(a) DOE OPMOs shall establish required property management controls relative to the implementation of systems contracting.
(b) DOE offices and designated contractors operating a materials management function who have not performed an initial feasibility study for the implementation of systems contracting shall perform such a study for selected commodity groups. The study may be accomplished over a period of time, until all commodity groups have been considered. The study should address functional requirements, activity levels of commodity groups and individual items, and potential impacts on local suppliers and small and disadvantaged businesses. An industrial relations analysis on existing labor relations and union contracts may also be necessary.
(c) As required in the DEAR, DOE offices and designated contractors are required to consider the use of GSA supply sources when economically advantageous to the Government. These sources must be considered in the conduct of the feasibility study.
(d) DOE contracting offices shall evaluate the initial cost benefit studies performed by contractors to verify the savings and other benefits of systems contracting, and shall approve its implementation. In those instances where a cost benefit study has previously been performed, the DOE contracting office shall ensure that those studies have been evaluated and the approval to proceed with systems contracting has been provided to the contractor in writing.
(e) DOE offices shall periodically reevaluate systems contracting operations conducted by their office and designated contractors to ensure that required property management controls are being followed.
Subpart 109 27.2_Management of Shelf-Life Materials