CFR / 
Title 46
 / 
Part 153
 / 
Sec. 153.1500 Venting system rupture disks.
The master shall ensure that a relief valve exposed to a cargo after the failure of a rupture disk or breaking pin is cleaned and operates properly before the next cargo is loaded into the tank.