Code of Federal Regulations (alpha)

CFR /  Title 46  /  Part 170  /  Sec. 170.095 Data submittal for a vessel equipped to lift.

The following data must be submitted with the plans required by Sec. 170.075 if the vessel is engaged in lifting and is required to comply with subpart B of part 173 of this chapter:

(a) A graph of maximum hook load versus maximum crane radius.

(b) A table of crane radius versus the maximum distance above the main deck to which the hook load can be raised.

(c) A table showing maximum vertical and transverse moments at which the crane is to operate.