When table 1 references this section, the containment system must have a:
(a) Tank pressure gauge at the point where cargo flow is controlled during transfer; and
(b) Vapor return connection. [CGD 73-96, 42 FR 49027, Sept. 26, 1977; 42 FR 57126, Nov. 1, 1977, as amended by CGD 81-078, 50 FR 21173, May 22, 1985]
Cargo Gauging Systems