(a) New and reconstructed affected sources. For a new or reconstructed affected source, you must meet the requirements of paragraphs (a)(1) through (4) of this section.
(1) All emission capture systems, add-on control devices, and CPMS must be installed and operating no later than the applicable compliance date specified in Sec. 63.4883. Except for solvent recovery systems for which you conduct liquid-liquid material balances according to Sec. 63.4961(j), you must conduct a performance test of each capture system and add-on control device according to Sec. Sec. 63.4963, 63.4964, and 63.4965, and establish the operating limits required by Sec. 63.4892, no later than 180 days after the applicable compliance date specified in Sec. 63.4883. For a solvent recovery system for which you conduct liquid-liquid material balances according to Sec. 63.4961(j), you must initiate the first material balance no later than 180 days after the applicable compliance date specified in Sec. 63.4883.
(2) You must develop and begin implementing the work practice plan required by Sec. 63.4893 no later than the compliance date specified in Sec. 63.4883.
(3) You must complete the initial compliance demonstration for the initial compliance period according to the requirements of Sec. 63.4961. The initial compliance period begins on the applicable compliance date specified in Sec. 63.4883 and ends on the last day of the first full month following the compliance date. The initial compliance demonstration includes the results of emission capture system and add-on control device performance tests conducted according to Sec. Sec. 63.4963, 63.4964, and 63.4965; results of liquid-liquid material balances conducted according to Sec. 63.4961(j); calculations showing whether the organic HAP emission rate for the initial compliance period was equal to or less than the emission limit in Sec. 63.4890; the operating limits established during the performance tests and the results of the continuous parameter monitoring required by Sec. 63.4967; and documentation of whether you developed and implemented the work practice plan required by Sec. 63.4893.
(4) You do not need to comply with the operating limits for the emission capture system and add-on control device required by Sec. 63.4892 until after you have completed the performance tests specified in paragraph (a)(1) of this section. Instead, you must maintain a log detailing the operation and maintenance of the emission capture system, add-on control device, and continuous parameter monitors during the period between the compliance date and the performance test. You must begin complying with the operating limits for your affected source on the date you complete the performance tests specified in paragraph (a)(1) of this section. The requirements in this paragraph (a)(4) do not apply to solvent recovery systems for which you conduct liquid-liquid material balances.
(b) Existing affected sources. For an existing affected source, you must meet the requirements of paragraphs (b)(1) through (3) of this section.
(1) All emission capture systems, add-on control devices, and CPMS must be installed and operating no later than the applicable compliance date specified in Sec. 63.4883. Except for solvent recovery systems for which you conduct liquid-liquid material balances according to Sec. 63.4961(j), you must conduct a performance test of each capture system and add-on control device according to the procedures in Sec. Sec. 63.4963, 63.4964, and 63.4965, and establish the operating limits required by Sec. 63.4892, no later than the compliance date specified in Sec. 63.4883. For a solvent recovery system for which you conduct liquid-liquid material balances according to Sec. 63.4961(j), you must initiate the first material balance no later than the compliance date specified in Sec. 63.4883.
(2) You must develop and begin implementing the work practice plan required by Sec. 63.4893 no later than the compliance date specified in Sec. 63.4883.
(3) You must complete the initial compliance demonstration for the initial compliance period according to the requirements of Sec. 63.4961. The initial compliance period begins on the applicable compliance date specified in Sec. 63.4883 and ends on the last day of the first full month following the compliance date. The initial compliance demonstration includes the results of emission capture system and add-on control device performance tests conducted according to Sec. Sec. 63.4963, 63.4964, and 63.4965; results of liquid-liquid material balances conducted according to Sec. 63.4961(j); calculations showing whether the organic HAP emission rate for the initial compliance period was equal to or less than the emission limit in Sec. 63.4890(c); the operating limits established during the performance tests and the results of the continuous parameter monitoring required by Sec. 63.4967; and documentation of whether you developed and implemented the work practice plan required by Sec. 63.4893.