(a) You must install, maintain, and operate a thermal oxidizer or other control device or implement a process modification that reduces formaldehyde emissions from each drying and curing oven to the emission limits specified in Sec. 63.2983.
(b) You must comply with the operating limits specified in Sec. 63.2984. The operating limits prescribe the requirements for demonstrating continuous compliance based on the OMM plan. You must begin complying with the operating limits on the date by which you must complete the initial performance test.
(c) You must conduct a performance test according to Sec. Sec. 63.2991, 63.2992, and 63.2993 to demonstrate compliance for each drying and curing oven subject to the emission limits in Sec. 63.2983, and to establish or modify the operating limits or ranges for process or control device parameters that will be monitored to demonstrate continuous compliance.
(d) You must install, calibrate, maintain, and operate devices that monitor the parameters specified in your OMM plan at the frequency specified in the plan. All continuous parameter monitoring systems must be installed and operating no later than the applicable compliance date specified in Sec. 63.2985.
(e) You must prepare and follow a written OMM plan as specified in Sec. 63.2987.
(f) You must comply with the monitoring, recordkeeping, notification, and reporting requirements of this subpart as required by Sec. Sec. 63.2996 through 63.3000.
(g) You must comply with the requirements in paragraphs (g)(1) through (3) of this section.
(1) You must be in compliance with the emission limits in Sec. 63.2983 and the operating limits in Sec. 63.2984 at all times, except during periods of startup, shutdown, or malfunction.
(2) You must always operate and maintain your affected source, including air pollution control and monitoring equipment, according to the provisions in Sec. 63.6(e)(1).
(3) You must develop a written SSMP according to the provisions in Sec. 63.6(e)(3). The SSMP must address the startup, shutdown, and corrective actions taken for malfunctioning process and air pollution control equipment. [67 FR 17835, Apr. 11, 2002, as amended at 71 FR 20464, Apr. 20, 2006]
Operation, Maintenance, and Monitoring Plan