunction plan. It will be as specified in Sec. 63.6(e)(3), except that the requirements for startup, shutdown, and maintenance plans, records and reports apply only to malfunctions. Under this subpart, a period of malfunction is expressed in whole batches and not in portions of batches. [66 FR 27884, May 21, 2001, as amended at 71 FR 20462, Apr. 20, 2006]

Testing and Initial Compliance Requirements