(a) This subpart can be implemented and enforced by the U.S. EPA, or a delegated authority such as the applicable State, local, or Tribal agency. If the U.S. EPA Administrator has delegated authority to a State, local, or Tribal agency, then that agency, in addition to the U.S. EPA, has the authority to implement and enforce this subpart. Contact the applicable U.S. EPA Regional Office to find out if implementation and enforcement of this subpart is delegated to a State, local, or Tribal agency.
(b) In delegating implementation and enforcement authority of this subpart to a State, local, or Tribal agency under subpart E of this part, the authorities contained in paragraph (c) of this section are retained by the Administrator of U.S. EPA and cannot be transferred to the State, local, or Tribal agency.
(c) The authorities that cannot be delegated to State, local, or Tribal agencies are as specified in paragraphs (c)(1) through (4) of this section.
(1) Approval of alternatives to the requirements in Sec. Sec. 63.701 and 63.703.
(2) Approval of major alternatives to test methods under Sec. 63.7(e)(2)(ii) and (f), as defined in Sec. 63.90, and as required in this subpart.
(3) Approval of major alternatives to monitoring under Sec. 63.8(f), as defined in Sec. 63.90, and as required in this subpart.
(4) Approval of major alternatives to recordkeeping and reporting under Sec. 63.10(f), as defined in Sec. 63.90, and as required in this subpart. [68 FR 37352, June 23, 2003]
Sec. Table 1 to Subpart EE of Part 63--Applicability of General
Provisions to Subpart EE ------------------------------------------------------------------------
Applies to subpart
Reference EE Comment------------------------------------------------------------------------63.1(a)(1)................. Yes................ Additional terms
defined in Sec.
63.702(a); when
overlap between
subparts A and EE
occurs, subpart EE
takes precedence.63.1(a)(2)-(14)............ Yes.63.1(b)(1)-(3)............. Yes.63.1(c)(1)................. Yes................ Subpart EE specifies
the applicability of
each paragraph in
subpart A to sources
subject to subpart
EE.63.1(c)(2)................. No................. The applicability of
Sec. Sec.
63.701(a)(2) and
63.703 (b) and (h) to
a source does not in
and of itself make a
source subject to
part 70.63.1(c)(4)-(5)............. Yes.63.1(e).................... Yes.63.2....................... Yes................ Additional terms
defined in Sec.
63.702(a); when
overlap between
subparts A and EE
occurs, subpart EE
takes precedence.63.3....................... Yes................ Units specific to
subpart EE are
defined in subpart
EE.63.4(a)(1)-(3)............. Yes.63.4(a)(5)................. Yes.63.4(b).................... Yes.63.4(c).................... Yes.
63.5(a).................... Yes.63.5(b)(1)................. Yes.63.5(b)(3)-(6)............. Yes.63.5(d).................... Yes.63.5(e).................... Yes.63.5(f).................... Yes.63.6(a).................... Yes.63.6(b)(1)-(5)............. Yes.63.6(b)(7)................. Yes.63.6(c)(1)-(2)............. Yes.63.6(c)(5)................. Yes.63.6(e)(1)-(2)............. Yes.63.6(e)(3)................. Yes................ Owners or operators of
affected sources
subject to subpart EE
do not need to
address startups and
shutdowns because the
emission limitations
apply during these
times.63.6(f)(1)................. No................. Sec. 63.701(f) of
subpart EE specifies
when the standards
apply.63.6(f)(2)(i)-(ii)......... Yes.63.6(f)(2)(iii)............ Yes................ Sec. 63.705(a)(3) of
subpart EE includes
additional
circumstances under
which previous
capture device
demonstrations are
acceptable to show
compliance.63.6(f)(2)(iv)-(v)......... Yes.63.6(f)(3)................. Yes.63.6(g).................... Yes.63.6(h)(1)................. No................. Sec. 63.701(f) of
subpart EE specifies
when the standards
apply.63.6(h)(2)(i).............. Yes.63.6(h)(2)(iii)............ Yes.63.6(h)(4)................. Yes................ This requirement
applies only for the
visible emission test
required under Sec.
63.705(g)(2).63.6(h)(5)(i)-(iii)........ Yes.63.6(h)(5)(v).............. No.63.6(h)(6)................. Yes.63.6(h)(7)................. No.63.6(h)(8)................. Yes.63.6(h)(9)................. No.63.6(i)(1)-(14)............ Yes................ Sec. 63.703(c)(4) of
subpart EE shall not
be considered
emissions averaging
for the purposes of
Sec.
63.6(i)(4)(i)(B).63.6(i)(16)................ Yes.63.6(j).................... Yes.63.7(a)(1)................. Yes.63.7(a)(2)(i)-(vi)......... Yes.63.7(a)(2)(ix)............. Yes.63.7(a)(3)................. Yes.63.7(b).................... Yes.63.7(c).................... Yes.63.7(d).................... Yes.63.7(e).................... Yes................ Sec. 63.7(e)
establishes the
minimum performance
test requirements.
This section does not
preclude owners or
operators from
conducting multiple
test runs under
alternate operating
conditions to
establish an
appropriate range of
compliance operating
parameter values in
accordance with Sec.
63.704(b)(11)(i) of
subpart EE. Also as
required in Sec.
63.701(f) of subpart
EE, the emissions
standards apply
during startup and
shutdown.63.7(f).................... Yes.63.7(g)(1)................. Yes.63.7(g)(3)................. Yes.63.7(h).................... Yes.63.8(a)(1)-(2)............. Yes.63.8(a)(4)................. Yes.63.8(b)(1)................. Yes.63.8(b)(2)................. No................. Sec. 63.704 of
subpart EE specifies
monitoring locations;
when multiple
emission points are
tied to one central
control device, the
monitors are located
at the central
control device.63.8(b)(3)................. Yes.63.8(c)(1)-(3)............. Yes.63.8(c)(4)................. Yes................ Provisions related to
COMS, however, do not
apply.63.8(c)(5)................. No.63.8(c)(6)-(8)............. Yes.63.8(d).................... Yes.63.8(e).................... Yes.63.8(f)(1)-(6)............. Yes.63.8(g)(1)-(5)............. Yes.63.9(a).................... Yes.63.9(b).................... Yes.63.9(c).................... Yes.63.9(d).................... Yes.63.9(e).................... Yes.63.9(f).................... Yes.
63.9(g)(1)................. Yes.63.9(g)(2)................. No.63.9(g)(3)................. Yes.63.9(h)(1)-(3)............. Yes.63.9(h)(5)-(6)............. Yes.63.9(i).................... Yes.63.9(j).................... Yes.63.10(a)................... Yes.63.10(b)(1)................ Yes.63.10(b)(2)................ Yes................ Except information on
startup and shutdown
periods is not
necessary because the
standards apply
during these time
periods.63.10(b)(3)................ Yes.63.10(c)(1)................ Yes.63.10(c)(5)-(8)............ Yes................ Except information on
startup and shutdown
periods is not
necessary because the
standards apply
during these times.63.10(c)(10)-(15).......... Yes................ Except information on
startup and shutdown
periods is not
necessary because the
standards apply
during these times.63.10(d)(1)-(2)............ Yes.63.10(d)(3)................ Yes................ This requirement
applies only for the
visible emissions
test required under
Sec. 63.705(g)(2).
The results of
visible emissions
tests under Sec.
63.704(e) shall be
reported as required
in Sec.
63.10(e)(3).63.10(d)(4)................ Yes.63.10(d)(5)................ Yes................ Except information on
startup and shutdown
periods is not
necessary because the
standards apply
during these times.63.(10)(e)(1).............. Yes.63.10(e)(2)(i)............. Yes.63.10(e)(2)(ii)............ No.63.10(e)(3)(i)-(v)......... Yes.63.10(e)(3)(vi)-(viii)..... Yes................ Except emissions/CMS
performance during
startup and shutdown
do not need to be
specified because the
standards apply
during startup and
shutdown.63.10(e)(4)................ No.63.10(f)................... Yes.63.11-63.15................ Yes.------------------------------------------------------------------------ Subpart FF [Reserved]
Subpart GG_National Emission Standards for Aerospace Manufacturing and
Rework Facilities
Source: 60 FR 45956, Sept. 1, 1996, unless otherwise noted.