Table 1 of this section shows which parts of the General Provisions in Sec. Sec. 63.1 through 63.15 apply to you. Table 1 of Sec. 63.2870 follows:

Table 1 to Sec. 63.2870--Applicability of 40 CFR Part 63, Subpart A, to 40 CFR, Part 63, Subpart GGGG----------------------------------------------------------------------------------------------------------------

Subject of Brief description Applies to

General provisions citation citation of requirement subpart Explanation----------------------------------------------------------------------------------------------------------------Sec. 63.1.................... Applicability..... Initial Yes.............. ....................

applicability

determination;

applicability

after standard

established;

permit

requirements;

extensions;

notifications.Sec. 63.2.................... Definitions....... Definitions for Yes.............. Except as

part 63 standards. specifically

provided in this

subpart.Sec. 63.3.................... Units and Units and Yes..............

abbreviations. abbreviations for

part 63 standards.Sec. 63.4.................... Prohibited Prohibited Yes.............. ....................

activities and activities;

circumvention. compliance date;

circumvention;

severability.

Sec. 63.5.................... Construction/ Applicability; Yes.............. Except for

reconstruction. applications; subsections of Sec.

approvals. 63.5 as listed

below.Sec. 63.5(c)................. [Reserved]........ .................. ................. ....................Sec. 63.5(d)(1)(ii)(H)....... Application for Type and quantity No............... All sources emit

approval. of HAP, operating HAP. Subpart GGGG

parameters. does not require

control from

specific emission

points.Sec. 63.5(d)(1)(ii)(I)....... [Reserved]........ .................. ................. ....................Sec. 63.5(d)(1)(iii), (d)(2), .................. Application for No............... The requirements of

(d)(3)(ii). approval. the application for

(3)(ii). approval. the application for

(ii). approval. the application for

approval for new,

reconstructed and

significantly

modified sources

are described in

Sec. 63.2860(b)

and (c) of subpart

GGGG. General

provision

requirements for

identification of

HAP emission points

or estimates of

actual emissions

are not required.

Descriptions of

control and

methods, and the

estimated and

actual control

efficiency of such

do not apply.

Requirements for

describing control

equipment and the

estimated and

actual control

efficiency of such

equipment apply

only to control

equipment to which

the subpart GGGG

requirements for

quantifying.Sec. 63.6.................... Applicability of Applicability..... Yes.............. Except for

General subsections of Sec.

Provisions. 63.6 as listed

below.Sec. 63.6(b)(1)-(3).......... Compliance dates, .................. No............... Section 63.2834 of

new and subpart GGGG

reconstructed specifies the

sources. compliance dates

for new and

reconstructed

sources.Sec. 63.6(b)(6).............. [Reserved]........ .................. ................. ....................Sec. 63.6(c)(3)-(4).......... [Reserved]........ .................. ................. ....................Sec. 63.6(d)................. [Reserved]........ .................. ................. ....................Sec. 63.6(e)(1) through Operation and .................. Yes.............. Minimize emissions

(e)(3)(ii) and Sec. maintenance to the extent

(3)(ii) and Sec. maintenance to the extent

(ii) and Sec. maintenance to the extent

63.6(e)(3)(v) through (vii). requirements. practical.Sec. 63.6(e)(3)(iii)......... Operation and .................. No............... Minimize emissions

maintenance to the extent

requirements. practicalSec. 63.6(e)(3)(iv).......... Operation and .................. No............... Report SSM and in

maintenance accordance with

requirements. Sec. 63.2861(c)

and (d).Sec. 63.6(e)(3)(viii)........ Operation and .................. Yes.............. Except, report each

maintenance revision to your

requirements. SSM plan in

accordance with

Sec. 63.2861(c)

rather than Sec.

63.10(d)(5) as

required under Sec.

63.6(e)(3)

(viii).Sec. 63.6(e)(3)(ix).......... Title V permit.... .................. Yes..............Sec. 63.6(f)-(g)............. Compliance with Comply with No............... Subpart GGGG does

nonopacity emission not have nonopacity

emission standards at all requirements.

standards except times except

during SSM. during SSM.Sec. 63.6(h)................. Opacity/Visible .................. No............... Subpart GGGG has no

emission (VE) opacity or VE

standards. standards.Sec. 63.6(i)................. Compliance Procedures and Yes.............. ....................

extension. criteria for

responsible

agency to grant

compliance

extension.Sec. 63.6(j)................. Presidential President may Yes.............. ....................

compliance exempt source

exemption. category from

requirement to

comply with

subpart.

Sec. 63.7.................... Performance Schedule, Yes.............. Subpart GGGG

testing conditions, requires

requirements. notifications and performance testing

procedures. only if the source

applies additional

control that

destroys solvent.

Section

63.2850(a)(6)

requires sources to

follow the

performance testing

guidelines of the

General Provisions

if a control is

added.Sec. 63.8.................... Monitoring .................. No............... Subpart GGGG does

requirements. not require

monitoring other

than as specified

therein.Sec. 63.9.................... Notification Applicability and Yes.............. Except for

requirements. state delegation. subsections of Sec.

63.9 as listed

below.Sec. 63.9(b)(2).............. Notification Initial No............... Section 63.2860(a)

requirements. notification of subpart GGGG

requirements for specifies the

existing sources. requirements of the

initial

notification for

existing sources.Sec. 63.9(b)(3)-(5).......... Notification Notification Yes.............. Except the

requirements. requirement for information

certain new/ requirements differ

reconstructed as described in

sources. Sec. 63.2860(b)

of subpart GGGG.Sec. 63.9(e)................. Notification of Notify responsible Yes.............. Applies only if

performance test. agency 60 days performance testing

ahead. is performed.Sec. 63.9(f)................. Notification of VE/ Notify responsible No............... Subpart GGGG has no

opacity agency 30 days opacity or VE

observations. ahead. standards.Sec. 63.9(g)................. Additional Notification of No............... Subpart GGGG has no

notifications performance CMS requirements.

when using a evaluation;

continuous Notification

monitoring system using COMS data;

(CMS). notification that

exceeded

criterion for

relative accuracy.Sec. 63.9(h)................. Notification of Contents.......... No............... Section 63.2860(d)

compliance status. of subpart GGGG

specifies

requirements for

the notification of

compliance status.Sec. 63.10................... Recordkeeping/ Schedule for Yes.............. Except for

reporting. reporting, record subsections of Sec.

storage. 63.10 as listed

below.Sec. 63.10(b)(2)(i).......... Recordkeeping..... Record SSM event.. Yes.............. Applicable to

periods when

sources must

implement their SSM

plan as specified

in subpart GGGG.Sec. 63.10(b)(2)(ii)-(iii)... Recordkeeping..... Malfunction of air No............... Applies only if air

pollution pollution control

equipment. equipment has been

added to the

process and is

necessary for the

source to meet the

emission limit.Sec. 63.10(b)(2)(vi)......... Recordkeeping..... CMS recordkeeping. No............... Subpart GGGG has no

CMS requirements.Sec. 63.10(b)(2)(viii)-(ix).. Recordkeeping..... Conditions of Yes.............. Applies only if

performance test. performance tests

are performed.

Subpart GGGG does

not have any CMS

opacity or VE

observation

requirements.Sec. 63.10(b)(2)(x)-(xii).... Recordkeeping..... CMS, performance No............... Subpart GGGG does

testing, and not require CMS.

opacity and VE

observations

recordkeeping.Sec. 63.10(c)................ Recordkeeping..... Additional CMS No............... Subpart GGGG does

recordkeeping. not require CMS.Sec. 63.10(d)(2)............. Reporting......... Reporting Yes.............. Applies only if

performance test performance testing

results. is performed.Sec. 63.10(d)(3)............. Reporting......... Reporting opacity No............... Subpart GGGG has no

or VE opacity or VE

observations. standards.Sec. 63.10(d)(4)............. Reporting......... Progress reports.. Yes.............. Applies only if a

condition of

compliance

extension exists.Sec. 63.10(d)(5)............. Reporting......... SSM reporting..... No............... Section 63.2861(c)

and (d) specify SSM

reporting

requirements.Sec. 63.10(e)................ Reporting......... Additional CMS No............... Subpart GGGG does

reports. not require CMS.

Sec. 63.11................... Control device Requirements for Yes.............. Applies only if your

requirements. flares. source uses a flare

to control solvent

emissions. Subpart

GGGG does not

require flares.Sec. 63.12................... State authority State authority to Yes.............. ....................

and delegations. enforce standards.Sec. 63.13................... State/regional Addresses where Yes.............. ....................

addresses. reports,

notifications,

and requests are

sent.Sec. 63.14................... Incorporation by Test methods Yes.............. ....................

reference. incorporated by

reference.Sec. 63.15................... Availability of Public and Yes.............. ....................

information and confidential

confidentiality. information.---------------------------------------------------------------------------------------------------------------- [66 FR 19011, Apr. 12, 2001, as amended at 67 FR 16321, Apr. 5, 2002; 71 FR 20463, Apr. 20, 2006]