Terms used in this subpart are defined in the CAA; in 40 CFR 63.2, and in this section:
CAA means the Clean Air Act (42 U.S.C. 7401 et seq., as amended by Public Law 101-549, 104 Statute 2399).
Area source means any stationary source of HAP that is not a major source as defined in this part.
Combustion turbine engine means a device in which air is compressed in a compressor, enters a combustion chamber, and is compressed further by the combustion of fuel injected into the combustion chamber. The hot compressed combustion gases then expand over a series of curved vanes or blades arranged on a central spindle that rotates.
Deviation means any instance in which an affected source subject to this subpart, or an owner or operator of such a source:
(1) Fails to meet any requirement or obligation established by this subpart, including but not limited to any emission limitations;
(2) Fails to meet any term or condition that is adopted to implement an applicable requirement in this subpart and that is included in the operating permit for any affected source required to obtain such a permit; or
(3) Fails to meet any emission limitation in this subpart during malfunction, regardless or whether or not such failure is permitted by this subpart.
Engine means any internal combustion engine, any combustion turbine engine, or any rocket engine.
Engine Test Cell/Stand means any apparatus used for testing uninstalled stationary or uninstalled mobile (motive) engines.
Hazardous Air Pollutant (HAP) means any air pollutant listed in or pursuant to section 112(b) of the CAA.
Internal combustion engine means a device in which air enters a combustion chamber, is mixed with fuel, compressed in the chamber, and combusted. Fuel may enter the combustion chamber with the air or be injected into the combustion chamber. Expansion of the hot combustion gases in the chamber rotates a shaft, either through a reciprocating or rotary action. For purposes of this subpart, this definition does not include combustion turbine engines.
Major source, as used in this subpart, shall have the same meaning as in Sec. 63.2.
Malfunction means any sudden, infrequent, and not reasonably preventable failure of air pollution control equipment, process equipment, or a process to operate in a normal or usual manner which causes, or has the potential to cause, the emission limitations in an applicable standard to be exceeded. Failures that are caused in part by poor maintenance or careless operation are not malfunctions.
Rated power means the maximum power output of an engine in use.
Potential to emit means the maximum capacity of a stationary source to emit a pollutant under its physical and operational design. Any physical or operational limitation on the capacity of the stationary source to emit a pollutant, including air pollution control equipment and restrictions on hours of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part of its design if the limitation or the effect it would have on emissions is federally enforceable.
Responsible official means responsible official as defined by 40 CFR 70.2.
Rocket engine means a device consisting of a combustion chamber in which materials referred to as propellants, which provide both the fuel and the oxygen for combustion, are burned. Combustion gases escape through a nozzle, providing thrust.
Uninstalled engine means an engine not installed in, or an integrated part of, the final product. [68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]
Sec. Table 1 to Subpart PPPPP of Part 63--Emission Limitations
You must comply with the emission limits that apply to your affected source in the following table as required by Sec. 63.9300. ------------------------------------------------------------------------
For each new or reconstructed affected
source located at a major source You must meet one of the
facility that is used in whole or in following emission limitations:
part for testing. . .------------------------------------------------------------------------1. internal combustion engines with a. limit the concentration of
rated power of 25 hp (19 kW) or more. CO or THC to 20 ppmvd or less
(corrected to 15 percent O2
content); or
b. achieve a reduction in CO or
THC of 96 percent or more
between the inlet and outlet
concentrations (corrected to
15 percent O2 content) of the
emission control device.------------------------------------------------------------------------
Sec. Table 2 to Subpart PPPPP of Part 63--Operating Limits
If you are required to comply with operating limits in Sec. 63.9302, you must comply with the applicable operating limits in the following table: ------------------------------------------------------------------------
and you must
demonstrate
For the following device. . You must meet the continuous
. following operating compliance with the
limit. . . operating limit by.
. .------------------------------------------------------------------------1. Thermal oxidizer......... a. The average i. Collecting the
combustion combustion
temperature in any temperature data
3-hour period must according to Sec.
not fall below the 63.9306(c);
combustion ii. Reducing the
temperature limit data to 3-hour
established block averages; and
according to Sec. iii. Maintaining the
63.9324(a). 3-hour average
combustion
temperature at or
above the
temperature limit.------------------------------------------------------------------------2. Catalytic oxidizer....... a. The average i. Collecting the
temperature temperature data
measured just according to Sec.
before the catalyst 63.9306(c);
bed in any 3-hour ii. Reducing the
period must not data to 3-hour
fall below the block averages; and
limit established iii. Maintaining the
according to Sec. 3-hour average
63.9324(b). temperature before
the catalyst bed at
or above the
temperature limit.
b. Either ensure i. Either collecting
that the average the temperature
temperature data according to
difference across Sec. 63.9306(c),
the catalyst bed in reducing the data
any 3-hour period to 3-hour block
does not fall below averages, and
the temperature maintaining the 3-
difference limit hour average
established temperature
according to Sec. difference at or
63.9324(b)(2) or above the
develop and temperature
implement an difference limit;
inspection and or
maintenance plan ii. Complying with
according to Sec. the inspection and
63.9324(b)(3) and maintenance plan
(4). developed according
to Sec.
63.9324(b)(3) and
(4).------------------------------------------------------------------------3. Emission capture system a. The direction of i. Collecting the
that is a PTE according to the air flow at all direction of air
Sec. 63.9322(a). times must be into flow; and either
the enclosure; and the facial velocity
either of air through all
natural draft
openings according
to Sec.
63.9306(d)(1) or
the pressure drop
across the
enclosure according
to Sec.
63.9306(d)(2); and
ii. Maintaining the
facial velocity of
air flow through
all natural draft
openings or the
pressure drop at or
above the facial
velocity limit or
pressure drop
limit, and
maintaining the
direction of air
flow into the
enclosure at all
times.
b. The average Follow the
facial velocity of requirements in 3ai
air through all and ii of this
natural draft table.
openings in the
enclosure must be
at least 200 feet
per minute; or
c. The pressure drop Follow the
across the requirements in 3ai
enclosure must be and ii of this
at least 0.007 inch table.
H2O, as established
in Method 204 of
appendix M to 40
CFR part 51.------------------------------------------------------------------------4. Emission capture system a. The average gas i. Collecting the
that is not a PTE according volumetric flow gas volumetric flow
to Sec. 63.9322(a). rate or duct static rate or duct static
pressure in each pressure for each
duct between a capture device
capture device and according to Sec.
add-on control 63.9306(d);
device inlet in any ii. Reducing the
3-hour period must data to 3-hour
not fall below the block averages; and
average volumetric iii. Maintaining the
flow rate or duct 3-hour average gas
static pressure volumetric flow
limit established rate or duct static
for that capture pressure for each
device according capture device at
Sec. 63.9306(d). or above the gas
volumetric flow
rate or duct static
pressure limit.------------------------------------------------------------------------
Sec. Table 3 to Subpart PPPPP of Part 63--Requirements for Initial
Compliance Demonstrations
As stated in Sec. 63.9321, you must demonstrate initial compliance with each emission limitation that applies to you according to the following table: ----------------------------------------------------------------------------------------------------------------
According to the
For each new or reconstructed You must. . . Using. . . following requirements.
affected source complying with. . . . .----------------------------------------------------------------------------------------------------------------1. The CO or THC outlet a. Demonstrate CO or i. EPA Methods 3A and You must demonstrate
concentration emission limitation. THC emissions are 20 10 of appendix A to 40 that the outlet
ppmvd or less. CFR part 60 for CO concentration of CO or
measurement or EPA THC emissions from the
Method 25A of appendix test cell/stand or
A to 40 CFR part 60 emission control device
for THC measurement; is 20 ppmvd or less,
or corrected to 15 percent
O2 content, using the
first 4-hour rolling
average after a
successful performance
evaluation.
ii. A CEMS for CO or This demonstration is
THC and O2 at the conducted immediately
outlet of the engine following a successful
test cell/stand or performance evaluation
emission control of the CEMS as required
device. in Sec. 63.9320(b).
The demonstration
consists of the first 4-
hour rolling average of
measurements. The CO or
THC concentration must
be corrected to 15
percent O2 content, dry
basis using Equation 1
in Sec. 63.9320.----------------------------------------------------------------------------------------------------------------2. The CO or THC percent reduction a. Demonstrate a i. You must conduct an You must demonstrate
emission limitation. reduction in CO or THC initial performance that the reduction in
of 96 percent or more. test to determine the CO or THC emissions is
capture and control at least 96 percent
efficiencies of the using the first 4-hour
equipment and to rolling average after a
establish operating successful performance
limits to be achieved evaluation. Your inlet
on a continuous basis; and outlet measurements
or must be on a dry basis
and corrected to 15
percent O2 content.
ii. A CEMS for CO or This demonstration is
THC and O2 at both the conducted immediately
inlet and outlet of following a successful
the emission control performance evaluation
device. of the CEMS as required
in Sec. 63.9320(b).
The demonstration
consists of the first 4-
hour rolling average of
measurements. The inlet
and outlet CO or THC
concentrations must be
corrected to 15 percent
O2 content using
Equation 1 in Sec.
63.9320. The reduction
in CO or THC is
calculated using
Equation 2 in Sec.
63.9320.----------------------------------------------------------------------------------------------------------------
Sec. Table 4 to Subpart PPPPP of Part 63--Initial Compliance With
Emission Limitations
As stated in Sec. 63.9330, you must demonstrate initial compliance with each emission limitation that applies to you according to the following table: ------------------------------------------------------------------------
You have demonstrated initial
For the. . . compliance if. . .------------------------------------------------------------------------1. CO or THC concentration emission The first 4-hour rolling
limitation. average CO or THC
concentration is 20 ppmvd or
less, corrected to 15 percent
O2 content.------------------------------------------------------------------------2. CO or THC percent reduction emission The first 4-hour rolling
limitation. average reduction in CO or THC
is 96 percent or more, dry
basis, corrected to 15 percent
O2 content.------------------------------------------------------------------------
Sec. Table 5 to Subpart PPPPP of Part 63--Continuous Compliance With
Emission Limitations
As stated in Sec. 63.9340, you must demonstrate continuous compliance with each emission limitation that applies to you according to the following table: ------------------------------------------------------------------------
For the. . . You must. . . By. . .------------------------------------------------------------------------1. CO or THC concentration a. Demonstrate CO or i. Collecting the
emission limitation. THC emissions are CPMS data according
20 ppmvd or less to Sec.
over each 4-hour 63.9306(a),
rolling averaging reducing the
period. measurements to 1-
hour averages; or
ii. Collecting the
CEMS data according
to Sec.
63.9307(a),
reducing the
measurements to 1-
hour averages,
correcting them to
15 percent O2
content, dry basis,
according to Sec.
63.9320;------------------------------------------------------------------------2. CO or THC percent a. Demonstrate a i. Collecting the
reduction emission reduction in CO or CPMS data according
limitation. THC of 96 percent to Sec.
or more over each 4- 63.9306(a),
hour rolling reducing the
averaging period. measurements to 1-
hour averages; or
ii. Collecting the
CEMS data according
to Sec.
63.9307(b),
reducing the
measurements to 1-
hour averages,
correcting them to
15 percent O2
content, dry basis,
calculating the CO
or THC percent
reduction according
to Sec. 63.9320.------------------------------------------------------------------------
Sec. Table 6 to Subpart PPPPP of Part 63--Requirements for Reports
As stated in Sec. 63.9350, you must submit each report that applies to you according to the following table: ------------------------------------------------------------------------
If you own or operate a new
or reconstructed affectedsource that must comply with The report must You must submit the
emission limitations, you contain. . . report. . .
must submit a. . .------------------------------------------------------------------------1. Compliance report........ a. If there are no Semiannually,
deviations from the according to the
emission requirements in
limitations that Sec. 63.9350.
apply to you, a
statement that
there were no
deviations from the
emission
limitations during
the reporting
period.
b. If there were no Semiannually,
periods during according to the
which the CEMS or requirements in
CPMS were out of Sec. 63.9350.
control as
specified in Sec.
63.8(c)(7), a
statement that
there were no
periods during
which the CEMS or
CPMS was out of
control during the
reporting period.
c. If you have a Semiannually,
deviation from any according to the
emission limitation requirements in
during the Sec. 63.9350.
reporting period,
the report must
contain the
information in Sec.
63.9350(c).
d. If there were Semiannually,
periods during according to the
which the CEMS or requirements in
CPMS were out of Sec. 63.9350.
control, as
specified in Sec.
63.8(c)(7), that
report must contain
the information in
Sec. 63.9350(d).
e. If you had an SSM Semiannually,
of a control device according to the
or associated requirements in
monitoring Sec. 63.9350.
equipment during
the reporting
period, the report
must include the
information in Sec.
63.10(d)(5)(i).------------------------------------------------------------------------
Sec. Table 7 to Subpart PPPPP of Part 63--Applicability of General
Provisions to Subpart PPPPP
As stated in 63.9365, you must comply with the General Provisions in Secs. 63.1 through 63.15 that apply to you according to the following table: ----------------------------------------------------------------------------------------------------------------
Applies to subpart
Citation Subject Brief description PPPPP----------------------------------------------------------------------------------------------------------------Sec. 63.1(a)(1)..................... Applicability.......... General applicability Yes. Additional terms
of the General defined in Sec.
Provisions. 63.9375.Sec. 63.1(a)(2)-(4)................. Applicability.......... Applicability of source Yes.
categories.Sec. 63.1(a)(5)..................... [Reserved].............Sec. 63.1(a)(6)-(7)................. Applicability.......... Contact for source Yes.
category information;
extension of
compliance through
early reduction.Sec. 63.1(a)(8)..................... Applicability.......... Establishment of State No. Refers to State
rules or programs. programs.Sec. 63.1(a)(9)..................... [Reserved].............Sec. 63.1(a)(10)-(14)............... Applicability.......... Explanation of time Yes.
periods, postmark
deadlines.Sec. 63.1(b)(1)..................... Applicability.......... Initial applicability.. Yes. Subpart PPPPP
clarifies
applicability at Sec.
63.9285.Sec. 63.1(b)(2)..................... Applicability.......... Title V operating Yes. All major affected
permit-reference to sources are required
part 70. to obtain a Title V
permit.Sec. 63.1(b)(3)..................... Applicability.......... Record of applicability Yes.
determination.Sec. 63.1(c)(1)..................... Applicability.......... Applicability after Yes. Subpart PPPPP
standards are set. clarifies the
applicability of each
paragraph of subpart A
to sources subject to
subpart PPPPP.Sec. 63.1(c)(2)..................... Applicability.......... Title V permit No. Area sources are
requirement for area not subject to subpart
sources. PPPPP.Sec. 63.1(c)(3)..................... [Reserved].............Sec. 63.1(c)(4)..................... Applicability.......... Extension of compliance No. Existing sources
for existing sources. are not covered by the
substantive control
requirements of
subpart PPPPP.Sec. 63.1(c)(5)..................... Applicability.......... Notification Yes.
requirements for an
area source becoming a
major source.Sec. 63.1(d)........................ [Reserved].............Sec. 63.1(e)........................ Applicability.......... Applicability of permit Yes.
program before a
relevant standard has
been set.Sec. 63.2........................... Definitions............ Definitions for Part 63 Yes. Additional
standards. definitions are
specified in Sec.
63.9375.Sec. 63.3........................... Units and Abbreviations Units and abbreviations Yes.
for Part 63 standards.Sec. 63.4........................... Prohibited Activities.. Prohibited activities; Yes.
compliance date;
circumvention,
severability.Sec. 63.5(a)........................ Construction/ Construction and Yes.
Reconstruction. reconstruction--applic
ability.Sec. 63.5(b)(1)..................... Construction/ Requirements upon Yes.
Reconstruction. construction or
reconstruction.Sec. 63.5(b)(2)..................... [Reserved].Sec. 63.5(b)(3)..................... Construction/ Approval of Yes.
Reconstruction. construction.Sec. 63.5(b)(4)..................... Construction/ Notification of Yes.
Reconstruction. construction.Sec. 63.5(b)(5)..................... Construction/ Compliance............. Yes.
Reconstruction.Sec. 63.5(b)(6)..................... Construction/ Addition of equipment.. Yes.
Reconstruction.Sec. 63.5(c)........................ [Reserved]Sec. 63.5(d)........................ Construction/ Application for Yes.
Reconstruction. construction
reconstruction.Sec. 63.5(e)........................ Construction/ Approval of Yes.
Reconstruction. construction or
reconstruction.Sec. 63.5(f)........................ Construction/ Approval of Yes.
Reconstruction. construction or
reconstruction based
on prior State review.Sec. 63.6(a)........................ Applicability.......... Applicability of Yes.
standards and
monitoring
requirements.Sec. 63.6(b)(1)-(2)................. Compliance Dates for Standards apply at Yes.
New and Reconstructed effective date; 3
Sources. years after effective
date; upon startup; 10
years after
construction or
reconstruction
commences for 112(f).
Sec. 63.6(b)(3)..................... Compliance Dates for Compliance dates for No. Compliance is
New and Reconstructed sources constructed or required by startup or
Sources. reconstructed before effective date.
effective date.Sec. 63.6(b)(4)..................... Compliance Dates for Compliance dates for Yes.
New and Reconstructed sources also subject
Sources. to Sec. 112(f)
standards.Sec. 63.6(b)(5)..................... Compliance Dates for Notification........... Yes.
New and Reconstructed
Sources.Sec. 63.6(b)(6)..................... [Reserved].Sec. 63.6(b)(7)..................... Compliance Dates for Compliance dates for Yes.
New and Reconstructed new and reconstructed
Sources. area sources that
become major.Sec. 63.6(c)(1)-(2)................. Compliance Dates for Effective date No. Existing sources
Existing Sources. establishes compliance are not covered by the
date. substantive control
requirements of
subpart PPPPP.Sec. 63.6(c)(3)-(4)................. [Reserved].Sec. 63.6(c)(5)..................... Compliance Dates for Compliance dates for Yes. If the area source
Existing Sources. existing area sources become a major source
that becomes major. by addition or
reconstruction, the
added or reconstructed
portion will be
subject to subpart
PPPPP.Sec. 63.6(d)........................ [Reserved].Sec. 63.6(e)(1)-(2)................. Operation and Operation and Yes. Except that you
Maintenance maintenance. are not required to
Requirements. have an SSMP for
control devices and
associated monitoring
equipment.Sec. 63.6(e)(3)..................... SSMP................... 1. Requirement for SSM Yes. You must develop
and SSMP. an SSMP for each
2. Content of SSMP..... control device and
associated monitoring
equipment.Sec. 63.6(f)(1)..................... Compliance Except You must comply with Yes, but you must
During SSM. emission standards at comply with emission
all times except standards at all times
during SSM of control except during SSM of
devices or associated control devices and
monitoring equipment. associated monitoring
equipment only.Sec. 63.6(f)(2)-(3)................. Methods for Determining Compliance based on Yes.
Compliance. performance test,
operation and
maintenance plans,
records, inspection.Sec. 63.6(g)(1)-(3)................. Alternative Standard... Procedures for getting Yes.
an alternative
standard.Sec. 63.6(h)........................ Opacity/Visible Requirements for No. Subpart PPPPP does
Emission (VE) opacity/VE standards. not establish opacity/
Standards. VE standards and does
not require continuous
opacity monitoring
systems (COMS).Sec. 63.6(i)(1)-(14)................ Compliance Extension... Procedures and criteria No. Compliance
for Administrator to extension provisions
grant compliance apply to existing
extension. sources, which do not
have emission
limitations in subpart
PPPPP.Sec. 63.6(j)........................ Presidential Compliance President may exempt Yes.
Exemption. source category from
requirement to comply
with rule.Sec. 63.7(a)(1)-(2)................. Performance Test Dates. Dates for conducting Yes.
initial performance
testing and other
compliance
demonstrations: Must
conduct within 180
days after first
subject to rule.Sec. 63.7(a)(3)..................... Section 114 Authority.. Administrator may Yes.
require a performance
test under CAA Section
114 at any time.Sec. 63.7(b)(1)..................... Notification Must notify Yes.
Performance Test. Administrator 60 days
before the test.
Sec. 63.7(b)(2)..................... Notification of If have to reschedule Yes.
Rescheduling. performance test, must
notify Administrator 5
days before schedule
date of rescheduled
date.Sec. 63.7(c)........................ Quality Assurance/Test 1. Requirement to Yes.
Plan. submit site-specific
test plan 60 days
before the test or on
date Administrator
agrees with.
2. Test plan approval Yes.
procedures.
3. Performance audit Yes.
requirements.
4. Internal and Yes.
external QA procedures
for testing.Sec. 63.7(d)........................ Testing Facilities..... Requirements for Yes.
testing facilities.Sec. 63.7(e)(1)..................... Conditions for Performance tests must Yes.
Conducting Performance be conducted under
Tests. representative
conditions; cannot
conduct performance
tests during SSM; not
a violation to exceed
standard during SSM.Sec. 63.7(e)(2)..................... Conditions for Must conduct according Yes.
Conducting Performance to rule and EPA test
Tests. methods unless
Administrator approves
alternative.Sec. 63.7(e)(3)..................... Test Run Duration...... 1. Must have three test Yes.
runs of at least 1
hour each.
2. Compliance is based Yes.
on arithmetic mean of
three runs.
3. Conditions when data Yes.
from an additional
test run can be used.Sec. 63.7(e)(4)..................... Other Performance Administrator may Yes.
Testing. require other testing
under section 114 of
the CAA.Sec. 63.7(f)........................ Alternative Test Method Procedures by which Yes.
Administrator can
grant approval to use
an alternative test
method.Sec. 63.7(g)........................ Performance Test Data 1. Must include raw Yes.
Analysis. data in performance
test report.
2. Must submit Yes.
performance test data
60 days after end of
test with the
Notification of
Compliance Status.
3. Keep data for 5 Yes.
years.Sec. 63.7(h)........................ Waiver of Tests........ Procedures for Yes.
Administrator to waive
performance test.Sec. 63.8(a)(1)..................... Applicability of Subject to all Yes. Subpart PPPPP
Monitoring monitoring contains specific
Requirements. requirements in requirements for
standard. monitoring at Sec.
63.9325.Sec. 63.8(a)(2)..................... Performance Performance Yes.
Specifications. Specifications in
appendix B of part 60
apply.Sec. 63.8(a)(3)..................... [Reserved]Sec. 63.8(a)(4)..................... Monitoring with Flares. Unless your rule says No. Subpart PPPPP does
otherwise, the not have monitoring
requirements for requirements for
flares in 63.11 apply. flares.Sec. 63.8(b)(1)..................... Monitoring............. Must conduct monitoring Yes.
according to standard
unless Administrator
approves alternative.Sec. 63.8(b)(2)-(3)................. Multiple Effluents and 1. Specific Yes.
Multiple Monitoring requirements for
Systems. installing monitoring
systems.
2. Must install on each Yes.
effluent before it is
combined and before it
is released to the
atmosphere unless
Administrator approves
otherwise.
3. If more than one Yes.
monitoring system on
an emission point,
must report all
monitoring system
results, unless one
monitoring system is a
backup.Sec. 63.8(c)(1)..................... Monitoring System Maintain monitoring Yes.
Operation and system in a manner
Maintenance. consistent with good
air pollution control
practices.Sec. 63.8(c)(1)(i).................. Routine and predictable 1. Keep parts for Yes.
CMS malfunctions. routine repairs of CMS
readily available.
2. Reporting
requirements for SSM
when action is
described in SSMP.
3. Reporting Yes.
requirements for SSM
when action is
described in SSMP.Sec. 63.8(c)(1)(ii)................. SSM of CMS Not in SSMP. Reporting requirements Yes.
for SSM of CMS when
action is not
described in SSMP.Sec. 63.8(c)(1)(iii)................ Compliance with 1. How Administrator Yes.
Operation and determines if source
Maintenance complying with
Requirements. operation and
maintenance
requirements.
2. Review of source O&M;
procedures, records,
manufacturer's
instructions and
recommendations, and
inspection.Sec. 63.8(c)(2)-(3)................. Monitoring System 1. Must install to get Yes.
Installation. representative
emission of parameter
measurements.
2. Must verify Yes.
operational status
before or at
performance test.Sec. 63.8(c)(4)..................... Continuous Monitoring 1. CMS must be No. Follow specific
System (CMS) operating except requirements in Sec.
Requirements. during breakdown, out 63.9335(a) and (b) of
of control, repair, subpart PPPPP.
maintenance, and high-
level calibration
drifts.
2. COMS must have a No. Follow specific
minimum of one cycle requirements in Sec.
of sampling and 63.9335(a) and (b) of
analysis for each subpart PPPP.
successive 10-second
period and one cycle
of data recording for
each successive 6-
minute period.
3. CEMS must have a No. Follow specific
minimum of one cycle requirements in Sec.
of operation for each 63.9335(a) and (b) of
successive 15-minute subpart PPPPP.
period.Sec. 63.8(c)(5)..................... COMS Minimum Procedures COMS minimum procedures No. Subpart PPPPP does
not have opacity/VE
standards.Sec. 63.8(c)(6)-(8)................. CMS Requirements....... Zero and high-level Yes. Except that PPPP
calibration check does not require COMS.
requirements, out-of-
control periods.Sec. 63.8(d)........................ CMS Quality Control.... 1. Requirements for CMS Yes.
quality control,
including calibration,
etc.
2. Must keep quality Yes.
control plan on record
for 5 years. Keep old
versions for 5 years
after revisions.Sec. 63.8(e)........................ CMS Performance Notification, Yes. Except for Sec.
Evaluation. performance evaluation 63.8(e)(5)(ii), which
test plan, reports. applies to COMS.
Sec. 63.8(f)(1)-(5)................. Alternative Monitoring Procedures for Yes.
Method. Administrator to
approve alternative
monitoring.Sec. 63.8(f)(6)..................... Alternative to Relative Procedures for Yes.
Accuracy Test. Administrator to
approve alternative
relative accuracy
tests for CEMS.Sec. 63.8(g)........................ Data Reduction......... 1. COMS 6-minute Yes. Except that
averages calculated provisions for COMS
over at least 36 are not applicable.
evenly spaced data Averaging periods for
points. demonstrating
2. CEMS 1-hour averages compliance are
computed over at least specified at Sec.
4 equally spaced data 63.9340.
points.Sec. 63.8(g)(5)..................... Data Reduction......... Data that cannot be No. Specific language
used in computing is located at Sec.
averages for CEMS and 63.9335(a).
COMS.Sec. 63.9(a)........................ Notification Applicability and State Yes.
Requirements. delegation.Sec. 63.9(b)(1)-(5)................. Initial Notifications.. 1. Submit notification Yes.
subject 120 days after
effective date.
2. Notification of Yes.
intent to construct/
reconstruct;
notification of
commencement of
construct/
reconstruct;
notification of
startup.
3. Contents of each.... Yes.Sec. 63.9(c)........................ Request for Compliance Can request if cannot No. Compliance
Extension. comply by date or if extensions do not
installed BACT/LAER. apply to new or
reconstructed sources.Sec. 63.9(d)........................ Notification of Special For sources that Yes.
Compliance commence construction
Requirements for New between proposal and
Source. promulgation and want
to comply 3 years
after effective date.Sec. 63.9(e)........................ Notification of Notify Administrator 60 No. Subpart PPPPP does
Performance Test. days prior. not require
performance testing.Sec. 63.9(f)........................ Notification of Opacity/ Notify Administrator 30 No. Subpart PPPPP does
VE Test. days prior. not have opacity/VE
standards.Sec. 63.9(g)(1)..................... Additional Notification of Yes.
Notifications when performance evaluation.
Using CMS.Sec. 63.9(g)(2)..................... Additional Notification of use of No. Subpart PPPPP does
Notifications when COMS data. not contain opacity or
Using CMS. VE standards.Sec. 63.9(g)(3)..................... Additional Notification that Yes. If alternative is
Notifications when exceeded criterion for in use.
Using CMS. relative accuracy.Sec. 63.9(h)(1)-(6)................. Notification of 1. Contents............ Yes.
Compliance Status.
2. Due 60 days after Yes.
end of performance
test or other
compliance
demonstration, except
for opacity/VE, which
are due 30 days after.
3. When to submit to Yes.
Federal vs. State
authority.Sec. 63.9(i)........................ Adjustment of Submittal Procedures for Yes.
Deadlines. Administrator to
approve change in when
notifications must be
submitted.Sec. 63.9(j)........................ Change in Previous Must submit within 15 Yes.
Information. days after the change.Sec. 63.10(a)....................... Recordkeeping/Reporting 1. Applies to all, Yes.
unless compliance
extension.
2. When to submit to Yes.
Federal vs. State
authority.
3. Procedures for Yes.
owners of more than
one source.Sec. 63.10(b)(1).................... Recordkeeping/Reporting 1. General requirements Yes.
2. Keep all records Yes.
readily available.
3. Keep for 5 years.... Yes.Sec. 63.10(b)(2)(i)-(v)............. Records Related to SSM. 1. Occurrence of each Yes.
of operation (process
equipment).
2. Occurrence of each Yes.
malfunction of air
pollution equipment.
3. Maintenance on air Yes.
pollution control
equipment.
4. Actions during SSM.. Yes.
5. All information Yes.
necessary to
demonstrate
conformance with the
SSMP.Sec. 63.10(b)(2)(vi)-(xi)........... CMS Records............ Malfunctions, Yes.
inoperative, out of
control.Sec. 63.10(b)(2)(xii)............... Records................ Records when under Yes.
waiver.Sec. 63.10(b)(2)(xiii).............. Records................ Records when using Yes.
alternative to
relative accuracy test.Sec. 63.10(b)(2)(xiv)............... Records................ All documentation Yes.
supporting initial
notification and
notification of
compliance status.Sec. 63.10(b)(3).................... Records................ Applicability Yes.
determinations.Sec. 63.10(c)(1)-(6), (9)-(15)...... Records................ Additional records for Yes.
CEMS.Sec. 63.10(c)(7)-(8)................ Records................ Records of excess No. Specific language
emissions and is located at Sec.
parameter monitoring 63.9355 of subpart
exceedances for CMS. PPPPP.Sec. 63.10(d)(1).................... General Reporting Requirement to report.. Yes.
Requirements.Sec. 63.10(d)(2).................... Report of Performance When to submit to Yes.
Test Results. Federal or State
authority.Sec. 63.10(d)(3).................... Reporting Opacity or VE What to report and when No. Subpart PPPPP does
Observations. not have opacity/VE
standards.Sec. 63.10(d)(4).................... Progress Reports....... Must submit progress No. Compliance
reports on schedule if extensions do not
under compliance apply to new or
extension. reconstructed sources.Sec. 63.10(d)(5).................... SSM Reports............ Contents and submission Yes.Sec. 63.10(e)(1) and (2)(i)......... Additional CMS Reports. Additional CMS reports. Yes.Sec. 63.10(e)(2)(ii)................ Additional CMS Reports. COMS-related report.... No. Subpart PPPPP does
not require COMS.Sec. 63.10(e)(3).................... Additional CMS Reports. Excess emissions and No. Specific language
parameter exceedances is located in Sec.
reports. 63.9350 of subpart
PPPPP.Sec. 63.10(e)(4).................... Additional CMS Reports. Reporting COMS data.... No. Subpart PPPPP does
not require COMS.Sec. 63.10(f)....................... Waiver for Procedures for Yes.
Recordkeeping/ Administrator to waive.
Reporting.Sec. 63.11.......................... Control Device Requirements for flares No. Subpart PPPPP does
Requirements. not specify use of
flares for compliance.Sec. 63.12.......................... State Authority and State authority to Yes.
Delegations. enforce standards.Sec. 63.13.......................... Addresses of State Air Addresses where Yes.
Pollution Control reports,
Offices and EPA notifications, and
Regional Offices. requests are sent.Sec. 63.14.......................... Incorporations by Test methods Yes. ASTM D 6522-00 and
Reference. incorporated by ANSI/ASME PTC 19.10-
reference. 1981 (incorporated by
reference-See Sec.
63.14).Sec. 63.15.......................... Availability of Public and confidential Yes.
Information and information.
Confidentiality.---------------------------------------------------------------------------------------------------------------- [68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]
Subpart QQQQQ_National Emission Standards for Hazardous Air Pollutants
for Friction Materials Manufacturing Facilities
Source: 67 FR 64506, Oct. 18, 2002, unless otherwise noted.
What This Subpart Covers