(a) The minimum pipe size for the initial charge must meet table 108.441 and the discharge of the required amount of CO2 must be completed within 2 minutes.
(b) The minimum pipe size for the delayed discharge must be at least 1.25 centimeters (\1/2\ inch) standard pipe.
(c) The pipe used for the initial discharge must not be used for the delayed discharge, except systems having a volume of less than 57 cubic meters (2,000 cubic feet).